Yanyong XIANG

Yanyong XIANG


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 June 2020 in Symmetry
Verified
Journal Article
Open access
PDF file
BMBO MI
BO MI
YXYanyong XIANG
Yanyong XIANG
The objective was to optimize the existing solution for the limit support pressure of a tunnel face. Firstly, based on the numerical simulation results, the existing three-dimensional analytical solution for pore water pressure distribution is expanded to a three-dimensional solution considering the pore water pressure distribution in the upper formation behind the tunnel face. Then, according to the results of physical model tests, a failure model considering the failure range in the upper formation behind the tunnel face is established, and the newly established three-dimensional solution for pore water pressure is introduced into the model, and then the limit effective support pressure of the tunnel face considering seepage is obtained by the method of soil–water joint calculation. Finally, the calculation results in this paper are compared with the experimental results, numerical simulation results and existing theoretical solutions. The major findings are as follows. The distribution of pore water pressure in the front and back strata above the tunnel face is basically symmetrical. The limit effective support pressure of the tunnel face will increase linearly with an increase in the hydraulic head difference between the tunnel face and the ground surface. The calculated results of the new limit equilibrium theory are obviously larger than those of the existing theory and numerical simulation and closer to the results of the physical model tests. Therefore, the new limit equilibrium model can better predict the limit effective support pressure of the tunnel face considering seepage and provide a reference for actual projects.


1 September 2017 in International Journal of Geomechanics
Verified
Journal Article
Closed access
YXYanyong XIANG
Yanyong XIANG
WSWenjie Song
Wenjie Song
Continuum upper-bound limit analyses in existing literature are based on empirical formulas or singular analytical solutions for a uniform-convergence type of tunnel boundary condition. This paper presents an upper-bound limit analysis of shield tunnel stability in undrained clays using complex variable displacement fields for four different ground-loss scenarios. The upper-bound theorem was applied on a prescribed perfect plastic Tresca kinematic zone with a slip line boundary to seek the supremum (minimal upper bound) of the tunnel stability number, which should not be exceeded to avoid collapse. For an imposed identical volume of ground loss, the maximum ground surface settlement was found to be the smallest for ground-loss Scenario A (circular convergence), larger for Scenario B (downward oval convergence), and much larger for Scenario C (halved oval convergence), which is slightly smaller than Scenario D (mixed oval convergence); the opposite is true for comparisons of the widths of the settlement troughs. Ground-loss Scenario A presents the worst case in terms of tunnel stability, with the smallest allowable stability number and the widest spread of the least favorable slip line boundary, while Scenario D is the second worst case with the second-smallest allowable stability number. Similar results were found, in sequential order, for Scenarios B and C. The presented approach, because of the complex variable solutions used, may extend upper-bound limit analyses to more complicated tunnel boundary conditions.

8 April 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXiongwen LUO
Xiongwen LUO
YXYanyong XIANG
Yanyong XIANG
CYChenyun Yu
Chenyun Yu
For a railway or highway tunnel under high water pressure during operation, various factors such as the design of the drainage system, material aging, and pipeline blockage must be considered for the tunnels to work with the parallel adit to drain and control the external water pressure on the tunnel lining. A simplified steady-state seepage model in a semi-infinite multi-connected domain for the tunnel and parallel adit was established and was solved iteratively using the complex variable method and the Schwartz alternating method. After verifying the numerical simulation, parametric analysis, orthogonal tests, and multivariate nonlinear regression were also carried out. Results show that the simplified theoretical model and its semi-analytical algorithm have a fast convergence speed, and the obtained regression formula is simple, which is suitable for calculation and parameter analysis. A scheme that primarily relies on the parallel adit for drainage would make the external water pressure of the lining facing the parallel adit side less than that of the opposite side. Therefore, to reduce pressure uniformly and meet the requirements of surrounding rock stability, the horizontal net distance between the parallel adit and the tunnel should be no less than the tunnel diameter. Drainage volume of the parallel adit is linearly negatively correlated with tunnel water pressure on the lining and has the most significant effect on pressure reduction. The influence of the vertical distance between the parallel adit and the tunnel on water pressure is small.

28 March 2019 in Energies
Verified
Journal Article
Open access
PDF file
DLDongdong Liu
Dongdong Liu
YXYanyong XIANG
Yanyong XIANG
Multiple fractures have been proposed for improving the heat extracted from an enhanced geothermal system (EGS). For calculating the production temperature of a multi-fracture EGS, previous analytical or semi-analytical methods have all been based on an infinite scale of fractures and one-dimensional conduction in the rock matrix. Here, a temporal semi-analytical method is presented in which finite-scale fractures and three-dimensional conduction in the rock matrix are both considered. Firstly, the developed model was validated by comparing it with the analytical solution, which only considers one-dimensional conduction in the rock matrix. Then, the temporal semi-analytical method was used to predict the production temperature in order to investigate the effects of fracture spacing and fracture number on the response of an EGS with a constant total injection rate. The results demonstrate that enlarging the spacing between fractures and increasing the number of fractures can both improve the heat extraction; however, the latter approach is much more effective than the former. In addition, the temporal semi-analytical method is applicable for optimizing the design of an EGS with multiple fractures located equidistantly or non-equidistantly.

30 January 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
YWYaze Wang
Yaze Wang
YXYanyong XIANG
Yanyong XIANG
The construction of pipe jacking has little impact on the environment and is usually used to build underground passages with shallow buried depths and short lengths. Compared with circular pipe jacking, rectangular pipe jacking has the advantages of shallow buried depth and high space utilization. Therefore, research on the excavation of rectangular pipe jacking is necessary. This paper establishes a cross-section model of shallow buried rectangular pipe jacking excavation. Taking advantage of complex functions for solving problems involving non-circular tunnels, an analytical solution is obtained using an approximate mapping function and potential functions in series forms for the stress and displacement of the stratum with a displacement condition at the excavation boundary and a stress condition at the ground surface boundary. The finite element simulation results and the engineering-measured data are used for comparisons and verifications. With the analytical solution of the complex function, the influence of selecting control points for the mapping function on the accuracy is calculated and analyzed, as well as the influence of the stratum loss rate, span, buried depth, and stratum unit weight on surface subsidence and major principal stress of the excavation boundary. The proposed analytical solution can be applied to the construction of rectangular pipe jacking tunnels.