1 October 2016 in Ecological Engineering
Verified
Journal Article
Closed access
MGMagdalena Gizińska-Górna
Magdalena Gizińska-Górna
Wojciech CzekałaWojciech Czekała
Wojciech Czekała
Krzysztof JóźwiakowskiKrzysztof Jóźwiakowski
Krzysztof Jóźwiakowski
ALAndrzej Lewicki
Andrzej Lewicki
Jacek DachJacek Dach
Jacek Dach
ALAgnieszka Listosz
Agnieszka Listosz

1 February 2019 in Ecological Engineering
Verified
Journal Article
Closed access
KJKrzysztof Jóźwiakowski
Krzysztof Jóźwiakowski
MMMichał Marzec
Michał Marzec
AKAlina Kowalczyk-Juśko
Alina Kowalczyk-Juśko
MGMagdalena Gizińska-Górna
Magdalena Gizińska-Górna
APAneta Pytka-Woszczyło
Aneta Pytka-Woszczyło
MGMagdalena Gajewska
Magdalena Gajewska

13 October 2018 in Water
Verified
Journal Article
Open access
PDF file
MMMichał Marzec
Michał Marzec
Krzysztof JóźwiakowskiKrzysztof Jóźwiakowski
Krzysztof Jóźwiakowski
ADAnna Dębska
Anna Dębska
MGMagdalena Gizińska-Górna
Magdalena Gizińska-Górna
PPPytka Pytka
Pytka Pytka
ALAgnieszka Listosz
Agnieszka Listosz
In this paper, the pollutant removal efficiency and the reliability of a vertical and horizontal flow hybrid constructed wetland (CW) planted with common reed, manna grass, and Virginia mallow were analyzed. The wastewater treatment plant, located in south-eastern Poland, treated domestic sewage at an average flow rate of 2.5 m3/d. The tests were carried out during five years of its operation (2014–2018). The following parameters were measured: biochemical oxygen demand (BOD5), chemical oxygen demand (COD), total suspended solids, total nitrogen, and total phosphorus. The results showed that more than 95% of BOD5, COD, and total phosphorus was removed in the tested CW system. The average effectiveness of removal of total suspended solids and total nitrogen exceeded 86%. A reliability analysis performed using the Weibull probability model showed that the removal reliability in the tested CW was very high for BOD5, COD, total suspended solids, and total phosphorus (100%). The probability that the total nitrogen concentration in the treated effluents would reach the limit value (30 mg/L) established for effluents discharged from a treatment plant of less than 2000 PE (population equivalent) to standing waters was 94%. The values of all the pollution indicators in wastewater discharged to the receiver were significantly lower than the limit values required in Poland. The investigated hybrid CW system with common reed, manna grass, and Virginia mallow guaranteed stable low values of BOD5, COD, total suspended solids, and total phosphorus in the treated wastewater, which meant it was highly likely to be positively evaluated in case of an inspection.

1 January 2017 in Ecological Engineering
Verified
Journal Article
Closed access
Krzysztof JóźwiakowskiKrzysztof Jóźwiakowski
Krzysztof Jóźwiakowski
MGMagdalena Gajewska
Magdalena Gajewska
APAneta Pytka
Aneta Pytka
MMMichał Marzec
Michał Marzec
MGMagdalena Gizińska-Górna
Magdalena Gizińska-Górna
SBStanisław Baran
Stanisław Baran

1 February 2017 in Separation and Purification Technology
Verified
Journal Article
Closed access
Krzysztof JóźwiakowskiKrzysztof Jóźwiakowski
Krzysztof Jóźwiakowski
MMMichał Marzec
Michał Marzec
JFJan Fiedurek
Jan Fiedurek
AKAgnieszka Kamińska
Agnieszka Kamińska
MGMagdalena Gajewska
Magdalena Gajewska
AKAlina Kowalczyk-Juśko
Alina Kowalczyk-Juśko

1 December 2017 in Journal of Water and Land Development
Verified
Journal Article
Open access
PDF file
MMMichał Marzec
Michał Marzec
The reliability of removal of selected contaminants in three technological solutions of the household sewage treatment plants was analysed in this paper. The reliability of the sewage treatment plant with activated sludge, sprinkled biological deposit and hybrid reactor (activated sludge and immersed trickling filter) was analyzed. The analysis was performed using the Weibull method for basic indicators of impurities, BOD5, COD and total suspended solids. The technological reliability of the active sludge treatment plant was 70% for BOD5, 87% for COD and 66% for total suspended solids. In the sewage treatment plant with a biological deposit, the reliability values determined were: 30% (BOD5), 60% (COD) and 67% (total suspended solids). In a treatment plant with a hybrid reactor, 30% of the BOD5and COD limit values were exceeded, while 30% of the total suspended solids were exceeded. The reliability levels are significantly lower than the acceptable levels proposed in the literature, which means that the wastewater discharged from the analysed wastewater treatment plants often exceeds the limit values of indicators specified in currently valid in Poland Regulation of the Minister of Environment for object to 2000 population equivalent.