Faridaddin Vahdatikhaki

Dr. Faridaddin Vahdatikhaki

orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 November 2019 in International Journal of Construction Management
Verified
Journal Article
Open access
EMErik Matel
Erik Matel
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
SHSiavash Hosseinyalamdary
Siavash Hosseinyalamdary
TEThijs Evers
Thijs Evers
HVHans Voordijk
Hans Voordijk
In a globally competitive world, with diminishing profit margins and decreasing market shares, the cost of a project is one of the major criteria in decision making at the early stages of a building design process in the construction industry. To remain competitive in the market, it is crucial for companies to have an accurate estimate of their projects. Nevertheless, given that very little is known about the scope and details of the project, the conventional cost estimation methods tend to be slow and inaccurate. With the rise of computing power, there is now a tendency to use Machine Learning (ML)-based methods, such as Artificial Neural Networks (ANNs), for more accurate cost estimation that can remain reliable in face of insufficient details during the tendering phase. While the use of ANN for cost estimation has been abundantly investigated from the perspective of contractors, there are very limited studies on the development and application of ML-based methods for engineering consultancy firms. Given that the nature of products/services offered by consultancy firms is inherently different from that of contractors (i.e. they are more abstract and less material-based) and also given that the type and level of detail of the available data at the tendering stage is dissimilar, it is important to investigate the applicability of ML-based methods for cost estimation in consultancy firms. To this end, this paper presents an artificial neural network approach for the cost estimation of engineering services. In developing the model, first, the influential factors that affect the costs of engineering services are identified. Thereafter, a model is developed using the data of 132 projects. Subsequently, a heuristic method is developed to systematically improve and fine-tune the performance of the model. Eventually, the findings show that artificial neural networks (ANNs) can obtain a fairly accurate cost estimate, even with small datasets. In fact, the model proposed in this paper performed better than those proposed in other similar works. The model developed in this study showed a 14.5% improvement in the accuracy of the model, considering MAPE.

1 August 2015 in Automation in Construction
Verified
Journal Article
Closed access
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
AHAmin Hammad
Amin Hammad
HSHassaan Siddiqui
Hassaan Siddiqui

1 June 2014 in Automation in Construction
Verified
Journal Article
Closed access
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
AHAmin Hammad
Amin Hammad

1 August 2015 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
AHAmin Hammad
Amin Hammad

1 December 2015 in Automation in Construction
Verified
Journal Article
Closed access
MMMohammed Mawlana
Mohammed Mawlana
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
ADAhmad Doriani
Ahmad Doriani
AHAmin Hammad
Amin Hammad

1 October 2015 in Automation in Construction
Verified
Journal Article
Closed access
FVFaridaddin Vahdatikhaki
Faridaddin Vahdatikhaki
AHAmin Hammad
Amin Hammad