Gang Zha

Dr. Gang Zha


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 September 2018 in Water
Verified
Journal Article
Open access
PDF file
CZChao Zhou
Chao Zhou
NSNa Sun
Na Sun
LU CHENLU CHEN
LU CHEN
YDYi Ding
Yi Ding
JZJianzhong Zhou
Jianzhong Zhou
YXYang Xin
Yang Xin
The purpose of a flood control reservoir operation is to prevent flood damage downstream of the reservoir and the safety of the reservoir itself. When a single reservoir cannot provide enough storage capacity for certain flood control points downstream, cascade reservoirs should be operated together to protect these areas from flooding. In this study, for efficient use of the reservoir storage, an optimal flood control operation model of cascade reservoirs for certain flood control points downstream was proposed. In the proposed model, the upstream reservoirs with the optimal operation strategy were considered to reduce the inflow of the reservoir downstream. For a large river basin, the flood routing and time-lag cannot be neglected. So, dynamic programming (DP) combined with the progressive optimality algorithm (POA) method, DP-POA, was proposed. Thus, the innovation of this study is to propose a two-stage optimal reservoir operation model with a DP-POA algorithm to solve the problem of optimal co-operation of cascade reservoirs for multiple flood control points downstream during the flood season. The upper Yangtze River was selected as a case study. Three reservoirs from upstream to downstream, Xiluodu, Xiangjiaba and the Three Gorges reservoirs (TGR) in the upper Yangtze River, were taken into account. Results demonstrate that the two-stage optimization algorithm has a good performance in solving the cascade reservoirs optimization problem, because the inflow of reservoir downstream and the division volumes were largely reduced. After the optimal operation of Xiluodu and Xiangjiaba reservoirs, the average reduction of flood peak for all these 13 typical flood hydrographs (TFHs) is 13.6%. Meanwhile, the cascade reservoirs can also store much more storm water during a flood event, and the maximum volumes stored in those two reservoirs upstream in this study can reach 25.2 billion m3 during a flood event. Comprising the proposed method with the current operation method, results demonstrate that the flood diversion volumes at the flood control points along the river decrease significantly.

28 December 2020 in Water
Verified
Journal Article
Open access
PDF file
GZGang Zha
Gang Zha
JZJianzhong Zhou
Jianzhong Zhou
YXYang Xin
Yang Xin
WFWei Fang
Wei Fang
LDLing Dai
Ling Dai
XDXiaoling Ding
Xiaoling Ding
Flood disasters are the most frequent and most severe natural disasters in most countries around the world. Reservoir flood operation is an important method to reduce flood losses. When there are multiple reservoirs and flood control points in the basin, it is difficult to use reservoirs separately to fully realize their flood control potential. However, the multi-reservoir joint flood control operation is a multi-objective, multi-constrained, multi-dimensional, nonlinear, and strong-transition feature decision-making problem, and these characteristics make modeling and solving very difficult. Therefore, a large-scale reservoirs flood control operation modeling method is innovatively proposed, and Dynamic Programming (DP) combined with the Progressive Optimality Algorithm (POA) and Particle Swarm Optimization (PSO) methods, DP-POA-PSO, are designed to efficiently solve the optimal operation model. The middle and upper Yangtze River was chosen as a case study. Six key reservoirs in the basin were considered, including Xiluodu (XLD), Xiangjiaba (XJB), Pubugou (PBG), Tingzikou (TZK), Goupitan (GPT), and Three Gorges (TG). Studies have shown that DP-POA-PSO can effectively solve the optimal operation model. Compared with the current operation method, the joint flood control optimal operation makes the flood control point reach the flood control standard, moreover, in the event of the flood with a return period of 1000 years, Jingjiang, the most critical flood control point of the Yangtze River, does not require flood diversion, and the volume of flood diversion in Chenglingji is also greatly reduced.