Irtishad Ahmad

Dr. Irtishad Ahmad

orcid

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 September 2020 in Buildings
Verified
Journal Article
Open access
PDF file
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
IAIrtishad Ahmad
Irtishad Ahmad
MAMalak Aljanabi
Malak Aljanabi
RHRawan Herzallah
Rawan Herzallah
SMSamuel Metry
Samuel Metry
OEOmar El-Ashwal
Omar El-Ashwal
Claims and disputes occur frequently in the construction industry between different contracting parties, mainly the owner, the designer and the contractor. Consequently, valuable time and a significant amount of money are lost. The United Arab Emirates (UAE) construction industry, one of the most vibrant sectors globally, is experiencing a high level of construction disputes and claims. This paper aims to identify and assess the major causes of disputes in the UAE and weigh the effectiveness of the methods used for their avoidance and resolution. The sources of disputes, and their avoidance/resolution methods, were identified through a comprehensive literature review. A survey was then developed and sent to 150 construction professionals. Fifty-four responses were received and analyzed. The results show that the top five sources of disputes in the UAE are variations initiated by the owner, obtaining permit/approval from the municipality and other governmental authorities, material change and approval during the construction phase, the slowness of the owner in decision-making, and the short time available during the design phase. As for the avoidance and the resolution method, the most effective method was found to be negotiation.

1 January 2019 in Journal of Management in Engineering
Verified
Journal Article
Closed access
IAIrtishad Ahmad
Irtishad Ahmad
NANida Azhar
Nida Azhar
ACArindam Chowdhury
Arindam Chowdhury
Although the benefits of integrated project delivery (IPD) and the role of information and communication technology (ICT) in realizing those benefits have been recognized generally, the adoption of IPD—both philosophically and contractually—in the US construction industry has been slow and lacks necessary enthusiasm, particularly in the public sector. Lack of experience and understanding is perhaps a contributing factor. It is important to fill this gap in knowledge and understanding pertaining to IPD. One way to improve understanding is to provide public owners means to assess the readiness of their organizations for adoption of IPD so that hindrances can be identified and eliminated or mitigated. Recent advances in the field of ICT are making effective information modeling (collecting, storing, processing, and utilizing data) feasible. ICT can significantly facilitate IPD projects. In this study, essential IPD principles were studied in the context of public building projects, and an IPD assessment model (scoring mechanism) to determine the extent of improvement in IPD characteristics as a result of augmenting ICT was presented. Project functions were identified and examined to study interdependence between IPD principles and ICT levels. Once the IPD scores and ICT levels were assessed, an analysis could be conducted to identify ICTs where further enhancements would result in higher IPD scores. An ICT push/IPD pull concept was introduced to identify (1) IPD principles that can be fostered using ICT tools and techniques (ICT push), and (2) IPD principles that provide opportunities for increased use of ICT (IPD pull). The model will assist public project owners in making informed ICT investment decisions to improve performance in IPD characteristics. A real-life case project is described to demonstrate the use and application of the model using push principles of IPD.

14 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
OEOmar Elrefaey
Omar Elrefaey
SASalma Ahmed
Salma Ahmed
IAIrtishad Ahmad
Irtishad Ahmad
Sameh M. El-SayeghSameh M. El-Sayegh
Sameh M. El-Sayegh
The construction industry has been incorporating digital technology over the last two decades, albeit gradually, as “technology-push” continues to overcome customary and traditional passivity typical in the sector. The objective of the study presented in this paper is to investigate how digital technology is making a headway in the construction industry as a consequence of COVID-19. For the purpose of this paper, digital technology applications are divided into three groups: data acquisition, processing, and communication. The methodology involved conducting a questionnaire survey among the construction professionals in the UAE. The survey included questions on the extent of use and level of investment on the three types of technology in three periods—pre-COVID, during COVID, and post-COVID. The results clearly show the increasing level of usage of digital technology in the construction industry from pre-COVID to during COVID and post-COVID periods. Among the three categories, communication technology indicated higher extent of use as compared to the other two. In addition, a marked difference was observed between the “small” project organizations and the “large” ones. Unsurprisingly, both usage and investment in digital technology, in smaller organizations, indicated higher extent of increase in during and post-pandemic periods when compared to the larger organizations.

22 December 2020
Verified
Book Chapter
Closed access
PDF file
IAIrtishad Ahmad
Irtishad Ahmad
SESameh El-Sayegh
Sameh El-Sayegh

1 April 2007 in Journal of Management in Engineering
Verified
Journal Article
Open access
IAIrtishad Ahmad
Irtishad Ahmad

1 April 2003 in Journal of Management in Engineering
Verified
Journal Article
Closed access
IAIrtishad Ahmad
Irtishad Ahmad