Tiejun Tao

Prof. Dr. Tiejun Tao

Guizhou University, Guiyang, Guizhou, China
orcid

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 March 2022 in Lithosphere
Verified
Journal Article
Open access
PDF file
XTXingchao TIAN
Xingchao TIAN
TTTiejun Tao
Tiejun Tao
QLQianxing Lou
Qianxing Lou
CXCaijin Xie
Caijin Xie
When the Holmquist-Johnson-Cook (HJC) constitutive model is used to simulate limestone under the impact load, problems of a compaction stage not being characterised and low dynamic peak stress prediction accuracy are observed. The numerical simulation and experimental results were inconsistent. In this study, we proposed a modified HJC constitutive model and parameter determination method. Based on the characteristics of the dynamic stress-strain curve of limestone and relationship between axial and volumetric strains, the linear elastic phase of the state equation of the original HJC constitutive model was modified, and a new state equation was proposed. The yield surface of the original HJC constitutive model was modified on the basis of the sensitivity analysis method and limit surface theory, and a method for determining the parameters of the modified HJC constitutive model of limestone was proposed. The modified model and parameter determination method were experimentally verified using the split Hopkinson pressure bar (SHPB) and a high-speed camera. The results showed that the state equation curve of limestone under the impact load was divided into compaction, linear elastic, and fully compacted stages. After the introduction of the pressure parameters M⁠, P⁠, and Q⁠, the nonlinear change in the stress-strain curve during the compaction stage was highly consistent with the SHPB results. The strength parameters fc⁠, A⁠, B⁠, and N exhibited the maximum impact on the dynamic strength of limestone. After the strength parameters A⁠, B⁠, and N were modified for the yield surface, the prediction accuracy of limestone dynamic peak stress was over 97%, the prediction error rate decreased by more than 10%, and the reliability of numerical simulation results improved. These results can provide a simple and feasible numerical simulation method for the dynamic analysis of rock materials.

25 October 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
XTXingchao TIAN
Xingchao TIAN
TTTiejun Tao
Tiejun Tao
CXCaijin Xie
Caijin Xie
To explore the dynamic mechanical properties and damage evolution law of the more common layered rock masses in geotechnical engineering, this paper determined the Holmquist–Johnson–Cook (HJC) constitutive model parameters of dolomite, gray sandstone, and limestone according to the static mechanical parameters of the rock mass. We used Hypermesh/ANSYS software to establish the numerical analysis model, carried out the dynamic impact numerical simulation of the layered rock mass, and analyzed the stress wave propagation characteristics, dynamic stress–strain relationship, energy dissipation, and damage evolution laws of layered rock masses under different combinations. At the same time, this paper analyzed the stress characteristics of the layered rock mass and studied its failure characteristics. The research results show that the wave impedance matching relationship alters the dynamic characteristics of the layered rock mass; however, with the increase in impact velocity, the difference gradually weakens. The difference in elastic modulus leads to different initial failure modes of layered rock masses, and the quality of the wave impedance matching relationship leads to differences in the law of damage evolution of layered rock masses. Under different combination forms, the failure degree and failure modes of the two parts of the layered rock mass are different.

25 December 2022 in Scientific Reports
Verified
Journal Article
Open access
PDF file
XTXingchao Tian
Xingchao Tian
TTTiejun Tao
Tiejun Tao
XLXia Liu
Xia Liu
JJJian Jia
Jian Jia
CXCaijin Xie
Caijin Xie
ZZZhenhua Zhao
Zhenhua Zhao
In situ stress and joints have a significant impact on the propagation and attenuation pattern of blast stress waves, and they are two important factors that must be considered for tunnel blasting hole network deployment. This paper proposes a blast stress wave attenuation equation and a peripheral hole distance calculation method under the combined action of in situ stress and joints. First, the static and dynamic parameters of the jointed slate are obtained by drilling core samples in the field and conducting indoor tests. Next, considering the geometric and physical attenuation of the blast stress wave, the attenuation formula of the blast stress wave under the combined action of in situ stress and joints is derived. Based on the theory of the combined action of stress waves and explosive gas, a formula for calculating the peripheral hole distance that integrates the effects of in situ stress, joints, and tensile strength of the rock body is proposed. Finally, LS-PREPOST software is used to analyze the damage to the surrounding rock, verified by an on-site blasting test. The results show that the blast stress wave attenuation formula proposed in this paper can accurately predict the stress wave peak value under the combined action of in situ stress and joints. Combining the geological conditions and blasting parameters of the Bayueshan Tunnel study section, the optimal peripheral hole spacing is calculated to be 45 cm. The average over-excavation value of the grade IV surrounding rock is controlled within 22 cm and the over-consumption of concrete per linear meter is controlled within 100% using the peripheral hole layout method and the hole network layout parameters proposed in this paper. The research results provide a reference for the control of over-excavation and under-excavation in large-section tunnel blasting.

