yingying Zhang

Ms. yingying Zhang

Central south university

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 March 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LZLei Zhao
Lei Zhao
LZLingyu Zhou
Lingyu Zhou
GZGuangchao Zhang
Guangchao Zhang
TWTian-Yu Wei
Tian-Yu Wei
AMAkim djibril gildas MAHUNON
Akim djibril gildas MAHUNON
YZyingying Zhang
yingying Zhang
To study the temperature distribution in the China Railway Track System Type II ballastless slab track on a high-speed railway (HSR) bridge, a 1:4 scaled specimen of a simply-supported concrete box girder bridge with a ballastless track was constructed in laboratory. Through a rapid, extreme high temperature test in winter and a conventional high temperature test in summer, the temperature distribution laws in the track on the HSR bridge were studied, and the vertical and transverse temperature distribution trend was suggested for the track. Firstly, the extreme high temperature test results showed that the vertical temperature and the vertical temperature difference distribution in the track on HSR bridge were all nonlinear with three stages. Secondly, the extreme high temperature test showed that the transverse temperature distribution in the track was of quadratic parabolic nonlinear form, and the transverse temperature gradient in the bottom base was significantly higher than that of the other layers of the track. Thirdly, the three-dimensional temperature distribution in the track on HSR bridge was a nonlinear, three-stage surface. Furthermore, similar regularities were also obtained in the conventional high temperature test, in which the temperature span ranges were different from those of the extreme high temperature test. In addition, the conventional high temperature test also showed that under the natural environment conditions, the internal temperature gradient in the track layers changed periodically (over a period of 24 h).

8 January 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
LZLingyu Zhou
Lingyu Zhou
TWTianyu Wei
Tianyu Wei
GZGuangchao Zhang
Guangchao Zhang
YZyingying Zhang
yingying Zhang
AMAkim djibril gildas MAHUNON
Akim djibril gildas MAHUNON
Wei GuoWei Guo
Wei Guo
To study the initiation and expansion of the interlayer gap of the China Railway Track System Type II (CRTS-II) ballastless slab track structure under the action of repeated thermal loading as well as the influence of the interlayer gap on the displacement, strain and stiffness of the track structure, a 1/4 scale three-span ballastless slab track simply supported bridge structural system specimen was developed and 18 cycles of extremely thermal loading tests were carried out. Static loading tests were carried out before and after the repeated thermal loading test and the effects of the repeated temperature loading on the mechanical properties of the structural system were analyzed. The test results show that under repeated temperature loading, there is a gap between the track slab and cement emulsified asphalt (CA) mortar near the fixed end section of the beam (close to the shear slots). The interlayer gap gradually expands to the mid-span section in a “stepped” shape in three stages: initiation, expansion and stabilization. Under the same temperature load, the camber of the concrete box beam decreases gradually while that of the track structure increases gradually with the increase of the interlayer gap length. During the three stages of interlayer gap development, the track structure stiffness degrades gradually, and the fastest reduction rate during the expansion stage. At the end of the 18th cycle of thermal loading, a degradation of 14.96% and 2.52% is observed in the stiffness of the track structure and that of the ballastless track-bridge structural system, respectively.

27 May 2021 in Materials
Verified
Journal Article
Open access
PDF file
YZyingying Zhang
yingying Zhang
LZLingyu Zhou
Lingyu Zhou
AMAkim djibril gildas MAHUNON
Akim djibril gildas MAHUNON
GZGuangchao Zhang
Guangchao Zhang
XPXiusheng Peng
Xiusheng Peng
YYYahui Yuan
Yahui Yuan
The mechanical performance of China Railway Track System type II (CRTS II) ballastless track suitable for High-Speed Railway (HSR) bridges is investigated in this project by testing a one-quarter-scaled three-span specimen under thermal loading. Stress analysis was performed both experimentally and numerically, via finite-element modeling in the latter case. The results showed that strains in the track slab, in the cement-emulsified asphalt (CA) mortar and in the track bed, increased nonlinearly with the temperature increase. In the longitudinal direction, the zero-displacement section between the track slab and the track bed was close to the 1/8L section of the beam, while the zero-displacement section between the track slab and the box girder bridge was close to the 3/8L section. The maximum values of the relative vertical displacement between the track bed and the bridge structure occurred in the section at three-quarters of the span. Numerical analysis showed that the lower the temperature, the larger the tensile stresses occurring in the different layers of the track structure, whereas the higher the temperature, the higher the relative displacement between the track system and the box girder bridge. Consequently, quantifying the stresses in the various components of the track structure resulting from sudden temperature drops and evaluating the relative displacements between the rails and the track bed resulting from high-temperature are helpful in the design of ballastless track structures for high-speed railway lines.