Wei-Jen CHEN

Dr. Wei-Jen CHEN

orcid

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2021 in Entropy
Verified
Journal Article
Open access
PDF file
WCWei-Jen CHEN
Wei-Jen CHEN
MJMao-Jhen Jhou
Mao-Jhen Jhou
Tian-Shyug LeeTian-Shyug Lee
Tian-Shyug Lee
Chi-Jie LuChi-Jie Lu
Chi-Jie Lu
The sports market has grown rapidly over the last several decades. Sports outcomes prediction is an attractive sports analytic challenge as it provides useful information for operations in the sports market. In this study, a hybrid basketball game outcomes prediction scheme is developed for predicting the final score of the National Basketball Association (NBA) games by integrating five data mining techniques, including extreme learning machine, multivariate adaptive regression splines, k-nearest neighbors, eXtreme gradient boosting (XGBoost), and stochastic gradient boosting. Designed features are generated by merging different game-lags information from fundamental basketball statistics and used in the proposed scheme. This study collected data from all the games of the NBA 2018–2019 seasons. There are 30 teams in the NBA and each team play 82 games per season. A total of 2460 NBA game data points were collected. Empirical results illustrated that the proposed hybrid basketball game prediction scheme achieves high prediction performance and identifies suitable game-lag information and relevant game features (statistics). Our findings suggested that a two-stage XGBoost model using four pieces of game-lags information achieves the best prediction performance among all competing models. The six designed features, including averaged defensive rebounds, averaged two-point field goal percentage, averaged free throw percentage, averaged offensive rebounds, averaged assists, and averaged three-point field goal attempts, from four game-lags have a greater effect on the prediction of final scores of NBA games than other game-lags. The findings of this study provide relevant insights and guidance for other team or individual sports outcomes prediction research.

1 September 2021 in Processes
Verified
Journal Article
Open access
PDF file
Chi-Jie LuChi-Jie Lu
Chi-Jie Lu
Tian-Shyug LeeTian-Shyug Lee
Tian-Shyug Lee
Chien-Chih WangChien-Chih Wang
Chien-Chih Wang
WCWei-Jen CHEN
Wei-Jen CHEN
Developing an effective sports performance analysis process is an attractive issue in sports team management. This study proposed an improved sports outcome prediction process by integrating adaptive weighted features and machine learning algorithms for basketball game score prediction. The feature engineering method is used to construct designed features based on game-lag information and adaptive weighting of variables in the proposed prediction process. These designed features are then applied to the five machine learning methods, including classification and regression trees (CART), random forest (RF), stochastic gradient boosting (SGB), eXtreme gradient boosting (XGBoost), and extreme learning machine (ELM) for constructing effective prediction models. The empirical results from National Basketball Association (NBA) data revealed that the proposed sports outcome prediction process could generate a promising prediction result compared to the competing models without adaptive weighting features. Our results also showed that the machine learning models with four game-lags information and adaptive weighting of power could generate better prediction performance.

17 March 2024 in Processes
Verified
Journal Article
Open access
PDF file
WCWei-Jen CHEN
Wei-Jen CHEN
Chi-Jie LuChi-Jie Lu
Chi-Jie Lu
PHPei-Ti Hsu
Pei-Ti Hsu
ChihTe YangChihTe Yang
ChihTe Yang
The equipment in a factory will gradually deteriorate during production, leading to the production of defective products. Without appropriate maintenance, the defect rate will increase over time. Consequently, the production cost will rise, the inventory quality will be affected, the profit will decrease, and the risk of carbon emissions will increase, leading to more customer complaints and damaging the corporate image. In addition to focusing on preventive maintenance to ensure the quality of products, companies should also take carbon emissions into consideration. Furthermore, the frequency of maintenance must be carefully considered, as both carbon emissions and maintenance costs will increase if the frequency is too high; conversely, if the maintenance frequency is too low or non-existent, the defect rate may increase cumulatively, or production may be suspended due to equipment failure. Therefore, this research explores preventive maintenance and inventory management issues within an imperfect production system and develops an extended economic production quantity model that incorporates defective products as well as taking carbon tax and preventive maintenance into consideration. The main purpose is to determine the optimal maintenance frequency, production, and replenishment cycle length, so as to maximize the total profit under the carbon tax policy. This study demonstrates a computing process with relatively impractical product data based on the actual business situation of a disposable diaper manufacturer. Furthermore, a sensitivity analysis is implemented to the model parameters in the proposed model. The managemental insights are illustrated based on the results of theoretical analysis to provide a reference to policy makers during decision making, hence, to secure the sustainability and green transitions of corporates. The results of this study not only help to reduce environmental impact but can also improve the competitiveness and sustainable development of enterprises.

6 October 2024 in Mathematics
Verified
Journal Article
Open access
PDF file
JPJiaLiang Pan
JiaLiang Pan
Chi-Jie LuChi-Jie Lu
Chi-Jie Lu
WCWei-Jen CHEN
Wei-Jen CHEN
Kun-Shan WuKun-Shan Wu
Kun-Shan Wu
ChihTe YangChihTe Yang
ChihTe Yang
This study explores a supply chain product-inventory problem with advance sales under the omni-channel strategies (physical and online sales channels) based on the brand owner’s business model and develops corresponding models that have not been proposed in previous studies. In addition, because the brand owner is a member of the supply chain, and has different handling methods for defective products or products returned by customers in various retail channels, defective products or returned products are included in the supply chain models to comply with actual operating conditions and fill the research gap in the handling of defective/returned products. Regarding the mathematical model’s development, we first clarify the definition of model parameters and relevant data collection, and then establish the production-inventory models with omni-channel strategies and advance sales. The primary objective is to determine the optimal production, delivery, and replenishment decisions of the manufacturer, physical agent, and online e-commerce company in order to maximize the joint total profits of the entire supply chain system. Further, this study takes the supply chain system of mobile game steering wheel products as an example, uses data consistent with the actual situation to demonstrate the optimal solutions of the models, and conducts sensitivity analysis for the proposed model. The findings reveal that increased demand shortens the replenishment cycle and raises order quantity and shipment frequency in the physical channel, similar to the online channel during normal sales. However, during the online pre-order period, higher demand reduces order quantity and cycle length but still increases shipment frequency. Rising ordering or fixed shipping costs lead to higher order quantity and cycle length in both channels, but variable shipping costs in the online channel reduce them. Market price increases boost order quantity and frequency in the online channel, while customer return rates significantly impact inventory decisions.