Rachid Darbali-Zamora

Dr. Rachid Darbali-Zamora


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 June 2020 in Energies
Verified
Journal Article
Open access
PDF file
Juan MontoyaJuan Montoya
Juan Montoya
RBRon Brandl
Ron Brandl
KVKeerthi Vishwanath
Keerthi Vishwanath
Jay JohnsonJay Johnson
Jay Johnson
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
RBRoland Bruendlinger
Roland Bruendlinger
The integration of smart grid technologies in interconnected power system networks presents multiple challenges for the power industry and the scientific community. To address these challenges, researchers are creating new methods for the validation of: control, interoperability, reliability of Internet of Things systems, distributed energy resources, modern power equipment for applications covering power system stability, operation, control, and cybersecurity. Novel methods for laboratory testing of electrical power systems incorporate novel simulation techniques spanning real-time simulation, Power Hardware-in-the-Loop, Controller Hardware-in-the-Loop, Power System-in-the-Loop, and co-simulation technologies. These methods directly support the acceleration of electrical systems and power electronics component research by validating technological solutions in high-fidelity environments. In this paper, members of the Survey of Smart Grid International Research Facility Network task on Advanced Laboratory Testing Methods present a review of methods, test procedures, studies, and experiences employing advanced laboratory techniques for validation of range of research and development prototypes and novel power system solutions.

2 February 2021 in Energies
Verified
Journal Article
Open access
PDF file
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
Jay JohnsonJay Johnson
Jay Johnson
ASAdam Summers
Adam Summers
Birk JonesBirk Jones
Birk Jones
CHClifford W. Hansen
Clifford W. Hansen
CSChad Showalter
Chad Showalter
Real-time state estimation using a digital twin can overcome the lack of in-field measurements inside an electric feeder to optimize grid services provided by distributed energy resources (DERs). Optimal reactive power control of DERs can be used to mitigate distribution system voltage violations caused by increased penetrations of photovoltaic (PV) systems. In this work, a new technology called the Programmable Distribution Resource Open Management Optimization System (ProDROMOS) issued optimized DER reactive power setpoints based-on results from a particle swarm optimization (PSO) algorithm wrapped around OpenDSS time-series feeder simulations. This paper demonstrates the use of the ProDROMOS in a RT simulated environment using a power hardware-in-the-loop PV inverter and in a field demonstration, using a 678 kW PV system in Grafton (MA, USA). The primary contribution of the work is demonstrating a RT digital twin effectively provides state estimation pseudo-measurements that can be used to optimize DER operations for distribution voltage regulation.

27 March 2022 in Energies
Verified
Journal Article
Open access
PDF file
JAJavier Hernandez Alvidrez
Javier Hernandez Alvidrez
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
JFJack Flicker
Jack Flicker
MSMariko Shirazi
Mariko Shirazi
JVJeremy VanderMeer
Jeremy VanderMeer
WTWilliam Thomson
William Thomson
In remote arctic communities, where access to a bulk electrical grid interconnection is not available, the implementation of islanded microgrids has been the most viable way to produce and distribute electricity services to their inhabitants. Historically, these islanded grids have relied primarily on diesel generators or hydropower resources to supply the baseload. However, this practice can result in increased expense due to the high costs associated with fuel transportation and the significant amounts of on-site storage necessary when fuel transportation is unavailable during winter months. In order to mitigate this problem, arctic microgrids have started to transition to a hybrid-source operational mode by incorporating renewable energy sources that are inherently variable in nature, such as wind or solar. Due to their highly stochastic behavior, these hybrid-source islanded microgrids can pose potential issues related to power quality due to introduction of rapid net load fluctuations and inability of diesel generators to respond rapidly. In addition, non-firm stochastic sources can require significant idling diesel generator resources to serve as spinning reserves, which is inefficient and wasteful. This work studies the problems that may arise in the transient dynamics of a real-world hybrid diesel microgrid when subjected to a loss of wind generation. Moreover, this work proposes a transition from a diesel spinning reserve to a battery energy-storage system (BESS) operating reserve scheme. The study of the proposed transition is important in establishing the fundamental implication of transient dynamics and the potential benefits of integrating a BESS as a spinning reserve in terms of stability, frequency nadir, and transient voltage deviation. The methods to investigate and validate the transient dynamics relied on both electromagnetic simulation models of GFMIs and a commercially available GFMI in an experimental power hardware-in-the-loop setup. The simulation results showed that the proposed operating reserve scheme improves the power quality of the system in terms of voltage deviation and frequency nadir when the microgrid is subjected to a loss of wind generation scenario. Depending on the simulation cases, adding a GFMI reduced the frequency nadir between 65.3% and 86.7%. Moreover, the reductions in the voltage deviations improved between 3.6% and 23.0%. From these results it can be concluded that the integration of a GFMI can reduce the frequency nadir in a hybrid diesel microgrid, and in turn, reduce diesel consumption, which improves system reliability while reducing fuel expenses. Furthermore, the novelty of this work relies on the fact that the offline simulation results were validated using a power hardware-in-the-loop platform that incorporated a 100 kVA commercially available GFMI as the device under test.

