Sepani Senaratne

Prof. Dr. Sepani Senaratne

Western Sydney University, Parramatta, Australia
orcid

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 May 2021 in Informatics
Verified
Journal Article
Open access
PDF file
Samudaya NanayakkaraSamudaya Nanayakkara
Samudaya Nanayakkara
Srinath PereraSrinath Perera
Srinath Perera
Sepani SenaratneSepani Senaratne
Sepani Senaratne
GWG. Thilini Weerasuriya
G. Thilini Weerasuriya
Dilum BandaraDilum Bandara
Dilum Bandara
The construction industry has dynamic supply chains with multiple suppliers usually engaged in short-term relationships. Government legislation, novel types of payment agreements, conventional information technology solutions, and supply chain management best practices have endeavoured to solve payment-related financial issues in the construction industry, which are mainly caused by the complexities of the construction supply chain. Nevertheless, payment-related issues persist as one of the key challenges in the industry. Applications of blockchain technology–a trusted, distributed data storing mechanism–along with smart contracts are gaining focus as solutions for complex interorganisational processes. A smart contract is a self-executing script that codifies a set of rules or agreements between multiple parties and runs across the blockchain network. This paper identifies the suitability of blockchain and smart contract technologies in solving payment issues in the construction industry. An expert forum of construction industry stakeholders served as the primary data collection method through a structured questionnaire. The key finding of the paper is that blockchain and smart contract powered solutions can significantly mitigate the payment and related financial issues in the construction industry, including partial payments, nonpayments, cost of finance, long payment cycle, retention, and security of payments.
1

1 January 2016 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Sepani SenaratneSepani Senaratne
Sepani Senaratne
DGDomenic Gerace
Domenic Gerace
IMIftekhar Mirza
Iftekhar Mirza
Vivian TamVivian Tam
Vivian Tam
Won Hee KangWon Hee Kang
Won Hee Kang

6 August 2020 in Buildings
Verified
Journal Article
Open access
PDF file
MRM.N.N. Rodrigo
M.N.N. Rodrigo
Srinath PereraSrinath Perera
Srinath Perera
Sepani SenaratneSepani Senaratne
Sepani Senaratne
Xiaohua JinXiaohua Jin
Xiaohua Jin
Carbon emissions are categorised as Embodied Carbon (EC) occurring in the production phase and Operational Carbon (OC) occurring in the operational phase of buildings. The current focus on producing zero-carbon buildings, emphasises reducing OC and ignores the importance of reducing EC emissions. This study focuses on EC. Methods available in EC estimating currently produce estimates that often do not complement each other. This makes it important to develop a robust and accurate methodology for estimating EC. Blockchain is an emerging technology that has significant potential for transaction processing in supply chains. The construction industry being the second least digitalised industry, the adoption of innovative technologies is predominantly important. This paper explores the potential application of blockchain for accurate estimation of EC in construction supply chains. A detailed literature review and expert interviews revealed that, compared to traditional information systems, blockchain systems could eliminate issues in EC estimating highlighting its potential credible application for EC estimating. Scalability was identified as a feature that was lacking in a blockchain system, however, for EC estimating, its impact was identified as minimal. It will be difficult to generalise the findings of the study due to interview based qualitative methodology adopted in this study along with the fact that blockchain is an emerging and fairly new technology. However, a similar process could be followed by other studies to compare blockchain with traditional information systems, to evaluate the suitability of blockchain technology to develop prototype systems.

1 March 2017 in Journal of Cleaner Production
Verified
Journal Article
Closed access
Vivian TamVivian Tam
Vivian Tam
Sepani SenaratneSepani Senaratne
Sepani Senaratne
KLKhoa N. Le
Khoa N. Le
LSLi-Yin Shen
Li-Yin Shen
JPJosip Perica
Josip Perica
CIChethana Illankoon
Chethana Illankoon

18 June 2015 in Architectural Engineering and Design Management
Verified
Journal Article
Closed access
Sepani SenaratneSepani Senaratne
Sepani Senaratne
MRManori Ruwanpura
Manori Ruwanpura

1 December 2008 in Construction Management and Economics
Verified
Journal Article
Closed access
Sepani SenaratneSepani Senaratne
Sepani Senaratne
MSMartin Sexton
Martin Sexton
In the information age, organization theories have addressed problem‐solving as an information‐processing activity. However, in this era, with the realization of knowledge‐based views of the organization, shared problem‐solving is increasingly recognized as a knowledge creation trigger. During shared problem‐solving, stakeholders bring different types of knowledge into the problem situation and it is captured, created and shared by the team members. In construction projects, shared problem‐solving often takes place through pragmatic problem‐solving on site, in particular, through managing project changes. However, this significant role of knowledge in managing project change is not well appreciated in the extant literature. Accordingly, to explore how knowledge is created during project changes in construction a case study approach was adopted using two change events in two collaborative settings within the UK construction industry. The case study findings revealed that different forms of knowledge are created during the project change process within construction projects. However, this knowledge remains largely tacit and does not disseminate to the wider organization due to imbalanced codification and personalization strategies existing in such settings. A knowledge management perspective is introduced to manage project change so that construction project teams can successfully resolve and learn from change events.