Zhimin Wang

Dr. Zhimin Wang


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZWZhimin Wang
Zhimin Wang
ZLZixiao Liu
Zixiao Liu
JLJunyan Liu
Junyan Liu
The COVID‐19 pandemic has brought about significant influences to the world, including tunnel construction. Based on the analysis of 12 tunnel construction projects, this paper identifies the specific risk factors related to the COVID‐19 pandemic, e.g., men, materials, machines, methods, social environment, and political epidemic prevention pressure. Among these risk factors, worker availability, site accessibility, shortage of construction materials, and inadequate epidemic prevention materials caused by the lockdown policy are the most fundamental challenges encountered by the projects. Social panic and epidemic prevention policy requirements are key issues needed to be addressed before the resumption of construction work. The special circumstances caused by the COVID‐19 pandemic called for flexible project management and coordination skills to raise suitable and effective response strategies, while local governments make substantial contributions in solving the difficulties. Although these measures have resulted in higher project costs, their effectiveness in catching up with project schedules is worthy of recognition. The findings of this study enrich the risk categories of tunnel construction and the risk response strategies from the perspective of a global pandemic. It implies that future construction schemes including design, budget, supply chain, and project management should consider the possible influence of an epidemic.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
ZWZhimin Wang
Zhimin Wang
JLJin Liu
Jin Liu
With the fast expansion of major cities in China, increasing scale, complex, and tall buildings have been built to meet the increasing commercial and living demand. However, the efficiency of project management and investment is not always satisfactory. To solve this problem, a seven‐dimensional building information model (7D BIM) is developed. To do this, a 3D BIM is firstly developed, which consists of architecture model, equipment model, steel framework model, other solid models, etc. Then, a 1D schedule management model and a 3D project management model (bidding management, enterprise quota management, and process management) have been integrated into the 3D BIM, thus forming a 7D BIM for a complex project. By providing a clear 3D vision in modeling the construction process, the proposed 7D model can be applied to help engineers/project managers carry out clash detection, structure design, modification, equipment installation, 3D project management, and maintenance after construction. The performance of this model has been demonstrated through a case study of a complex project launched in China. The study shows that the implementation of the 7D BIM has achieved significant cost and time saving as well as project quality and work efficiency improvement.

30 October 2023 in The Quarterly Review of Economics and Finance
Verified
Journal Article
Closed access
Quanxi LiangQuanxi Liang
Quanxi Liang
ZWZhimin Wang
Zhimin Wang
XGXin Guan
Xin Guan
WQWei Qin
Wei Qin

2 February 2022 in Applied Economics Letters
Verified
Journal Article
Closed access
YSYaya Shi
Yaya Shi
YLYonggen Luo
Yonggen Luo
ZWZhimin Wang
Zhimin Wang
We explore unethical behaviours involving original sin during the privatized process and their influence on corporate donations in China. We find that enterprises are more actively and deeply engaging in donations when they are guilty of being involved in certain types of misconduct during the privatization process, including downward earnings management, insider trading, and tunnelling, and this phenomenon has particularly significance in regions with lower levels of non-state economic development.

14 October 2021 in Asian Population Studies
Verified
Journal Article
Closed access
ZWZhimin Wang
Zhimin Wang
CCChuantao Cui
Chuantao Cui
China’s rapid industrialization and urbanization have been accompanied by massive internal population migration over the past decades. These immigrants experience various housing disadvantages along their migration journeys. Using longitudinal survey datasets from China Family Panel Studies, this paper identifies the housing pathways adopted by the Chinese urban migrants, including moving into homeownership, moving out of homeownership, and non-homeownership mobility. Job changes and institutional forces are the most significant mobility triggers, while family life cycle events are vital predictors of moving into homeownership. The dilemma of job-induced migration versus family-centred homeownership attainment has resulted in various social issues. This paper suggests that policies should be systematically designed for industry convergence from an overall urban planning perspective to promote township urbanization, including industrial relocation, rural economic revitalization, and institutional reforms of rural-urban disparities.

12 October 2022 in arXiv
Verified
Preprint
Open access
PDF file
XLXiangyu Luo
Xiangyu Luo
HCHao Chen
Hao Chen
YLYinghao Li
Yinghao Li
QGQiang Gao
Qiang Gao
CYChaohui Yin
Chaohui Yin
XZX. J. Zhou
X. J. Zhou
In high temperature cuprate superconductors, it was found that the superconducting transition temperature Tc depends on the number of CuO2 planes (n) in the structural unit and the maximum Tc is realized in the trilayer system (n=3). It was also found that the trilayer superconductors exhibit an unusual phase diagram that Tc keeps nearly constant in the overdoped region which is in strong contrast to the Tc decrease usually found in other cuprate superconductors. The electronic origin of the Tc maximization in the trilayer superconductors and its high Tc persistence in the overdoped region remains unclear. By taking high resolution laser-based angle resolved photoemission (ARPES) measurements, here we report our revelation of the microscopic origin of the unusual superconducting properties in the trilayer superconductors. For the first time we have observed the trilayer splitting in Bi2Sr2Ca2Cu3O10+d (Bi2223) superconductor. The observed Fermi surface, band structures, superconducting gap and the selective Bogoliubov band hybridizations can be well described by a three-layer interaction model. Quantitative information of the microscopic processes involving intra- and interlayer hoppings and pairings are extracted. The electronic origin of the maximum Tc in Bi2223 and the persistence of the high Tc in the overdoped region is revealed. These results provide key insights in understanding high Tc superconductivity and pave a way to further enhance Tc in the cuprate superconductors.