Tumiran Tumiran

Dr. Tumiran Tumiran

Universitas Gadjah Mada, Indonesia

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
TTTumiran Tumiran
Tumiran Tumiran
LPLesnanto Multa Putranto
Lesnanto Multa Putranto
Sarjiya SarjiyaSarjiya Sarjiya
Sarjiya Sarjiya
Fransisco Danang WijayaFransisco Danang Wijaya
Fransisco Danang Wijaya
APAdi Priyanto
Adi Priyanto
ISIra Savitri
Ira Savitri
Energy sustainability has become one of the main issues in power system planning in the Indonesian archipelago system, which has many small, isolated systems. For that purpose, green and sustainable generation expansion planning (GEP) procedures based on local energy resources is required. GEP is a necessary procedure for fulfilling electricity demand, which determines the generating units to be installed within a specified time horizon with minimal total costs as the objective function. This study uses GEP considering the interconnection option among the existing small scattered generation systems in Maluku: the isolated Ambon, Seram, Haruku, and Saparua systems. With interconnection, the utilization of local renewable energy sources would be increased, especially biomass, which has abundant potential in these areas. The GEP was simulated in the PLEXOS environment using mixed-integer linear programming (MILP). For comparison purposes, there were interconnection and isolated system scenarios. The results showed that the interconnection system would have a high share of a renewable energy source (RES) of up to 54% in 2050, most of which is biomass as the primary local energy source. The interconnection system scenario met the LOLP criteria and had a lower reserve margin and total costs than the isolated scenario, with USD 773.7 million.

21 September 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
TTTumiran Tumiran
Tumiran Tumiran
LPLesnanto Multa Putranto
Lesnanto Multa Putranto
RIRoni Irnawan
Roni Irnawan
Sarjiya SarjiyaSarjiya Sarjiya
Sarjiya Sarjiya
APAdi Priyanto
Adi Priyanto
ISIra Savitri
Ira Savitri
In order to meet the growth in demand and the renewable energy integration target, the Sulawesi Electricity System (SES) should be expanded. Currently, the SES is divided into two systems, namely South and North Sulawesi. These two systems have different characteristics, such as the system size, reliability and operational cost. North Sulawesi is smaller, weaker and more expensive than the South System. In order to improve the system reliability, generation and transmission expansion planning should be executed simultaneously to meet the economical investment cost and satisfy the reliability standard. For this purpose, the necessity of a backbone system with a higher voltage level than the existing 150 kV system should be considered, including the interconnection option between the two existing systems in Sulawesi. A methodology based on economic and technical criteria was developed to determine the backbone voltage level. Two voltage level options were considered, namely 275 and 500 kV. Several criteria were considered in order to determine the backbone voltage level, including the economic voltage, the line-loading limit, N-1 contingency, short circuiting, transient stability, voltage stability and small signal stability. The backbone voltage candidates should fulfil all of the criteria. The simulation was conducted in base- and high-demand scenarios, considering the fluctuation of future economic growth. The load flow and the dynamic analysis were simulated in a DIgSILENT Power Factory environment. The results showed that the 275 kV backbone, which was built in 2022, would violate three criteria: the economic voltage, N-1 contingency and voltage stability. On the other hand, the 500 kV backbone voltage level fulfills all of the criteria. The result of this research was considered in the electricity planning documents in Sulawesi. From a technical and economical perspective, the 500 kV backbone was chosen for the SES.

10 July 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
TTTumiran Tumiran
Tumiran Tumiran
LPLesnanto Multa Putranto
Lesnanto Multa Putranto
RIRoni Irnawan
Roni Irnawan
Sarjiya SarjiyaSarjiya Sarjiya
Sarjiya Sarjiya
CNCandra Febri Nugraha
Candra Febri Nugraha
ISIra Savitri
Ira Savitri
The planning of electrical power systems in remote island areas poses a few challenges, such as requiring many load centers, various energy sources, and certain geographical conditions, which leads to inefficiencies in energy production. For this reason, it is necessary to plan an electrical transmission system to efficiently transfer the power between load centers. Previous research has found that the completion of the most economical power system will be achieved in 2050 on the condition that the Ambon, Seram, Haruku, and Saparua (Ambon-SHS) systems are interconnected in 2025. Providing complementary support, this paper conducts a power system analysis to assess the proposed interconnection system in Maluku Island, which has several islands, small load centers, and local renewable energy resources. The power system analysis was performed using DIgSILENT PowerFactory and was carried out every 5 years of the system planning period until 2050. The results show that the design of the obtained transmission system meets the standard security criteria, which include thermal loading and voltage, being under both normal and N-1 contingency conditions, a short-circuit current, voltage stability, frequency stability, and transient stability. Finally, this paper demonstrates that the proposed plan is economically and technically feasible.

25 November 2022 in Applied Sciences
Verified
Journal Article
Open access
PDF file
FDFaiq Arkan Dewanto
Faiq Arkan Dewanto
AKAdityadika Miftakhul Khakim
Adityadika Miftakhul Khakim
TTTumiran Tumiran
Tumiran Tumiran
MWMochammad Wahyudi
Mochammad Wahyudi
Noor Akhmad SetiawanNoor Akhmad Setiawan
Noor Akhmad Setiawan
DSDharma Saputra
Dharma Saputra
The condition of each cup-and-pin insulator that forms a string must be considered in order to obtain effective guidance for contamination flashover mitigation. This paper describes an approach to assess the string condition based on the ultraviolet (UV) emitted by each cup-and-pin insulator during partial discharge condition. The UV patterns on the string were observed visually in the laboratory test. The criteria of string condition level was built based on the patterns and applied to the strings installed in the field. The index value expressing the string condition level in the field (level status) was then compared with the UV quantitative parameter extracted from the UV video. At the final stage, a logarithmic regression classification model was built based on these two values. The laboratory test results showed that there were three levels of string condition, namely level one (safest), level two, and level three (most dangerous). Most strings in the field had category level two, while most strings with level three were of the suspension type. The UV emission area parameters expressed in pixels and percentages were able to represent the sporadic nature of the discharge phenomenon. The proposed approach provided a predictive model with a mean absolute error of 0.182.