22 April 2024 in Scientific Reports
Verified
Journal Article
Open access
PDF file
BJBingxi Jian
Bingxi Jian
TTTiejun Tao
Tiejun Tao
SSShuai Song
Shuai Song
CXCaijin Xie
Caijin Xie
XTXingchao Tian
Xingchao Tian
AWAntong Wan
Antong Wan
In this study, a new type of multi-arch tunnel construction method is proposed. This effort is undertaken due to the many disadvantages of the traditional multi-arch tunnel construction method. Furthermore, this method omits the construction of a middle pilot tunnel, and it has the advantages of safety, high efficiency, and being economical. When using the method of continuous arch tunneling without a middle pilot tunnel, the blasting of the first tunnel and the following tunnel has a greater impact on the surrounding rock damage, as well as on the supporting structure of the same cross-section. Therefore, this study uses LS-DYNA finite element software to construct a three-dimensional numerical model. In addition, the perimeter rock damage law and mechanical response characteristics of the supporting structure in the same cross-section of the first tunnel, as well as the following tunnel after blasting without a middle pilot tunnel, are analyzed. At the same time, the results of the study are based on optimizing the blasting program, and these are then applied to the field. Through the results, it is found that, after blasting a continuous arch tunnel without a medial pilot tunnel, the surrounding rock damage in the arch cross-region of the double-arch tunnel (where the arch top and the arch shoulder are more significant) and the effective stress of the supporting structure exceed the strength design value. In addition, the maximum adequate pressure is distributed in the medial diaphragm wall. With the optimized blasting scheme, the range of the peripheral rock damage is reduced by a maximum of 67%, and the effective stress in the supporting structure is reduced by 25.9–64.8%. The research results are of great significance in terms of improving construction safety, economic efficiency, and project quality, as well as in promoting the research and development of new work methods for double-arch tunnels.

15 September 2022 in Frontiers in Earth Science
Verified
Journal Article
Open access
XLXia Liu
Xia Liu
TTTiejun Tao
Tiejun Tao
XTXingchao Tian
Xingchao Tian
QLQianxing Lou
Qianxing Lou
CXCaijin Xie
Caijin Xie
The traditional tunnel-drilling and blasting parameter design is based on the small-section roadway and involves many boreholes and conditions that require slow operation progress and thus cannot meet the rapid operation requirements of a large-span tunnel. Taking the Baizhushan Tunnel as the engineering background, this article put forward a theoretical basis for a hole-reducing layout method for large-section tunnel blasting. These parameters of the rock statics and dynamics were obtained through core-drilling sampling in the field and the development of static and dynamic tests. LS-DYNA software was used to establish the numerical model of large-span tunnel blasting. The method was verified through three aspects, namely, cavity effect, effective stress, and surrounding rock damage and was implemented in the field application. The results showed the following: the scheme for reducing-hole numbers used 26 fewer blast holes per cycle footage and saved 0.7 h of drilling time; the average effective stress of the retained rock was 0.6 times that of the original blasting scheme, which reduced the damage to the remaining rock; the maximum over-excavation thickness control was within 50 cm, which reduced over-break; in the field test, the utilization rate of cutting holes was 81.9%, the utilization rate of other blasting holes was 91.2%, the unit consumption of explosives was 0.72 kg/m3, the average over-excavation thickness control was within 20 cm, and the smooth blasting effect was superior.

28 May 2024 in Geomechanics and Geophysics for Geo-Energy and Geo-Resources
Verified
Journal Article
Open access
PDF file
XTXingchao Tian
Xingchao Tian
TTTiejun Tao
Tiejun Tao
CXCaijin Xie
Caijin Xie
The traditional tunnel drilling and blasting method places cut holes at the lower center of the excavation face, resulting in an excessive number of blasting holes. With the continuous increase in cross-section area, this design concept can no longer meet the requirements of safe and efficient tunnel boring for large cross-section tunnels. This paper puts forward the theory and method of reduced-hole blasting for large cross-section tunnels, as an alternative to the traditional drilling and blasting method of the “more holes, less charge” design concept. Based on the explosion energy dissipation law and rock’s critical crushing energy dissipation characteristics, the calculation method of the extrapolation distance of the wedge-cut holes is given. The optimum extrapolation distance of the wedge-cut holes was verified using numerical simulation and field tests. The results show that the number of drilling holes can be reduced by about 15.8% using the theory and method proposed in this paper, and at the same time, the damage of retained rock can be effectively controlled. The results of this study can provide a reference for the design of blast network parameters for similar large cross-section tunnels.