The modular-multilevel-based isolated dc–dc converter (MMDC) is an attractive solution for the interconnection of medium-voltage (MV) and low-voltage (LV) dc grids. With a modular-multilevel converter (MMC) on the MV side and full bridges (FBs) on the LV side, the MMDC can be flexibly scaled to different voltages and power ratings. However, the existing MMDC is limited to the two-port operation where the dc-link voltages and powers of FBs must be always kept identical. This letter proposes an operation scheme that enables fully independent three-port bidirectional operation of MMDC capable for the interconnection of MVDC and two isolated LVDC grids with different nominal voltages. A comprehensive operation strategy is proposed, which contains two operation modes with different modulation schemes for the MMC to optimize the transformer current in the full load range. Compared with the most popular three-port isolated dc–dc converter triple active bridge, the power flow among three ports follows a simple mathematical rule and can be regulated bidirectionally with small computational efforts as well as intrinsically eliminated circulating power. The experimental results validate the feasibility and effectiveness of the proposed operation scheme.
The current increase of electric vehicles in Germany requires an adequately developed charging infrastructure. Large numbers of public and semi-public charging stations are necessary to ensure sufficient coverage. To make the installation worthwhile for the mostly private operators as well as public ones, a sufficient utilization is decisive. An essential factor for the degree of utilization is the placement of a charging station. Therefore, the initial site selection plays a critical role in the planning process. This paper proposes a charging station placement procedure based on real-world data on charging station utilization and places of common interest. In the first step, we correlate utilization rates of existing charging infrastructure with places of common interest such as restaurants, shops, bars and sports facilities. This allows us to estimate the untapped potential of unexploited areas across Germany in a second step. In the last step, we employ the resulting geographical extrapolation to derive two optimized expansion strategies based on the attractiveness of locations for electric vehicle charging.
We investigate the environmental impacts of on-board (based on alternating current, AC) and off-board (based on direct current, DC) charging concepts for electric vehicles using Life Cycle Assessment and considering a maximum charging power of 22 kW (AC) and 50 kW (DC). Our results show that the manufacturing of chargers provokes the highest contribution to environmental impacts of the production phase. Within the chargers, the filters could be identified as main polluters for all power levels. When comparing the results on a system level, the DC system causes less environmental impact than the AC system in all impact categories. In our diffusion scenarios for electric vehicles, annual emission reductions of up to 35 million kg CO2-eq. could be achieved when the DC system is used instead of the AC system. In addition to the environmental assessment, we examine economic effects. Here, we find annual savings of up to 8.5 million euros, when the DC system is used instead of the AC system.
Electric Vehicles (EVs) are gaining acceptance due to the advantages they offer in the reduction of nitrogen oxide and carbon dioxide emissions. The need for emission reduction and the potential of EVs for these reductions is reflected in the current sustainable mobility policies of the EU as well as the German government. Increasing the penetration of EVs in the grid requires an expansion of EV charging infrastructure, which in turn requires either grid reinforcement or solutions for more efficient use of existing infrastructure to avoid or postpone grid reinforcement. Distribution transformers face increased loading due to EV charging and need to be protected from overloading during peak load periods to ensure continuity of service. Therefore, transformers are one of the components that are upgraded or replaced as a part of grid reinforcement. In this paper, we propose the connection of a Solid-State Transformers (SST) between two buses operating at the same-voltage level as an alternative to replacement or upgrading of conventional transformer as well as to prevent their overloading. We analyse how the proposed topology can be useful to reduce the impact of EV integration on the overloading of distribution transformers and node voltage violations in the distribution grid.