The problem of pulling the reinforcing bar from the concrete block is urgent for the practice, as it represents the most widespread method of experimental evaluation of characteristics of reinforced-concrete bond behavior, which are necessary for an estimation of the strength and durability of reinforced concrete structures. Fracture process of bonds at pulling the rebar from the concrete is a complex multistep process, accompanied by the presence of inhomogeneous and inelastic deformation, a rupture of adhesive bonds, the initiation and propagation of cracks of different shape and orientation, the presence of contact and tribological phenomena. The nonlinear finite-element solutions of the problem of pulling the reinforcing bar from the concrete block have been obtained with using various models of bond behavior and concrete cracking. The comparison of obtained numerical results with experimental data has been presented and discussed. The first part of the article is devoted to the models taking into account the discontinuity of the connection, while the second part is concerned with the models without explicitly taking into account of discontinuities
The aim of the work is to improve the methodology for the dynamic computation of simple beam spans during the impact of high-speed trains. Mathematical simulation utilizing numerical and analytical methods of structural mechanics is used in the research. The article analyses parameters of the effect of high-speed trains on simple beam spanning bridge structures and suggests a technique of determining of the dynamic index to the live load. Reliability of the proposed methodology is confirmed by results of numerical simulation of high-speed train passage over spans with different speeds. The proposed algorithm of dynamic computation is based on a connection between maximum acceleration of the span in the resonance mode of vibrations and the main factors of stress-strain state. The methodology allows determining maximum and also minimum values of the main efforts in the construction that makes possible to perform endurance tests. It is noted that dynamic additions for the components of the stress-strain state (bending moments, transverse force and vertical deflections) are different. This condition determines the necessity for differentiated approach to evaluation of dynamic coefficients performing design verification of I and II groups of limiting state. The practical importance: the methodology of determining the dynamic coefficients allows making dynamic calculation and determining the main efforts in split beam spans without numerical simulation and direct dynamic analysis that significantly reduces the labour costs for design.
A direct 3D finite element (FE) modeling of fracture processes in reinforced concrete bridge structures is considered with account of the macrocracks initiation and propagation, real geometry of reinforcing elements, discontinuity in the bond-slip behavior, using elastic-plastic-damage constitutive equations for concrete. The comparison of obtained FE results with experimental data is presented and discussed for the pulling ribbed bars out of concrete blocks, the spalling of concrete cover at the automobile bridge and cracking of ballastless deck at the railway bridge.