A high-voltage AC double-circuit 400 kV overhead power transmission line runs from the city of Elk (Poland) to the city of Alytus (Lithuania). This international 400 kV power transmission line is potentially one of the strongest magnetic field-generating sources in the area. This 400 kV voltage double-circuit overhead transmission line and its surroundings were analyzed using the mathematical analytical methods of superposition and reflections. This research paper includes the calculation of the numerical values of the magnetic field and its distribution. The research showed that the values of the magnetic field strength near the international 400 kV power transmission line exceed the threshold values permitted by relevant standards. This overhead power line is connected to the general (50 Hz) power system and generates a highly intense magnetic field. It is suggested that experimental trials should be undertaken in order to determine the maximum values of the magnetic field strength. For the purpose of mitigating these values, it is suggested that the height of the support bars should be increased or that any individual and commercial activities near the object under investigation should be restricted.
Smart energy meters supporting bidirectional data communication enable novel remote error monitoring applications. This research targets characterization of the systematic worst-case error of the previously published remote watthour meter’s gain estimation method based on the comparison of synchronous measurements by the reference and meter under test. To achieve the research aim a methodology based on global maximization of the systematic error objective function assuming the typical low voltage electrical distribution network operation parameters ranges as defined by the standard recommendations for network design. To cross verify the reliability of the assessed solutions the suggested error analysis methodology was implemented utilizing two stochastic global extremum search techniques (genetic algorithms, pattern search) and the third one utilizing nonlinear programming solver. It was determined that the wattmeter adjustment gain worst-case error does not exceed 0.5% if the remote wattmeter monitored load power factor is larger than 0.1 and a network is designed according to the recommendation of the acceptable voltage drop less than 5%. For a load exhibiting power factor larger than 0.9 the worst-case error was found to be less than 0.1%. It is concluded therefore that considering the systematic worst-case error the previously suggested remote wattmeter adjustment gain estimation method is suitable for remote error monitoring of Class 2 and Class 1 wattmeters.
The islanded mode of operation of an electric power system (EPS) that has generation capabilities provided by conventional thermal power plants, by a pumped-storage power station, or from an interlink with a neighboring electric power system through an HVDC BtB converter is addressed in this paper. The risk for electrical power systems to fall into an islanded mode has recently grown, as it is caused not just by technical reasons but by a geopolitical situation as well. The current strains demand the close consideration of problems related to EPS operation in an islanded mode. This paper considers several. The research covers the following issues. The response of the islanded system to a sudden and spasmodic load change is analyzed in cases when the system deals with the disturbance with internal resources alone and with the help of an HVDC BtB converter’s frequency control functionality. Analysis of the impact of the settings of the HVDC BtB converter on the system’s response to disturbances is presented and the optimal set of parameters found. The impact of the system’s extended inertia on the system’s response is evaluated by using an additional unit of the pumped-storage power station in synchronous condenser mode. Transients in the system when switching a unit operating in synchronous condenser mode on and off are analyzed. The capability of the system to withstand major disturbances, such as disconnection of the pumped-storage power station’s unit operating in a pump mode and disconnection of the HVDC BtB converter in emergency modes, if a situation demands, is researched. The research is carried out by numerical simulations using PSS Sincal Electricity Basic software. Updated operating parameters of the isolated power system and the LCC HVDC BtB converter, as well as frequency control automation provided by ABB, were used in the simulations.
1 September 2017 in Archives of Electrical Engineering
In Lithuanian and Polish electric power supply systems, the power transmission lines of 400 kV voltage represent one of the most potential sources of electric and magnetic fields generation. The 400 kV double-circuit overhead power transmission line and its surrounding environment were herby described and simulated through Finite Element Method usingCOMSOL Multiphysicsoftware package. This study includes magnetic and electric field calculations. The study shows that the values of magnetic field strength and electric field strength present in the vicinity of a 400 kV overhead power transmission line tend to exceed limit values established in the Normative. Measurements are suggested to be taken for the purpose of finding maximum values of magnetic and electric field strength. To reduce these values, it is recommended to increase the height of supports, and restrict human personal and economic activities.
This paper presents research on the mechanical characteristics of a synchronous axial magnetic coupling. The influence of the coupling structure on torque and axial force was analyzed. The considered parameters of the structure include the half-clutch diversity, the air-gap length between adjacent magnets, the magnetic characteristics of the backings’ material, and the shape of the backings. It was discovered that the ferromagnetic backings that partially shroud magnets of the coupling cause a significant decrease of the maximum torque. The maximum torque and the maximum axial force decrease in nonlinear manner in response to the increasing magnets’ height diversity, and the sensitivity of the parameters is larger in the upper range of the diversity. It was also disclosed that the air-gap length between the adjacent magnets has a minor influence on torque if the total volume of magnets is constant. A quantitative comparison of the maximum torque and maximum axial force for the couplings with both ferromagnetic backings, one ferromagnetic backing and with non-ferromagnetic backings is provided. The results were obtained using a 3D FEM numerical simulation. Physical experiments were performed for the numerical model verification.
In a constantly and rapidly changing global environment, one of the main priority tasks for every country is preserving, maintaining, and operating an independent and individually robust and stable energy system. This paper aims at researching electrical power systems’ (EPSs) behavior during desynchronization from a synchronous area, its stability in islanded mode, and its synchronization. The analysis of EPS behavior was accomplished utilizing numerical simulations in a widely used programming/simulation package. The sudden tripping of the EPS into an isolated island mode with known generation and load values was simulated, analyzed, and discussed. We investigated the behavior of an isolated EPS in the case of the loss of a certain amount of active power, and determined the maximum power that must be available to ensure the reliable operation of the isolated EPS and the power reserve that must be maintained to prevent the EPS from triggering UFLS. The simulation of the synchronization of an isolated EPS with a synchronous area was accomplished and analyzed. The obtained results were applied to reveal the sequence of actions that will help an EPS to ensure and maintain the stable and reliable operation of electrical installations during desynchronization.