Paweł Nowak

Dr. Paweł Nowak

Warsaw University of Technology, Civil Engineering Faculty
+1
orcid

Research Focus & Metrics

Academic Career Length

26Years (2001-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 January 2015 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
MKMariola Violeta Ksiąźek
Mariola Violeta Ksiąźek
Paweł NowakPaweł Nowak
Paweł Nowak
SKSerkan KIVRAK
Serkan KIVRAK
Jerzy RosłonJerzy Rosłon
Jerzy Rosłon
Leonas UstinoviciusLeonas Ustinovicius
Leonas Ustinovicius
One of the most difficult problems in construction is taking objective decisions. A decision-making process is very complicated and time consuming (due to the complex nature of construction projects). Many experts with extensive knowledge of construction industry take subjective decisions related to verbal methods of decision-making. Difficulties are related mostly to the creation of a set of relevant criteria, providing answers to the decision-maker’s questions. A set of proper criteria and mathematical tools (such as computer calculation algorithms with multi-criteria analysis) could significantly improve objective decision-making. The paper presents ESORD – an informatics tool allowing to establish a hierarchy (ranking) of different types of solutions on the basis of mathematical calculation. The authors present a comparison of different methods used for multi-criteria decision-making.

10 September 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Jerzy RosłonJerzy Rosłon
Jerzy Rosłon
MKMariola Książek
Mariola Książek
Paweł NowakPaweł Nowak
Paweł Nowak
Construction program, spatial, architectural, and structural decisions taken in the early stages of a project have a significant impact on meeting the goals and needs of the client. The use of principles and methods of value management allows for an in-depth analysis of the project assumptions from the investor’s perspective and leads to the best ratio of the project’s utility value/sustainability to the price of its implementation. However, analysis of literature sources allows to state that optimization of the economic value of the project takes place only in the preimplementation phase of the project. This paper presents the original concept of combining issues of construction project’s utility and economic value optimization. The model enables the maximization of the utility value of the subject of the project, taking into account its economic parameters. To support the implementation of the model, a schedule optimization procedure was developed using metaheuristic algorithm. The model was demonstrated on the basis of a case study. The presented proprietary approach to optimize the construction schedule taking into account the economic and sustainability of a construction project can be used in “design and build” projects, with particular emphasis on projects managed in the sustainable Project Management system.

1 January 2016 in Procedia Engineering
Verified
Journal Article
Open access
Paweł NowakPaweł Nowak
Paweł Nowak
MKMariola Książek
Mariola Książek
MDMarcin Draps
Marcin Draps
JZJacek Zawistowski
Jacek Zawistowski
The paper presents possibilities of Building Information Modeling (BIM) techniques and relevant software for decision making optimization in construction. Some relevant description of BIM elements needed for optimization in construction investment process. Authors presents chosen tools for decision making - point of reference method. Paper consist also practical example of suggested methodology use - choice of the best location of the office building

5 October 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
Jerzy RosłonJerzy Rosłon
Jerzy Rosłon
MKMariola Książek
Mariola Książek
Paweł NowakPaweł Nowak
Paweł Nowak
JZJacek Zawistowski
Jacek Zawistowski
Investment and construction plans, architectural and construction decisions, and spatial and technology-related decisions made at the early stages of a project have a significant impact on meeting the investment goals and customer expectations. Decision making is a very time-consuming and complicated process (due to the complexity of construction processes). The whole difficulty comes to specifying the appropriate criteria for assessing the given activities, providing answers to the questions of the decision-making bodies. A set of appropriate criteria and mathematical tools (such as computer algorithms with multi-criteria analysis) can significantly improve and accelerate the decision-making process. This article combines ESORD (an IT tool that allows you to compare different types of solutions based on mathematical calculations) with the Monte Carlo method. The developed approach can help the investor to optimize their cash-flow schedule. The original method enables the client to select a construction project variant characterized by the best economical and sustainable parameters, while taking into account customers’ demands.

29 October 2025 in Sustainability
Verified
Journal Article
Open access
PDF file
MKMustafa Korkmaz
Mustafa Korkmaz
YAYasemin Ezgi Akyildiz
Yasemin Ezgi Akyildiz
Sevilay DemirkesenSevilay Demirkesen
Sevilay Demirkesen
STSelcuk Toprak
Selcuk Toprak
Paweł NowakPaweł Nowak
Paweł Nowak
BCBunyamin Ciftci
Bunyamin Ciftci
Disaster management requires the development of effective technologies for managing both pre-and post-disaster processes. Therefore, utilizing effective tools and techniques to mitigate the disaster risks or lower the adversarial impacts is essential. Over the last decade, digital twin (DT) applications have found a wider implementation area for varying purposes, but most importantly, they are utilized for simulating disaster impacts. This study aims to develop an open-source digital twin (DT) framework for earthquake disaster management in the Cayirova district of Kocaeli, Türkiye, one of the country’s most seismically active regions. The primary objective is to enhance local resilience by integrating multi-source data into a unified digital environment that supports risk assessment, response planning, and recovery coordination. The digital model developed using QGIS (3.40.9 Bratislava), Autodesk InfraWorks 2025 software for DT modeling integrates various data types, including geospatial, environmental, transportation, utility, and demographic data. As a result, the developed model is expected to be used as a digital database for disaster management, storing both geospatial and building data in a unified structure. The developed model also aims to contribute to sustainable practices in cities, where disaster risks are particularly critical. In this respect, the developed model is expected to create sustainable logistics chains and sustainable targets aiming to reduce the number of people affected by disasters, reducing the direct economic losses caused by disasters. In this framework, the developed model is expected to further assess seismic risk and mitigate risks with DTs. These capabilities enable the project to establish an open-source district-level DT system implemented for the first time in Cayirova, provide an alternative disaster model focused on region-specific earthquakes, and integrate 2D/3D assets into an operational, ready-to-respond digital database. In terms of practical importance, the model provides a digital database (digital backup) that can be used in emergencies, helping decision-makers make faster, data-driven decisions. The significance of this study lies in bridging the gap between urban digitalization and disaster resilience by providing a scalable and transparent tool for local governments. Ultimately, the developed DT contributes to sustainable urban management, enhancing preparedness, adaptive capacity, and post-disaster recovery efficiency.

30 September 2006 in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Verified
Journal Article
Open access
PDF file
JTJosé Manuel Cardoso Teixeira
José Manuel Cardoso Teixeira
AMAndrzej Minasowicz
Andrzej Minasowicz
Edmundas Kazimieras ZavadskasEdmundas Kazimieras Zavadskas
Edmundas Kazimieras Zavadskas
Leonas UstinoviciusLeonas Ustinovicius
Leonas Ustinovicius
DMDarius Migilinskas
Darius Migilinskas
MGMieczysław Grabiec
Mieczysław Grabiec
Knowledge on construction project management is a key issue in today's construction industry across Europe. This applies to the whole range of project participants from inception to conclusion of construction undertakings thereby involving professionals focusing in distinct perspectives yet working for a common goal. Several countries in Europe, with special relevance to the UK, have developed substantial knowledge in this topic through academic courses, professional training and experience of practitioners. Other countries have not achieved this stage but the need to prepare professionals to work in the open European market is impelling efforts for convergence in this matter. This article reports a survey on professional training needs in four European countries presently partnering in a Leonardo da Vinci project on management of construction infrastructure projects. The survey was carried by a questionnaire administered to a set of organisations of the construction cluster of the four countries involved. Results were used for defining 6 areas of interest for CPD courses which are presently being developed in the scope of the project.