Qiang Feng

Qiang Feng

orcid

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2018 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
BCBaoping Cai
Baoping Cai
MXMin Xie
Min Xie
YLYonghong Liu
Yonghong Liu
Yiliu LiuYiliu Liu
Yiliu Liu
QFQiang Feng
Qiang Feng

1 May 2018 in Journal of Power Sources
Verified
Journal Article
Closed access
QXQuan Xia
Quan Xia
ZWZili Wang
Zili Wang
Yi RenYi Ren
Yi Ren
BSBo Sun
Bo Sun
DYDezhen Yang
Dezhen Yang
QFQiang Feng
Qiang Feng

23 March 2022 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
QFQiang Feng
Qiang Feng
MLMeng Liu
Meng Liu
HDHongyan Dui
Hongyan Dui
Yi RenYi Ren
Yi Ren
BSBo Sun
Bo Sun
ZWZili Wang
Zili Wang

1 September 2019 in Applied Energy
Verified
Journal Article
Closed access
Yi RenYi Ren
Yi Ren
DFDongming Fan
Dongming Fan
QFQiang Feng
Qiang Feng
ZWZili Wang
Zili Wang
BSBo Sun
Bo Sun
DYDezhen Yang
Dezhen Yang

1 June 2019 in Reliability Engineering & System Safety
Verified
Journal Article
Closed access
QFQiang Feng
Qiang Feng
XZXiujie Zhao
Xiujie Zhao
DFDongming Fan
Dongming Fan
BCBaoping Cai
Baoping Cai
YLYiqi Liu
Yiqi Liu
Yi RenYi Ren
Yi Ren

17 March 2021 in IEEE Transactions on Industrial Informatics
Verified
Journal Article
Closed access
QWQilong Wu
Qilong Wu
QFQiang Feng
Qiang Feng
Yi RenYi Ren
Yi Ren
QXQuan Xia
Quan Xia
ZWZili Wang
Zili Wang
Baoping CaiBaoping Cai
Baoping Cai
Preventive maintenance (PM) activities in battery energy storage systems (BESSs) aim to achieve a better status in long-term operation. In this article, we develop a reinforcement learning-based PM method for the optimal PM management of BESSs equipped with prognostics and health management capabilities. A multilevel PM framework is established to generate a PM action strategy considering costs, capacity, and reliability simultaneously. Finite costs are the constraints, and reliability is the objective according to capacity degradation, respectively. The proposed PM agent with an integrated Monte Carlo tree search and a deep neural network (DNN) utilizes the state-of-health information of large-scale batteries in the BESS and selects optimal maintenance actions. The DNN is used as the state-action value function to extend the ability to address PM problems with large state-action spaces. The case of a BESS with 9 × 12 × 4 batteries in a fleet is simulated via Python. The results show that the PM agent can achieve efficient and steady decision-making proficiency in BESS PM management.