In this paper, the pollutant removal efficiency and the reliability of a vertical and horizontal flow hybrid constructed wetland (CW) planted with common reed, manna grass, and Virginia mallow were analyzed. The wastewater treatment plant, located in south-eastern Poland, treated domestic sewage at an average flow rate of 2.5 m3/d. The tests were carried out during five years of its operation (2014–2018). The following parameters were measured: biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids, total nitrogen, and total phosphorus. The results showed that more than 95% of BOD5, COD, and total phosphorus was removed in the tested CW system. The average effectiveness of removal of total suspended solids and total nitrogen exceeded 86%. A reliability analysis performed using the Weibull probability model showed that the removal reliability in the tested CW was very high for BOD5, COD, total suspended solids, and total phosphorus (100%). The probability that the total nitrogen concentration in the treated effluents would reach the limit value (30 mg/L) established for effluents discharged from a treatment plant of less than 2000 PE (population equivalent) to standing waters was 94%. The values of all the pollution indicators in wastewater discharged to the receiver were significantly lower than the limit values required in Poland. The investigated hybrid CW system with common reed, manna grass, and Virginia mallow guaranteed stable low values of BOD5, COD, total suspended solids, and total phosphorus in the treated wastewater, which meant it was highly likely to be positively evaluated in case of an inspection.
The paper presents the results of a 3-year study on the technological reliability and the efficiency of typical domestic wastewater treatment in two hybrid constructed wetland systems (CWs) located in the area of the Roztocze National Park (Poland). The studied objects consist of an initial settling tank and a system of two beds of the vertical flow (VF) and horizontal flow (HF) (VF–HF) type with reed and willow. The wastewater flow rate in the constructed wetlands systems (CWs) was 0.4 and 1.0 m3/d, respectively. During the study period (2017–2019) 20 series of analyses were performed and 60 wastewater samples were collected. Based on the obtained results the effects of pollutant removal and the technological reliability were determined, which were specified with the Weibull method. The average efficiency of biochemical oxygen demand (BOD5) and chemical oxygen demand (COD) removal was 96–99%. Slightly lower effects were obtained in the case of total phosphorus (TP) removal (90–94%), as well as for total suspended solids (TSS) (80–87%) and total nitrogen (TN) (73–86%) removal. The analysed CWs were characterised by 100% technological reliability for BOD5 and COD, as well as a good reliability for TSS and TP (87–100%) but slightly lower for TN removal (35–89%). Hybrid CWs of VF–HF type should be recommended to use in protected areas for wastewater treatment and water resources quality protection.
This study presents the efficiency of TSS and organic pollutants (BOD5 and COD) removal in a hybrid constructed wetland wastewater treatment plant (VF-HF type) with an aeration system. This study was conducted over 6 years (2017–2022) in a facility with a capacity of 4.5 m3/day located in southeastern Poland and designed to treat real domestic wastewater from a school building. The studied facility consists of a three-chambered septic tank, a pumping station with an aeration system, and two beds with vertical and horizontal flow planted with giant miscanthus and willow. As a result of artificial aeration, the dissolved oxygen concentration in wastewater after mechanical treatment increased significantly, by an average of 1.18 mg O2/L, and was negatively correlated with wastewater temperature. The cumulative pollutant removal effects of the treatment plant (primary settling tank + VFCW + HFCW) were 81% for TSS, 98% for BOD5, and 89% for COD. There was no statistically significant effect of aeration on the organic pollutant removal effects in the VF bed, and such an effect was found for the temperature of wastewater entering the VF bed. The TSS, BOD5, and COD removal effects in the VF bed and BOD5 in the VF-HF system were positively correlated with air temperature. The technological reliability of the treatment plant was 98% for TSS and 100% for BOD5 and COD. The use of artificial aeration of wastewater makes it possible to achieve high organic pollutant removal efficiency in SSF CWs and to compensate for limitations due to the reduction in the area of constructed wetland beds.
The paper presents an evaluation of the pollutant removal efficiencies of four primary settling tanks that were components of on-site domestic wastewater treatment plants located in the Roztocze National Park in Poland. We studied two four-chamber settling tanks which were elements of the...
The results of research on the efficiency and technological reliability of domestic wastewater purification in two household wastewater treatment plants (WWTPs) with activated sludge are presented in this paper. The studied facilities were located in the territory of the Roztocze National Park (Poland). The mean wastewater flow rate in the WWTPs was 1.0 and 1.6 m3/day. In 2017–2019, 20 series of analyses were done, and 40 wastewater samples were taken. On the basis of the received results, the efficiency of basic pollutant removal was determined. The technological reliability of the tested facilities was specified using the Weibull method. The average removal efficiencies for the biochemical oxygen demand in 5 days (BOD5) and chemical oxygen demand (COD) were 66–83% and 62–65%, respectively. Much lower effects were obtained for total suspended solids (TSS) and amounted to 17–48%, while the efficiency of total phosphorus (TP) and total nitrogen (TN) removal did not exceed 34%. The analyzed systems were characterized by the reliability of TSS, BOD5, and COD removal at the level of 76–96%. However, the reliability of TN and TP elimination was less than 5%. Thus, in the case of biogenic compounds, the analyzed systems did not guarantee that the quality of treated wastewater would meet the requirements of the Polish law during any period of operation. This disqualifies the discussed technological solution in terms of its wide application in protected areas and near lakes, where the requirements for nitrogen and phosphorus removal are high.
26 September 2017 in Journal of Water and Land Development
The study investigated the efficiency of removal of iron, manganese and indicator bacteria from potable groundwater by using carbonate-silica rock (opoka). The tests were performed in a laboratory in three filter columns supplied with water containing increased concentrations of iron and manganese. Two of the columns were filled with carbonate-silica rock with particle sizes of 2-5 mm; retention time for water in the columns was set at 1 h and 2 h. A third column was filled with 1-2 mm rock particles, with hydraulic retention time set at 1 h. High removal efficiencies were determined for iron, manganese and coliform bacteria and low removal efficiencies for psychro- and mesophilic bacteria. An increase in the alkalinity of the investigated water was also observed.