The industry is currently responsible for around 21% of the total CO2 emissions, mainly due to heat production with fossil fuel burners. There are already different technologies on the market that can potentially reduce CO2 emissions. Nevertheless, the first step for their introduction is to analyze their potential on a global scale by detecting in which countries each of them is more attractive, given their energy prices and resources. The present work involves a techno-economic analysis of different alternatives to replace industrial gas boilers for low-pressure steam production at 120 °C and 150 °C. Solar Heat for Industrial Processes (SHIP) was compared with Electric Boilers (EBs), High-Temperature Heat Pumps (HTHPs), and Absorption Heat Transformers (AHTs). SHIP systems have the potential to reach payback periods in the range of 4 to 5 years in countries with Direct Normal Irradiance (DNI) values above 1400 kWh/m2/year, which is reached in Spain, Italy, Greece, Portugal, and Romania. HTHPs and AHTs lead to the lowest payback periods, Levelized Cost of Heat (LCOH), and highest CO2 emission savings. For both AHTs and HTHPs, payback periods of below 1.5 years can be reached, particularly in countries with electricity-to-gas price ratios below 2.0.
One of the main challenges for a further integration of renewable energy sources in the electricity grid is the development of large-scale energy storage systems to overcome their intermittency. This paper presents the concept named CHEST (Compressed Heat Energy STorage), in which the excess electricity is employed to increase the temperature of a heat source by means of a high-temperature heat pump. This heat is stored in a combination of latent and sensible heat storage systems. Later, the stored heat is used to drive an organic Rankine cycle, and hereby to produce electricity when needed. A novel application of this storage system is presented by exploring its potential integration in the Spanish technical constraints electricity market. A detailed dynamic model of the proposed CHEST system was developed and applied to a case study of a 26-MW wind power plant in Spain. Different capacities of the storage system were assessed for the case under study. The results show that roundtrip efficiencies above 90% can be achieved in all the simulated scenarios and that the CHEST system can provide from 1% to 20% of the total energy contribution of the power plant, depending on its size. The CHEST concept could be economically feasible if its capital expenditure (CAPEX) ranges between 200 and 650 k€/MW.
1 July 2016 in International Journal of Refrigeration