Sławomir Grulkowski

Dr. Sławomir Grulkowski

Gdańsk University of Technology, Gdańsk, Pomorskie, Poland
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 April 2011 in Proceedings of the Institution of Mechanical Engineers, Part F: Journal of Rail and Rapid Transit
Verified
Journal Article
Closed access
WKWladyslaw Koc
Wladyslaw Koc
AWA Wilk
A Wilk
Piotr ChrostowskiPiotr Chrostowski
Piotr Chrostowski
SGSławomir Grulkowski
Sławomir Grulkowski
The article deals with the conception of carrying out investigation work on lateral resistance in the course of geometrical railway track alignment by using a tamping machine. It is a continuation of the experimental work on the application of the tamping machine to the continuous welded rail track diagnosis. In earlier articles, attention was concentrated on the determination of axial forces in rails. An analytical approach to the evaluation of lateral resistances based on a continuous registration of the displacement and the force used by the tamping machine for the displacement of track on a horizontal plane (so-called slewing or shifting) is presented. The obtained results offer a possibility of estimating a phenomenon tested taking into consideration the state of the track ballast (the layer of crushed rock or gravel upon which the railway track is laid) bed stabilization, the distribution of the lateral resistances occurring along the length of railway track sections under tests, and also the effect of the longitudinal forces appear in track sections. The performed experiments have confirmed the thesis about the use of the tamping machine to diagnose the lateral resistance state in railway tracks. Some trends towards further undertakings in this sphere, of development character intended to polish up the measuring system, and the way of archiving and interpreting the measuring results have been formulated.

4 September 2020 in Remote Sensing
Verified
Journal Article
Open access
PDF file
Cezary SpechtCezary Specht
Cezary Specht
AWAndrzej Wilk
Andrzej Wilk
WKWladyslaw Koc
Wladyslaw Koc
KKKrzysztof Karwowski
Krzysztof Karwowski
PDPawel S. Dabrowski
Pawel S. Dabrowski
RLRoksana Licow
Roksana Licow
The problem of the reproduction of the railway geometric layout in the global spatial system is currently solved in the form of measurements that use geodetic railway networks and also, in recent years, efficient methods of mobile positioning (mainly satellite and inert). The team of authors from the Gdańsk University of Technology and the Maritime University in Gdynia as part of the research project InnoSatTrack is looking for effective and efficient methods for the inventory of railway lines. The research is part of a wider investigation BRIK (Research and Development in Railway Infrastructure, in polish: Badania i Rozwój w Infrastrukturze Kolejowej). This paper presents a comparative analysis of the problem of the reproduction of the trajectory of the measuring system using tacheometry, satellite measurements made using a measurement trolley, and mobile satellite measurements. Algorithms enabling the assessment of the compliance of satellite measurements with classic tacheometric measurements were presented. To this end, the authors held measurement sessions using modern geodetic instruments and satellite navigation on a section of the railway line. The results of the measurements indicate the convergence of the level of accuracy achieved by different measuring techniques.

4 September 2020 in Sensors
Verified
Journal Article
Open access
PDF file
AWAndrzej Wilk
Andrzej Wilk
WKWladyslaw Koc
Wladyslaw Koc
Cezary SpechtCezary Specht
Cezary Specht
SJSlawomir Judek
Slawomir Judek
KKKrzysztof Karwowski
Krzysztof Karwowski
Jacek SzmaglińskiJacek Szmagliński
Jacek Szmagliński
The article discusses an important issue in connection with the technique of mobile Global Navigation Satellite System (GNSS) measurements of railway track coordinates, which is digital filtering performed to precisely determine railway track axes. For this purpose, a measuring technique is proposed which bases on the use of a measuring platform with a number of appropriately distributed GNSS receivers, where two of them determine the directional base vector of the platform. The receivers used in the research had high measuring frequency in the Real Time Kinematic (RTK) operating mode and enabled correction of the obtained results in post–processing. A key problem discussed in the article is the method for assessing the quality of the measurement results obtained from GNSS receivers, and their preparation for further processing making use of geometrically constrained parameters of the base vector and specialized digital filtering, among other elements, to precisely determining the track axis. The obtained results confirm the applicability of the used method of GNSS signal processing.

