18 July 2022 in IEEE Open Access Journal of Power and Energy
EBErick E. Aponte Bezares
Limited access to transmission lines after a major contingency event can inhibit restoration efforts. After Hurricane Maria, for example, flooding and landslides damaged roads and thus limited travel. Transmission lines are also often situated far from maintained roadways, further limiting the ability to access and repair them. Therefore, this paper proposes a methodology for assessing Puerto Rico’s infrastructure (i.e., roads and transmission lines) to identify potentially hard to reach areas due to natural risks or distance to roads. The approach uses geographic information system (GIS) data to define vulnerable areas, that may experience excessive restoration times. The methodology also uses graph theory analysis to find transmission lines with high centrality (or importance). Comparison of these important transmission lines with the vulnerability results found that many reside near roads that are at risk for landslides or floods.
14 March 2023 in IEEE Access
Natural hazards, like wildfires, present various challenges to the electric grid that can leave many communities without power. To identify vulnerabilities in the grid and the corresponding at-risk communities, this work considers the implementation of two topological assessment approaches, namely betweenness centrality and minimum cut, and combines the results from each with spatial fire probability data. The results from a betweenness centrality analysis identified at-risk communities whose critical lines, necessary for routing power to the community from the numerous generators, were found to be at-risk if they were located within high probability burn zones. Communities at-risk of separation from the grid with one cut (or electrical shorting) of a transmission line due it’s proximity to a high burn probability (BP) area were also identified using the minimum cut Graph Theory algorithm. When the methodologies were applied to a demonstration transmission grid, the results found that about about one third of the 585 substations had centrally located lines in high BP areas. About 46% of the substations require just one cut to be removed from the grid, and the average length of these one-cut segments were 37 km with the longest at 188 km.