Krzysztof Marian Tomiczek

Dr. Krzysztof Marian Tomiczek

orcid

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2015 in International Journal of Mining Science and Technology
Verified
Journal Article
Open access
PSPiotr Strzalkowski
Piotr Strzalkowski
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek

1 June 2022 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
SPS Pysmennyi
S Pysmennyi
APA Peremetchyk
A Peremetchyk
SCS Chukharev
S Chukharev
SFS Fedorenko
S Fedorenko
DAD Anastasov
D Anastasov
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek
Ensuring the correct development of the deposit is a priority production task, which is based on a scientifically grounded assessment of the geometrical characteristics of the mineral deposit and a clear understanding of the nature and quantity of the deposit’s re-serves. Aim of the study is a geological and industrial assessment of a mineral deposit, which provides for the correct determination of the quantity and quality of explored reserves, requires the collection and processing of such material, which would be sufficient to draw up a technically correct and economically feasible project for the development of the deposit. The research methodology consists in mining and geometrical modeling and monitoring of subsoil based on progressive and classical methods and techniques for geometrization of the array of minerals and host rocks. This includes a set of measures aimed at collecting and evaluating the initial information, assessing its accuracy, mathematical processing and determining the optimal and most effective methods for solving the problem of geometrization of the field. The results allow us to practically solve the problems of mining operations related to the assessment of reserves of mineral deposits, their genesis, the nature of occurrence, quality, the possibility of sorting, forecasting and industrial development. An effective set of methods has been developed based on the statistical assessment of mineral deposits, as well as the use of the latest geoinformation systems, which provide the possibility of high-quality and accurate calculation and assessment of mineral deposits.

24 June 2019 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek
Rock masses are discontinuous medium. Using the program based on the Distinct Element Method (DEM) UDEC (Universal Distinct Element Code) a 2D model of the rock mass near the longwall face was built. The UDEC code, due to its properties, is particularly suitable for modelling discontinuous and jointed rock masses. The coal bed lying at a depth of 700m had a thickness of 3m and was mined by longwall system with caving. The total face advance was 415m. The model had dimensions of 1500×500m (w×h). A vertical stress of σz=7.2MPa was applied to the upper edge of the model. The mechanized support protected the roof for a length of 4m at a distance of 2m from the face of the longwall. During simulation, among others, vertical displacements of roof and vertical stresses were closely examined. There were observed phenomena of bending, cracking, loosening and falling of roof blocks of rock. The results of numerical simulations were compared with the results of analytical solutions. The calculations were based on the solutions of the elastic foundation beam theory and the stress wave theory. Comparable shapes of arch pressure σzmax and the range of its impact were obtained.

26 April 2019 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek

1 November 2017
Verified
Book Chapter
Closed access
PDF file
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek

18 September 2026 in Research Square
Verified
Preprint
Open access
PDF file
KTKrzysztof Marian Tomiczek
Krzysztof Marian Tomiczek
This study evaluates Google Earth Engine (GEE) as the central computational environment for a unified, repeatable workflow for post-event geospatial diagnostics of two contrasting natural hazards: the September 2024 flood in Lower Silesia, Poland, and the December 2022 Batang Kali landslide in Selangor, Malaysia. Both cases followed the same analytical sequence: pre-event and post-event image selection, generation of a continuous change layer, threshold-based binary mask extraction, z-score standardization of change magnitude, point-based validation, and cartographic export. The flood branch used Sentinel-2 Level-2A imagery and ΔNDWI, whereas the landslide branch used Sentinel-1 GRD SAR imagery and Δ σ ⁰. For the Lower Silesia AOI, the workflow delineated 70.142 km² of flood-class pixels and produced complete agreement for the 240-point internal reference sample. Because the reference points were selected within the classified domain and interpreted from satellite imagery, this 100% agreement is treated as case-specific and potentially optimistic rather than as independent proof of error-free classification. For Batang Kali, all 11 reference landslide points were detected, giving 100% producer's accuracy, but 109 stable reference points were also classified as landslide-like; overall accuracy and user's accuracy were 9.17%. The landslide output is therefore interpreted as a high-sensitivity disturbance-screening product rather than a precise landslide inventory. The results show that GEE provides a transferable computational architecture, while diagnostic performance remains hazard- and indicator-specific.