10 July 2020 in Energies
Verified
Journal Article
Open access
PDF file
ASAdam Summers
Adam Summers
Jay JohnsonJay Johnson
Jay Johnson
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
CHClifford W. Hansen
Clifford W. Hansen
JAJithendar Anandan
Jithendar Anandan
CSChad Showalter
Chad Showalter
Grid operators are now considering using distributed energy resources (DERs) to provide distribution voltage regulation rather than installing costly voltage regulation hardware. DER devices include multiple adjustable reactive power control functions, so grid operators have the difficult decision of selecting the best operating mode and settings for the DER. In this work, we develop a novel state estimation-based particle swarm optimization (PSO) for distribution voltage regulation using DER-reactive power setpoints and establish a methodology to validate and compare it against alternative DER control technologies (volt–VAR (VV), extremum seeking control (ESC)) in increasingly higher fidelity environments. Distribution system real-time simulations with virtualized and power hardware-in-the-loop (PHIL)-interfaced DER equipment were run to evaluate the implementations and select the best voltage regulation technique. Each method improved the distribution system voltage profile; VV did not reach the global optimum but the PSO and ESC methods optimized the reactive power contributions of multiple DER devices to approach the optimal solution.

19 August 2020 in Energies
Verified
Journal Article
Open access
PDF file
Birk JonesBirk Jones
Birk Jones
MLMatthew Lave
Matthew Lave
MRMatthew Reno
Matthew Reno
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
ASAdam Summers
Adam Summers
SHShamina Hossain-McKenzie
Shamina Hossain-McKenzie
The benefits and risks associated with Volt-Var Curve (VVC) control for management of voltages in electric feeders with distributed, roof-top photovoltaic (PV) can be defined using a stochastic hosting capacity analysis methodology. Although past work showed that a PV inverter’s reactive power can improve grid voltages for large PV installations, this study adds to the past research by evaluating the control method’s impact (both good and bad) when deployed throughout the feeder within small, distributed PV systems. The stochastic hosting capacity simulation effort iterated through hundreds of load and PV generation scenarios and various control types. The simulations also tested the impact of VVCs with tampered settings to understand the potential risks associated with a cyber-attack on all of the PV inverters scattered throughout a feeder. The simulation effort found that the VVC can have an insignificant role in managing the voltage when deployed in distributed roof-top PV inverters. This type of integration strategy will result in little to no harm when subjected to a successful cyber-attack that alters the VVC settings.

14 March 2023 in IEEE Access
Verified
Journal Article
Open access
Birk JonesBirk Jones
Birk Jones
CBCynthia J. Bresloff
Cynthia J. Bresloff
RDRachid Darbali-Zamora
Rachid Darbali-Zamora
Natural hazards, like wildfires, present various challenges to the electric grid that can leave many communities without power. To identify vulnerabilities in the grid and the corresponding at-risk communities, this work considers the implementation of two topological assessment approaches, namely betweenness centrality and minimum cut, and combines the results from each with spatial fire probability data. The results from a betweenness centrality analysis identified at-risk communities whose critical lines, necessary for routing power to the community from the numerous generators, were found to be at-risk if they were located within high probability burn zones. Communities at-risk of separation from the grid with one cut (or electrical shorting) of a transmission line due it’s proximity to a high burn probability (BP) area were also identified using the minimum cut Graph Theory algorithm. When the methodologies were applied to a demonstration transmission grid, the results found that about about one third of the 585 substations had centrally located lines in high BP areas. About 46% of the substations require just one cut to be removed from the grid, and the average length of these one-cut segments were 37 km with the longest at 188 km.