Xiongwen LUO

Mr. Xiongwen LUO

Beijing Jiaotong University, Beijing, China
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
31 May 2023 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
XLXiongwen LUO
Xiongwen LUO
CYChenyun Yu
Chenyun Yu
YWYaze Wang
Yaze Wang

8 April 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
XLXiongwen LUO
Xiongwen LUO
YXYanyong XIANG
Yanyong XIANG
CYChenyun Yu
Chenyun Yu
For a railway or highway tunnel under high water pressure during operation, various factors such as the design of the drainage system, material aging, and pipeline blockage must be considered for the tunnels to work with the parallel adit to drain and control the external water pressure on the tunnel lining. A simplified steady-state seepage model in a semi-infinite multi-connected domain for the tunnel and parallel adit was established and was solved iteratively using the complex variable method and the Schwartz alternating method. After verifying the numerical simulation, parametric analysis, orthogonal tests, and multivariate nonlinear regression were also carried out. Results show that the simplified theoretical model and its semi-analytical algorithm have a fast convergence speed, and the obtained regression formula is simple, which is suitable for calculation and parameter analysis. A scheme that primarily relies on the parallel adit for drainage would make the external water pressure of the lining facing the parallel adit side less than that of the opposite side. Therefore, to reduce pressure uniformly and meet the requirements of surrounding rock stability, the horizontal net distance between the parallel adit and the tunnel should be no less than the tunnel diameter. Drainage volume of the parallel adit is linearly negatively correlated with tunnel water pressure on the lining and has the most significant effect on pressure reduction. The influence of the vertical distance between the parallel adit and the tunnel on water pressure is small.

14 January 2024 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
XLXiongwen LUO
Xiongwen LUO
YXYanyong XIANG
Yanyong XIANG
CYChenyun Yu
Chenyun Yu