Zongkun Li

Prof. Zongkun Li


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2021 in Science of The Total Environment
Verified
Journal Article
Closed access
YZYadong Zhang
Yadong Zhang
ZLZongkun Li
Zongkun Li
WGWei Ge
Wei Ge
XCXudong Chen
Xudong Chen
HXHongyin Xu
Hongyin Xu
HGHongyan Guan
Hongyan Guan

19 April 2019 in Water
Verified
Journal Article
Open access
PDF file
MWMeimei Wu
Meimei Wu
Wei GeWei Ge
Wei Ge
ZLZongkun Li
Zongkun Li
ZWZening Wu
Zening Wu
HZHexiang Zhang
Hexiang Zhang
YPYipeng Pan
Yipeng Pan
Despite the rapid development of risk analysis in dam engineering, there is a relative absence of research on the environmental impact of dam break. As a systematic theory, set pair analysis has a good effect in dealing with uncertainties, although the result is relatively rough and easy to distort. A connection degree of five grades and a generalized set of potential are introduced to improve traditional set pair analysis. Combined with the index system, the evaluation model of the environmental impact of dam break is established, which is based on generalized set pair analysis. Taking Sheheji Reservoir dam as an example, a comparison of evaluation results of fuzzy mathematics theory and generalized set pair analysis is made, which verifies the scientificity and practicability of the method proposed in this paper. The results show that the evaluation grade of the environmental impact of dam break at Sheheji Reservoir is serious, and appropriate management measures should be taken to reduce the risk.

21 June 2017 in Water Resources Management
Verified
Journal Article
Closed access
PDF file
Wei GeWei Ge
Wei Ge
ZLZongkun Li
Zongkun Li
RLRobert Y. Liang
Robert Y. Liang
WLWei Li
Wei Li
YCYingchun Cai
Yingchun Cai

3 November 2019 in Water
Verified
Journal Article
Open access
PDF file
ZLZongkun Li
Zongkun Li
TWTe Wang
Te Wang
Wei GeWei Ge
Wei Ge
DWDong Wei
Dong Wei
HLHanyu Li
Hanyu Li
Despite the fact that the Bayesian network has great advantages in logical reasoning and calculation compared with the other traditional risk analysis methods, there are still obvious shortcomings in the study of dynamic risk. The risk factors of the earth-rock dam breach are complex, which vary with time during the operation period. Static risk analysis, limited to a specific period of time, cannot meet the needs of comprehensive assessment and early warning. By introducing time factors, a dynamic Bayesian network model was established to study the dynamic characteristics of dam-breach probability. Combined with the calculation of the conditional probability of nodes based on the Leaky Noisy-Or gate extended model, the reasoning results of Bayesian networks were modified by updating the data of different time nodes. Taking an earth-rock dam as an example, the results show that it has less possibility to breach and keep stable along the time axis. Moreover, the factors with vulnerability and instability were found effective, which could provide guidance for dam risk management.

30 June 2019 in Water
Verified
Journal Article
Open access
PDF file
WLWei Li
Wei Li
ZLZongkun Li
Zongkun Li
Wei GeWei Ge
Wei Ge
SWSai Wu
Sai Wu
The internal mechanism affecting life loss caused by a dam-break flood is complicated. On the basis of analyzing the risk formation path, a risk evaluation indicator system was established which included the hazards, exposure and vulnerability factors. Variable Fuzzy Sets theory was introduced into the risk evaluation of life loss risk grades and applied to eight collapsed dams in China. According to the sequence of the risk grades of these dams, the evaluation result was mainly consistent with the actual mortality ranking sequence, showing that the model could be effectively applied to the risk evaluation of life loss in dam-break events. Aimed at the problem of large differences in the downstream population distribution of dams in China, this manuscript suggested that 10,000 people should be the basis for the grouping operation of dams in the risk evaluation. These Variable Fuzzy evaluation models and grouping suggestions could help stakeholders to allocate the funds for dam reinforcement more accurately and provide a scientific basis for the study of dam-break life loss and dam risk management.

1 July 2020 in Science of The Total Environment
Verified
Journal Article
Closed access
Wei GeWei Ge
Wei Ge
HSHeqiang Sun
Heqiang Sun
HZHexiang Zhang
Hexiang Zhang
ZLZongkun Li
Zongkun Li
XGXinyan Guo
Xinyan Guo
Pieter Van GelderPieter Van Gelder
Pieter Van Gelder