1 November 2006 in Construction Management and Economics
Verified
Journal Article
Closed access
AFArshi Shakeel Faridi
Arshi Shakeel Faridi
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
Construction delay is considered one of the most recurring problems in the construction industry. Delays have an adverse impact on project success in terms of time, cost, quality and safety. The effects of construction delays are not confined to the construction industry only, but influence the overall economy of a country like UAE, where construction plays a major role in its development and contributes 14% to the GDP. Thus, it is essential to define the most significant causes of delay in order to avoid or minimise their impact on construction projects. A detailed questionnaire was developed and used to get input from professionals associated with the UAE construction industry. The perspective of contractors and consultants has been analysed to rank the causes of delays based on their Relative Importance Index. Contractors and consultants were in agreement on the most significant causes of delays. The research revealed that 50% of the construction projects in UAE encounter delays and are not completed on time. The top 10 most significant causes of construction delays have been identified by this research. Approval of drawings, inadequate early planning and slowness of the owners' decision‐making process are the top causes of delay in the UAE construction industry.

1 May 2008 in International Journal of Project Management
Verified
Journal Article
Closed access
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh

10 March 2020 in Archives of Civil and Mechanical Engineering
Verified
Journal Article
Closed access
PDF file
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
LRLotfi Romdhane
Lotfi Romdhane
SMS. Manjikian
S. Manjikian

1 November 2015 in Journal of Management in Engineering
Verified
Journal Article
Closed access
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
MMMahmoud H. Mansour
Mahmoud H. Mansour

7 December 2018 in International Journal of Construction Management
Verified
Journal Article
Closed access
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
SMSolair Manjikian
Solair Manjikian
AIAhmed Ibrahim
Ahmed Ibrahim
AAAhmed Abouelyousr
Ahmed Abouelyousr
RJRaed Jabbour
Raed Jabbour
There is a big shift towards sustainable construction projects in the United Arab Emirates (UAE). Sustainable construction projects are riskier than traditional projects. The purpose of this paper is to identify and assess the risks in sustainable construction projects in the UAE. This will help project participants to properly manage these risks in their projects. A list of thirty risks was identified based on literature review. These risks were grouped into five categories: management, technical, green team, green materials and regulatory/economic. A survey was then developed and sent to professionals from the UAE. The respondents evaluated each risk in terms of its probability of occurrence and potential impact. Forty-four responses were collected. The thirty risks were ranked based on the risk severity (probability multiplied by impact). The top five risks are shortage of clients’ funding, insufficient or incorrect sustainable design information, design changes, unreasonably tight schedule for sustainable construction and poor scope definition in sustainable construction. Risk identification and assessment are important part of project risk management. This allows for appropriate risk response planning and control.

25 September 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
IAIrtishad Ahmad
Irtishad Ahmad
MAMalak Aljanabi
Malak Aljanabi
RHRawan Herzallah
Rawan Herzallah
SMSamuel Metry
Samuel Metry
OEOmar El-Ashwal
Omar El-Ashwal
Claims and disputes occur frequently in the construction industry between different contracting parties, mainly the owner, the designer and the contractor. Consequently, valuable time and a significant amount of money are lost. The United Arab Emirates (UAE) construction industry, one of the most vibrant sectors globally, is experiencing a high level of construction disputes and claims. This paper aims to identify and assess the major causes of disputes in the UAE and weigh the effectiveness of the methods used for their avoidance and resolution. The sources of disputes, and their avoidance/resolution methods, were identified through a comprehensive literature review. A survey was then developed and sent to 150 construction professionals. Fifty-four responses were received and analyzed. The results show that the top five sources of disputes in the UAE are variations initiated by the owner, obtaining permit/approval from the municipality and other governmental authorities, material change and approval during the construction phase, the slowness of the owner in decision-making, and the short time available during the design phase. As for the avoidance and the resolution method, the most effective method was found to be negotiation.