Samuel Oliver Effiom

Dr. Samuel Oliver Effiom


Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2016 in Energy Reports
Verified
Journal Article
Open access
SESamuel Oliver Effiom
Samuel Oliver Effiom
BNB.N. Nwankwojike
B.N. Nwankwojike
FAFidelis Abam
Fidelis Abam
The paper presents an economic cost evaluation on the feasibility of offshore wind turbine (OWT) farms development in Nigeria, using a 500 MW OWT farm as an incident study. A developed model was used to evaluate the economic cost of the OWTs at different phases of the project. Additionally, the effect of the cost drivers at the changed phases of the OWTs was studied correspondingly. Results obtained showed that over 50% of the OWT project cost emanated from CAPEX while a value less than 50% came from OPEX. However, further analysis indicates at maximum power of 4 MW a 4.95% diminution in LCOE. For comparable power rating (PR) between 5⩽PR⩽6MW, a 2.7% reduction in LCOE exists. Cost stability was apparent at a growth of WTs between 300⩽WT⩽500 MW. The study also observed a decrease in LCOE for all development stages of the OWT while a decrease in the CMS detectability was considered marginal. Subsequently, it can be inferred that Nigeria has the potential for OWT farm expansion. However, the demonstrated model was appropriate for handling preliminary variations in OWT studies

1 March 2015 in Case Studies in Thermal Engineering
Verified
Journal Article
Open access
SESamuel Oliver Effiom
Samuel Oliver Effiom
FAFidelis Abam
Fidelis Abam
OOOlayinka Ohunakin
Olayinka Ohunakin
The effect of inlet air filtration on the performance of two industrial gas turbines (GT) is presented. Two GTs were modeled similar to GE LM2500+ and Alstom GT13 E2-2012, using TURBOMATCH and chosen to operate at environmental conditions of Usan offshore oilfield and Maiduguri dessert in Nigeria. The inlet pressure recovered (Precov) from the selected filters used in Usan offshore, and Maiduguri ranged between 98.36≤Precov≤99.51% and 98.67≤Precov≤99.56% respectively. At reduced inlet Precov by 98.36% (1.66kPa) and, at a temperature above 15°C (ISA), a reduction of 16.9%, and 7.3% of power output and efficiency was obtained using GT13 E2-2012, while a decrease of 14.8% and 4.7% exist for power output and efficiency with GE LM2500+. In addition, a reduction in mass flow rate of air and fuel under the same condition was between 4.3≤mair≤10.6% and 10.4≤mfuel≤11.5% for GT13 E2-2012 and GE LM2500+, correspondingly. However, the GE LM2500+ was more predisposed to intake pressure drops since it functioned at a higher overall pressure ratio. The results obtained were found worthwhile and could be the basis for filter selection and efficient compressor housing design in the locations concerned

26 November 2018 in Energy Sources, Part A: Recovery, Utilization, and Environmental Effects
Verified
Journal Article
Closed access
FAFidelis Abam
Fidelis Abam
TBTobinson A. Briggs
Tobinson A. Briggs
EEEkwe B. Ekwe
Ekwe B. Ekwe
CKC. G. Kanu
C. G. Kanu
SESamuel Oliver Effiom
Samuel Oliver Effiom
MOMichael Ofem
Michael Ofem
A thermodynamic modification of an ORC integrated with turbine bleeding and regeneration (ORCTBR) is presented. The objective is to modify the ORCTBR for both cooling and power generation (ORCNOV). First, a thermodynamic break down of the components based on exergy was performed followed by a sensitivity analysis. The results indicate that at based conditions the maximum efficiency obtained with ORCNOV was about 52% using R245fa at a heat input of 252 kW. The improvement in efficiency was estimated at 7.2% when compared with ORCTBR. The highest cooling rate was achieved using R1234yf, R245fa, and R1234ze by 11.14, 10.60, and 10.11 kW, respectively. Additionally, the ORCNOV showed improved performance in turbine output power of approximately 2%. However, the sensitivity studies show that the exergy destruction gap was not greater than 45% between the ORCTBR and ORCNOV, and high cooling rates are feasible at increased condenser (1) pressure.

29 March 2022 in Scientific African
Verified
Journal Article
Open access
FAFidelis Abam
Fidelis Abam
OIO.I. Inah
O.I. Inah
SESamuel Oliver Effiom
Samuel Oliver Effiom
DND.I. Ntunde
D.I. Ntunde
HUH.U. Ugwu
H.U. Ugwu
Olusegun David SAMUELOlusegun David SAMUEL
Olusegun David SAMUEL

27 June 2022 in Scientific African
Verified
Journal Article
Open access
JOJ.O. Okon
J.O. Okon
SESamuel Oliver Effiom
Samuel Oliver Effiom

13 April 2023 in Applied Engineering and Technology
Verified
Journal Article
Open access
PDF file
SESamuel Oliver Effiom
Samuel Oliver Effiom
This study focused on evaluating the economic cost viability of developing a floating solar photovoltaic systems (FSPVs) project in Nigeria, using Ikang river, Bakassi as an incident study. The FSPVs was designed using the HOMER software to satisfy full load requirements of 2426.45 kWh/day, while appraising the viability of the FSPVs in incident study. Meteorological data of the incident study location which include geographical coordinates, ambient temperature, and global horizontal irradiance were used to select a suitable FSPVs design for the cost appraisal. Lifecycle cost model was further developed to evaluate the proposed FSPVs at different project development phases. These include: predevelopment and consenting (PC), procurement and acquisition (PA), installation and commissioning (IC), operation and maintenance (OM), and decommissioning and disposal (DD). The results obtained showed that the net present cost, Levelized cost of energy, and operating cost of the project were 10,350,933.25USD, 0.90USD/kWh, and 179,164.73USD, respectively. Also, the capital expenditure (CAPEX) amassed by 81.53% of the entire project cost, while operating expenditure (OPEX) was 18.47%. Furthermore, installation, support systems, predevelopment and project management, contingencies, indirect cost, and electrical equipment were the key drivers of the project. For the lifecycle stages; PC, PA, IC, OM and DD were obtained to be 12%, 57.9%, 11.6%, 9.96%, and 8% respectively of the project cost. Thus, the incident study location has the potential for FSPVs development and has proven to be economically viable. Nevertheless, established model was suitable in appraising preliminary variations in FSPVs.