We address the effect of three groups of factors on supplementary ground surface displacements during tunnel construction. The first group of factors includes the engineering and geological properties of the massif in which the tunneling is conducted; the second group includes the structural features of the designed tunnels and surrounding buildings, and the third group includes the engineering parameters of the tunneling process. The research takes advantage of the geotechnical monitoring data obtained during the construction of underground facilities and the engineering parameters of shield tunneling during construction of single- and double-track Moscow underground lines by using EPB (earth pressure balance)–TBM (tunnel boring machines) in different soils. The dependence of additional displacements, occurring above the designed tunnel, on the TBM pressure, is addressed in detail. The presence of a close interdependence is evidenced by a correlation coefficient equal to 0.77. No dependence of the settlement on the diameter or depth of the designed tunnel, the distance from the tunnel axis to the monitored object, the loading that comes from a building in the affected area, or the boring rate was identified. The consideration of this parameter can be used to predict the soil displacement around the tunnel at construction facilities having similar geological profiles and boring parameters.
Given formulation and solution of the problem of the interaction of the long pile with finite stiffness broadened heel and the surrounding soil analytical and numerical methods and their comparative analysis. Stress distribution between the pile side surface and the heel essentially depends on the physico-mechanical properties of the surrounding soil, as well as stiffness, the length and diameter of the pile. At a certain ratio of the amount of force in the pile shaft is reduced with varying intensity and depth of only 10-15% of the total force on the pile. To increase the share of the load on the heel of the pile is proposed to find the optimal ratio of the parameters of the pile and broadened heel in the given geological conditions in order to increase the proportion of the stress efforts on the heel of the pile. As for the design of the surrounding soil is considered elastic-plastic model with a tensile strength on the Coulomb-Mohr, and the material of the pile - linear deformable model
The article discusses the interaction of concrete structures with the soil, made on the basis of laboratory tests and numerical simulation. The objectives of the study were to obtain the strength characteristics at the contact of two different materials, to compare the obtained value of the strength reduction factor with the standard values, and also to determine the extent to which the interface must be taken into account when conducting numerical geotechnical calculations. The study was carried out using a direct shear test device, where the strength reduction factor was obtained, which characterizes the conditions of interaction between different materials at their contact. According to the results of numerical simulation, one can see how the consideration of the given characteristics of the material of the contact element affects the internal forces arising in the underground structure and its displacements. The test results showed that the particle diameter has a different effect on shear strength at the same level of normal stress. On the basis of the results obtained, conclusions were drawn on what needs to be paid more attention to when conducting laboratory tests, how strongly the consideration of contact elements with the correct set of properties affects the internal forces of the underground structure. Also, the remaining problems and factors not considered in this study determined the prospects for further research on the topic under consideration.
Calculation scheme of solid multi-layered base of the embedded foundation is offered for description of system vibration “foundation is a multi-layered base”. It is shown that in this case consideration of apparent mass of the solid multi-layered base, as well as foundation side surface friction leads to non-periodical (non-harmonic) damped vibration of the foundation. Different contact models including elastic, non-linear and rheological ones with regard to strengthening throughout the time are considered as for calculation for solution of problem of “system” vibration. It is shown that consideration of soil strengthening and side surface friction of the embedded foundation greatly influence the intensity of vibration damping throughout the time