15 July 2020 in Energies
Verified
Journal Article
Open access
PDF file
Mariusz SpechtMariusz Specht
Mariusz Specht
Cezary SpechtCezary Specht
Cezary Specht
AWAndrzej Wilk
Andrzej Wilk
WKWladyslaw Koc
Wladyslaw Koc
LSLeszek Smolarek
Leszek Smolarek
SJSlawomir Judek
Slawomir Judek
Mobile Global Navigation Satellite System (GNSS) measurements carried out on the railway consist of using satellite navigation systems to determine the track geometry of a moving railway vehicle on a given route. Their purposes include diagnostics, stocktaking, and design work in railways. The greatest advantage of this method is the ability to perform measurements in a unified and coherent spatial reference system, which effectively enables the combining of design and construction works, as well as their implementation by engineering teams of diverse specialties. In the article, we attempted to assess the impact of using three types of work mode for a GNSS geodetic network [Global Positioning System (GPS), GPS/Global Navigation Satellite System (GLONASS) and GPS/GLONASS/Galileo] on positioning availability at three accuracy levels: 1 cm, 3 cm and 10 cm. This paper presents a mathematical model that enables the calculation of positioning availability at these levels. This model was also applied to the results of the measurement campaign performed by five GNSS geodetic receivers, made by a leading company in the field. Measurements with simultaneous position recording and accuracy assessment were taken separately on the same route for three types of receiver settings: GPS, GPS/GLONASS and GPS/GLONASS/Galileo in an urban area typical of a medium-sized city. The study has shown that applying a two-system solution (GPS/GLONASS) considerably increases the availability of high-precision coordinates compared to a single-system solution (GPS), whereas the measurements with three systems (GPS/GLONASS/Galileo) negligibly increase the availability compared to a two-system solution (GPS/GLONASS).

31 October 2022 in Remote Sensing
Verified
Journal Article
Open access
PDF file
SJSlawomir Judek
Slawomir Judek
AWAndrzej Wilk
Andrzej Wilk
WKWladyslaw Koc
Wladyslaw Koc
LLLeszek Lewiński
Leszek Lewiński
ASArtur Szumisz
Artur Szumisz
RLRoksana Licow
Roksana Licow
The article discusses an important issue of railway line construction and maintenance, which fundamentally is the verification of geometric parameters of the railway track. For this purpose, mobile measurements have been performed using a measuring platform with two properly arranged GNSS receivers, which made it possible to determine the base vector of the platform. The measuring functionality of the system was extended by IMU. In this article, the effect of measuring conditions on the accuracy of the results collected from GNSS receivers is analyzed. In particular, the advisability of digital filtering of the recorded coordinates to eliminate disturbances is indicated. The article also presents the possible use of GNSS devices and the IMU unit for determining the direction angle and the longitudinal and lateral inclination angles of the railway track. This makes it possible to verify the track geometry in the horizontal plane by determining the positions of straight sections, circular arcs, and transition curves. It is indicated that the results of measurements are repeatable despite the dynamic interaction between the railway track and the measuring platform. The results confirm the usefulness of the applied GNSS and IMU signal processing method for monitoring the geometrical parameters of the railway track in operating conditions.

16 November 2018 in MATEC Web of Conferences
Verified
Journal Article
Open access
Jacek SzmaglińskiJacek Szmagliński
Jacek Szmagliński
SGSławomir Grulkowski
Sławomir Grulkowski
KBKrystian Birr
Krystian Birr
Both in Poland and in most countries of the European Union, the tram infrastructure is extensively expanding. Contemporary low-floor trams are constructed according to different technical assumptions than typical railway vehicles or high floor trams. In Poland such vehicles rides often on lines designed according to standards developed to the classical vehicles. At the same time, the intensity of road traffic and the number of people using cycling are increasing in cities, which causes into a greater number of dangerous situations at the contact points between various modes of transport. The scope of this article is the analysis of safety hazards in tram transportation and indication of methods for their reduction. It will be a specific analysis of the risk occurring in tram transport. The article presents a division and description of factors that pose a safety hazard to tram traffic. Threats were divided due to the reason for its occuring and due to its effects. The reasons were divided into Human Factor – Vehicle – Road – Traffic - Surroundings. Based on the analysis conducted on the tram network in Gdańsk and on the used rolling stock, the main safety hazards of tram traffic were identified.