David Howard

Dr. David Howard


Research Focus & Metrics

Academic Career Length

26Years (2001-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2003 in Journal of Environmental Management
Verified
Journal Article
Closed access
DHDavid Howard
David Howard
JWJ.W. Watkins
J.W. Watkins
RCR.T. Clarke
R.T. Clarke
CBC.L. Barnett
C.L. Barnett
GSG.J. Stark
G.J. Stark

1 April 2024 in Proceedings of the Institution of Civil Engineers - Energy
Verified
Journal Article
Closed access
DVDavid Vandercruyssen
David Vandercruyssen
SBSimon Baker
Simon Baker
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
Financial viability and political will ultimately determine if tidal range power schemes are developed. This research aims to demonstrate a robust system to make initial estimates of capital costs for tidal range schemes that can be compared between systems and options. A levelised cost of energy (LCOE) is used to compare a tidal range barrage (Morecambe Bay) and a coastal tidal lagoon (North Wales) in the UK; the schemes are set in context with other common energy sources. The results show the Morecambe Bay barrage generates marginally more electricity than the North Wales coastal lagoon and has a shorter impoundment at lower cost. However, the economic arguments for both schemes are similar; both are viable as the LCOE shows. Despite being shown to be financially viable, the sources of funding may remain a problem. Financial returns and two potential public funding mechanisms are discussed. The approach using two simple models makes a strong case for more detailed analysis and, in the current environmental, economic and social climate serious decisions must be taken.

1 October 2023 in Proceedings of the Institution of Civil Engineers - Energy
Verified
Journal Article
Closed access
DVDavid Vandercruyssen
David Vandercruyssen
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
Tidal range power is gaining recognition as a globally important power source, replacing unsustainable fossil fuels and helping mitigate the climate change emergency. Great Britain is ideally situated to exploit tidal power but currently has no operational schemes. Schemes are large and expensive to construct, assessment of their costs is usually examined under conditions of commercial confidentiality. A national strategy for delivery needs a more open system that allows cost estimates to be compared between schemes; a model that evaluates the capital cost of major components has been developed. In 1983, Massachusetts Institute of Technology published a simple additive model of the costs of tidal range schemes on the east coast of the United States. Their model has been updated and benchmarked against recent schemes with published costs; the Sihwa Lake Tidal Power Station (South Korea, completed in 2011) was used along with the published costs for the Swansea Bay Tidal Lagoon proposal in South Wales to benchmark the model. There are developments in civil and mechanical engineering that may influence both the costs and speed of deployment. These are discussed along with methods for their inclusion into the model.

1 January 2014 in The Scientific World Journal
Verified
Journal Article
Open access
PDF file
BJBrighid Moran Jay
Brighid Moran Jay
DHDavid Howard
David Howard
NHNick Hughes
Nick Hughes
JWJeanette Whitaker
Jeanette Whitaker
GAGabrial Anandarajah
Gabrial Anandarajah
Low carbon energy technologies are not deployed in a social vacuum; there are a variety of complex ways in which people understand and engage with these technologies and the changing energy system overall. However, the role of the public’s socio-environmental sensitivities to low carbon energy technologies and their responses to energy deployments does not receive much serious attention in planning decarbonisation pathways to 2050. Resistance to certain resources and technologies based on particular socio-environmental sensitivities would alter the portfolio of options available which could shape how the energy system achieves decarbonisation (the decarbonisation pathway) as well as affecting the cost and achievability of decarbonisation. Thus, this paper presents a series of three modelled scenarios which illustrate the way that a variety of socio-environmental sensitivities could impact the development of the energy system and the decarbonisation pathway. The scenarios represent risk aversion (DREAD) which avoids deployment of potentially unsafe large-scale technology, local protectionism (NIMBY) that constrains systems to their existing spatial footprint, and environmental awareness (ECO) where protection of natural resources is paramount. Very different solutions for all three sets of constraints are identified; some seem slightly implausible (DREAD) and all show increased cost (especially in ECO).

1 January 2005 in Water, Air, & Soil Pollution: Focus
Verified
Journal Article
Closed access
PDF file
SSS. M. Smart
S. M. Smart
MAM. R. Ashmore
M. R. Ashmore
MHM. Hornung
M. Hornung
WSW. A. Scott
W. A. Scott
DFD. A. Fowler
D. A. Fowler
Daniela FamulariDaniela Famulari
Daniela Famulari

26 May 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
James A. DiLellioJames A. DiLellio
James A. DiLellio
George AggidisGeorge Aggidis
George Aggidis
DVDavid Vandercruyssen
David Vandercruyssen
DHDavid Howard
David Howard
Governments need to evaluate technologies generating electricity from different sources; levelised cost of energy (LCOE) is a widely used metric. However, LCOE is weak at comparing disparate technologies, especially where they have different operational lifespans. The discrepancy is demonstrated using UK government data to examine a range of technologies, namely combined cycle generation (natural gas and hydrogen), sustainable renewable technologies along with independent data describing nuclear power and tidal range schemes. Three methods of analysis were used: LCOE, the internal rate of return (IRR), and a novel analysis. A new metric, the sustained cost of energy (SCOE), negates some of the LCOE shortcomings such as the application of discounting. SCOE examines a fixed period of continuous generation, using the lowest common length of operating life of the technologies analysed. It appears to be a useful metric, especially when interpreted with IRR. The analyses produce broadly similar ordering of technologies, but the longer-lasting systems with high initial costings perform better in SCOE. Subsidies, carbon tax, or credit schemes are essential government incentives if net zero emissions targets are to be met without overly burdening consumers with rapidly growing electricity rates.