Slobodan Kolaković

Dr. Slobodan Kolaković

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
SKSlobodan Kolaković
Slobodan Kolaković
Vladimir MandićVladimir Mandić
Vladimir Mandić
MSMilan Stojkovic
Milan Stojkovic
GJGoran Jeftenić
Goran Jeftenić
DSDanilo Stipić
Danilo Stipić
SKSrđan Kolaković
Srđan Kolaković
This research analyzes the peaks-over-threshold (POT) method for designed flood estimation needed to plan river levees, spillways and water facilities. In this study, a one-parameter exponential probability distribution has been modified by including the coefficient of λ, which represents an average number of floods and enables return period calculation within the specified period of time. The study also compares results using the Log-Pearson Type III distribution of maximum annual flows and a standard exponential distribution of the selected peaks over the threshold level. The aforementioned approach represents the standard mathematical tools for river flood design, while the proposed modification of the exponential distribution highlights the estimation of flood quantiles with longer return periods (e.g., 100, 1000 and 10,000 years). Moreover, the sensitivity analysis of the threshold selection is proposed to assist in the flood design flow estimation alongside the proposed modification of the exponential probability distribution. The study was carried out at the Danube River, and the Novi Sad hydrological station (Republic of Serbia) was used for the long-term recorded period from 1876 to 2015. The results suggest that the POT method derives more reliable estimates of design floods than the traditional statistical tools for flood estimation. The results suggest the theoretical values of the water level of the 10,000 years return period is equal to 867 cm, while the Log-Pearson Type III distribution of annual maximum flows underestimated this value for 14 cm.

5 October 2021 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Closed access
PDF file
GJGoran Jeftenić
Goran Jeftenić
ARAndrija Rašeta
Andrija Rašeta
SKSrđan Kolaković
Srđan Kolaković
MPMilena Panić
Milena Panić
SKSlobodan Kolaković
Slobodan Kolaković
Vladimir MandićVladimir Mandić
Vladimir Mandić
The hydropower potential in the Republic of Serbia, as the most important renewable energy source, has been estimated at around 17000 GW·h per year, where approximately 2000 GW·h could be obtained from small hydropower plants (SHP)....

1 December 2020 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Closed access
PDF file
MŠMiloš Šešlija
Miloš Šešlija
NRNebojša Radović
Nebojša Radović
GJGoran Jeftenić
Goran Jeftenić
Anka Starčev-ĆurčinAnka Starčev-Ćurčin
Anka Starčev-Ćurčin
IPIgor Pesko
Igor Pesko
SKSlobodan Kolaković
Slobodan Kolaković
The paper deals with the influence of temperature changes on concrete pavement. Due to differences in temperature on the upper and the lower surface of a concrete slab, the bending stress is created, resulting in concrete slab deformation. During the process of heating, the difference in temperature between the upper and the lower surface of pavement is created as a result of heat conduction. The upper surface has a tendency to expand (tense), whereas the lower one does not alter its dimensions, which results in generating the bending stress. Concrete pavement is most commonly placed in zones with extremely heavy traffic load as well as at bus stops. The analysis was carried out at bus stops in the city of Novi Sad for three different types of slab thickness. The thickness of slabs was 20, 22 and 24 cm. The testing was conducted in the longitudinal and transverse direction of the concrete pavement, both in the middle and on the edge of a slab. During the analysis of results, a conclusion was drawn that the concrete slabs were of different dimensions and thickness, and that they were placed on different subgrade reactions. The maximum values of stress were recorded in the middle of a concrete slab, in slabs whose thickness amounted to 24 cm, while the minimum stresses were identified in slabs which were 20 cm thick. The paper presents the stresses of concrete slabs, caused by changes in temperature, which depend on the subgrade reaction and dimensions of concrete slabs.

5 June 2021 in Tehnicki vjesnik - Technical Gazette
Verified
Journal Article
Closed access
PDF file
SKSlobodan Kolaković
Slobodan Kolaković
SKSrđan Kolaković
Srđan Kolaković
JFJulius Fabian
Julius Fabian
GJGoran Jeftenić
Goran Jeftenić
Slavisa TrajkovicSlavisa Trajkovic
Slavisa Trajkovic
The study presents problem of floods management for lowland rivers and provides solution for such complex task. The paper aims to elaborate a methodology for flood management model on large lowland rivers using precision digital terrain...

11 February 2021 in Water
Verified
Journal Article
Open access
PDF file
Vladimir MandićVladimir Mandić
Vladimir Mandić
MŠMiloš Šešlija
Miloš Šešlija
SKSlobodan Kolaković
Slobodan Kolaković
SKSrđan Kolaković
Srđan Kolaković
GJGoran Jeftenić
Goran Jeftenić
Slavisa TrajkovicSlavisa Trajkovic
Slavisa Trajkovic
The objective of this research was to determine the probability of road overtopping occurrence for a road culvert caused by surface runoff from the upstream catchment. A hydrological–hydraulic model was used for the development of an algorithm for road culvert maintenance based on the overtopping occurrence probability (CMOOP algorithm) for small mountain catchments. The hydrological model defines the regression dependence between the runoff hydrograph peak values and the probability of occurrences, whereas the hydraulic model calculates the culvert flow capacity by including in the calculation the level of sediment that culvert is filled with. The relationship between occurrences of overtopping and peak runoff value was defined using the runoff hydrograph transformation model in the accumulation on the upstream side of the road. In addition to the calculation of overtopping occurrence probability for the existing culvert condition, the CMOOP algorithm was used to analyze the impact of rehabilitation and reconstruction works from the perspective of legally based safety criterion for road overtopping occurrence probability (SCROOP). The CMOOP algorithm was appled to 67 concrete culverts located in a mountain road section in the Republic of Serbia. The results show that the application of rehabilitation works on selected culverts will increase the percentage of culverts that satisfy SCROOP from 49.25% to 89.55%, which confirms that the accumulated stone sediment is the main reason for the SCROOP unfulfillment.

13 March 2026 in Journal of Hydroinformatics
Verified
Journal Article
Open access
DSDanilo Stipić
Danilo Stipić
GJGoran Jeftenić
Goran Jeftenić
SKSlobodan Kolaković
Slobodan Kolaković
MMMarijana Milić
Marijana Milić
SMSanja Mihok
Sanja Mihok
BLBudinski Ljubomir
Budinski Ljubomir
Comprehensive hydraulic modelling of a large urban water supply system, based on GIS data, with actual spatial distribution of water demand achieved through georeferenced water metre data. Establishing a model for simulating a large urban water distribution system poses challenges from multiple perspectives. This paper presents an approach to modelling a complex network, demonstrated on the case of the regional distribution system of the city of Novi Sad. In the analysed study, an accurate model was developed using a comprehensive dataset encompassing all system components. A realistic spatial redistribution of demand within the network was achieved by including the complete set of water meters. This approach yielded straightforward calibration and high agreement between simulated and observed pressure and discharge values. The selected software package, EPANET-GISpipe, proved suitable for addressing such issues. The research has shown that a detailed analysis based on water meter readings enables reliable simulation of large-scale water distribution systems with complex operational dynamics.