David Vandercruyssen

Dr. David Vandercruyssen

orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 November 2022 in Heliyon
Verified
Journal Article
Open access
DVDavid Vandercruyssen
David Vandercruyssen
SBSimon Baker
Simon Baker
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
The potential power from coastal tidal range is becoming better appreciated due to the need to mitigate global warming. Great Britain (GB) is ideally situated to exploit tidal power but currently has no operational systems. Historically, estuaries have been proposed as sites for barrages, but more recently coastal lagoons are favoured due to a lower environment impact. To contrast the differences between barrages and lagoons two potential schemes are analysed using the Lancaster 0-D Tidal Range Model. Both schemes were analysed with a range of turbine numbers and generator ratings. The schemes are compared in terms of energy generation, flood protection, navigation, and selected environmental impacts.

1 April 2024 in Proceedings of the Institution of Civil Engineers - Energy
Verified
Journal Article
Closed access
DVDavid Vandercruyssen
David Vandercruyssen
SBSimon Baker
Simon Baker
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
Financial viability and political will ultimately determine if tidal range power schemes are developed. This research aims to demonstrate a robust system to make initial estimates of capital costs for tidal range schemes that can be compared between systems and options. A levelised cost of energy (LCOE) is used to compare a tidal range barrage (Morecambe Bay) and a coastal tidal lagoon (North Wales) in the UK; the schemes are set in context with other common energy sources. The results show the Morecambe Bay barrage generates marginally more electricity than the North Wales coastal lagoon and has a shorter impoundment at lower cost. However, the economic arguments for both schemes are similar; both are viable as the LCOE shows. Despite being shown to be financially viable, the sources of funding may remain a problem. Financial returns and two potential public funding mechanisms are discussed. The approach using two simple models makes a strong case for more detailed analysis and, in the current environmental, economic and social climate serious decisions must be taken.

1 October 2023 in Proceedings of the Institution of Civil Engineers - Energy
Verified
Journal Article
Closed access
DVDavid Vandercruyssen
David Vandercruyssen
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
Tidal range power is gaining recognition as a globally important power source, replacing unsustainable fossil fuels and helping mitigate the climate change emergency. Great Britain is ideally situated to exploit tidal power but currently has no operational schemes. Schemes are large and expensive to construct, assessment of their costs is usually examined under conditions of commercial confidentiality. A national strategy for delivery needs a more open system that allows cost estimates to be compared between schemes; a model that evaluates the capital cost of major components has been developed. In 1983, Massachusetts Institute of Technology published a simple additive model of the costs of tidal range schemes on the east coast of the United States. Their model has been updated and benchmarked against recent schemes with published costs; the Sihwa Lake Tidal Power Station (South Korea, completed in 2011) was used along with the published costs for the Swansea Bay Tidal Lagoon proposal in South Wales to benchmark the model. There are developments in civil and mechanical engineering that may influence both the costs and speed of deployment. These are discussed along with methods for their inclusion into the model.

26 May 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
James A. DiLellioJames A. DiLellio
James A. DiLellio
George AggidisGeorge Aggidis
George Aggidis
DVDavid Vandercruyssen
David Vandercruyssen
DHDavid Howard
David Howard
Governments need to evaluate technologies generating electricity from different sources; levelised cost of energy (LCOE) is a widely used metric. However, LCOE is weak at comparing disparate technologies, especially where they have different operational lifespans. The discrepancy is demonstrated using UK government data to examine a range of technologies, namely combined cycle generation (natural gas and hydrogen), sustainable renewable technologies along with independent data describing nuclear power and tidal range schemes. Three methods of analysis were used: LCOE, the internal rate of return (IRR), and a novel analysis. A new metric, the sustained cost of energy (SCOE), negates some of the LCOE shortcomings such as the application of discounting. SCOE examines a fixed period of continuous generation, using the lowest common length of operating life of the technologies analysed. It appears to be a useful metric, especially when interpreted with IRR. The analyses produce broadly similar ordering of technologies, but the longer-lasting systems with high initial costings perform better in SCOE. Subsidies, carbon tax, or credit schemes are essential government incentives if net zero emissions targets are to be met without overly burdening consumers with rapidly growing electricity rates.

1 November 2024 in Proceedings of the Institution of Civil Engineers - Energy
Verified
Journal Article
Closed access
DVDavid Vandercruyssen
David Vandercruyssen
SBSimon Baker
Simon Baker
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
Tidal range electricity generation schemes are designed to have a minimum operational life of at least 120 years, making it important to plan for changes such as sea-level rise (SLR). Earlier studies have shown that schemes can maintain the existing tidal range within the impoundment and protect areas from flooding. Here it is demonstrated that tidal range technology can maintain the current tidal extent despite SLR and suggests the operational strategies to achieve it. The approach is the only way to safeguard existing intertidal habitats. Mechanical and electrical plant requires a major overall, upgrade or replacement every 40 years; the levelised cost of energy is structured in 40-year periods reducing after the first period. Increasing the capacity or efficiency of the plant during the refits allows the protection of low-lying areas to be maintained and more electricity to be generated. The strategy requires energy to be used in pumping to achieve the current low tidal limits and the incoming tide to be curtailed to maintain the high tide extent, but there is very little effect on annual electricity production. Flexible operation can offer some protection from riverine flooding and existing inundation cycles can be maintained.

27 May 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DVDavid Vandercruyssen
David Vandercruyssen
SBSimon Baker
Simon Baker
DHDavid Howard
David Howard
George AggidisGeorge Aggidis
George Aggidis
The west coast of Great Britain has the potential for barrages to create tidal range reservoirs that both facilitate electricity generation and prevent flooding from sea level rise. Seawater flows into and out of the reservoir, or impoundment, through turbines and sluices. The impounded water follows the natural tidal sequence but with a delay which creates a head between the two bodies of water. Traditional designs for barrages use earth embankments, with impermeable cores and rockfill protection. More recently, breakwaters and jetties have been constructed using precast concrete vertical caissons. A novel design using horizontal precast caissons is described and evaluated. Wave forces are estimated using Goda’s method for a vertical breakwater to assess their impact on stability and ground-bearing pressures. The stability of the barrage is checked for hydrostatic and wave forces. The volumes of materials and relative costs are presented. Precast caissons are found to be viable financially and should be both quicker and easier to construct and install. The horizontal caissons show advantages over the vertical type, and although untried, they should be easier to construct than submerged tube tunnels. Further work is needed to validate the design, including dynamic modelling and detailed construction assessment to confirm the cost rates.