Mohammed Mawlana

Dr. Mohammed Mawlana


Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2018 in Automation in Construction
Verified
Journal Article
Closed access
SSShide Salimi
Shide Salimi
MMMohammed Mawlana
Mohammed Mawlana
AHAmin Hammad
Amin Hammad

1 December 2015 in Automation in Construction
Verified
Journal Article
Closed access
MMMohammed Mawlana
Mohammed Mawlana
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
ADAhmad Doriani
Ahmad Doriani
AHAmin Hammad
Amin Hammad

1 December 2012
Verified
Conference Paper
Closed access
AHAmin Hammad
Amin Hammad
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
CZCheng Zhang
Cheng Zhang
MMMohammed Mawlana
Mohammed Mawlana
ADAhmad Doriani
Ahmad Doriani
With the increasing complexity of construction projects grows the challenge of securing safety and achieving desirable productivity as the chief priorities of the construction industry. Addressing these issues requires robust mechanisms for on-site real-time data capturing, information processing and decision-making. The current research aims to further investigate the concept of the Smart Construction Site where workers, equipment, and materials are continuously tracked, and the collected information is processed in near real time to update the design model and the simulation of upcoming tasks, and to provide navigation guidance and safety warnings in case of potential collisions. The objective of our research is to improve the productivity and safety of heavy construction projects by integrating 3D design models (e.g. highway models) with the managerial and operational processes of heavy construction using advanced agent technology and multi-agent systems, real-time simulation, and automated machine control.

1 July 2019 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
MMMohammed Mawlana
Mohammed Mawlana
AHAmin Hammad
Amin Hammad
Efficient planning of construction operations is deemed necessary to meet project objectives. Researchers have used simulation optimization to select the optimum amount of equipment and number of crews for construction operations. However, the current state of the practice suffers from the long computation time and the presence of inferior solutions in the final Pareto front. The objective of this paper is to develop and evaluate a robust simulation optimization framework. This framework is capable of reducing the computation time, improving the quality of optimal solutions, and increasing the confidence level in the optimality of the optimal solutions. This paper proposes the integration of common random numbers and parallel computing to achieve the stated objective. The parallel computing is performed on a single multicore processor. Based on the case study, the proposed framework was able to reduce the computation time by 90.5%, achieve a speedup of 2, improve the hypervolume indicator by 3.44%, and increase the confidence level by at least 100%. The values of improvement achieved will not necessarily be the same when different hardware, simulation models, simulation software, and optimization algorithms are used. The proposed framework allows project planners to obtain superior optimal solutions faster, which will make the use of stochastic simulation optimization more appealing.

1 August 2015 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
MMMohammed Mawlana
Mohammed Mawlana
AHAmin Hammad
Amin Hammad

19 December 2023 in Infrastructures
Verified
Journal Article
Open access
PDF file
SJShayan Jorjam
Shayan Jorjam
MMMohammed Mawlana
Mohammed Mawlana
AHAmin Hammad
Amin Hammad
The traditional method of installing underground utilities (e.g., water, sewer, gas pipes, electrical cables) by burying them under roads has been used for decades. However, the repeated excavations related to this method cause problems, such as traffic congestion and business disruption, which can significantly increase financial and social costs. Multi-purpose Utility Tunnels (MUTs) are a good alternative for buried utilities. Although the initial cost of MUTs is higher than that of the traditional method, social cost savings make them more feasible, especially in dense urban areas. Different factors, such as the specifications of utilities, the location of the MUTs, and the construction method, should be investigated to determine if MUTs can be an economical and practical alternative. The construction method is one of the most important factors to assess to have a successful MUT project and reduce its impact on the surrounding area. Simulation can be used to investigate the different construction methods of MUTs. In this paper, two Stochastic Discrete Event Simulation models depicting two MUT construction methods (i.e., microtunneling and cut-and-cover) are developed to analyze the duration and cost of the MUT projects. Also, 4D simulation models of these methods are developed for constructability assessment of these projects.