Nikolaos Manousakis

Prof. Dr. Nikolaos Manousakis

Department of electrical and electronics engineering, University of West Attica, Egaleo 122 43, Greece
orcid

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
18 May 2023 in Processes
Verified
Journal Article
Open access
PDF file
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis
PKPanagiotis Karagiannopoulos
Panagiotis Karagiannopoulos
GTGeorge J. Tsekouras
George J. Tsekouras
FKFotis Kanellos
Fotis Kanellos
Electric vehicles (EVs) represent a promising green technology for mitigating environmental impacts. However, their widespread adoption has significant implications for management, monitoring, and control of power systems. The integration of renewable energy sources (RESs), commonly referred to as green energy sources or alternative energy sources, into the network infrastructure is a sustainable and effective approach to addressing these matters. This paper provides a comprehensive review of the integration of RESs and EVs into power systems. The bibliographic analysis revealed that IEEE Access had the highest impact among journals. In order to enhance the classification of the reviewed literature, we have provided an analytical summary of the contributions made by each paper. The categorization facilitated the recognition of the primary objectives explored in the reviewed works, including the classification of EVs and RESs, the incorporation of RESs and EVs into power systems with an emphasis on emissions, the establishment of EV charging stations and parking facilities, EV batteries and battery energy storage systems, strategies for managing the integration of RESs with EVs, EV aggregators, and the financial implications. In order to provide researchers with a valuable synopsis of the implementation particulars, the papers were bifurcated into two primary classifications, namely mathematical algorithms and heuristic algorithms. The mixed integer linear programming algorithm and particle swarm optimization algorithm were commonly utilized formulations in optimization. MATLAB/Simulink was the primary platform used for executing a considerable portion of these algorithms, with CPLEX being the dominant optimization tool. Finally, this study offers avenues for further discourse and investigation regarding areas of research that remain unexplored.

1 April 2013 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
NKNikolaos C. Koutsoukis
Nikolaos C. Koutsoukis
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis
Pavlos GeorgilakisPavlos Georgilakis
Pavlos Georgilakis
GKGeorge Korres
George Korres
Phasor measurement units (PMUs) are essential tools for monitoring, protection and control of power systems. The optimal PMU placement (OPP) problem refers to the determination of the minimal number of PMUs and their corresponding locations in order to achieve full network observability. This paper introduces a recursive Tabu search (RTS) method to solve the OPP problem. More specifically, the traditional Tabu search (TS) metaheuristic algorithm is executed multiple times, while in the initialisation of each TS the best solution found from all previous executions is used. The proposed RTS is found to be the best among three alternative TS initialisation schemes, in regard to the impact on the success rate of the algorithm. A numerical method is proposed for checking network observability, unlike most existing metaheuristic OPP methods, which are based on topological observability methods. The proposed RTS method is tested on the IEEE 14, 30, 57 and 118‐bus test systems, on the New England 39‐bus test system and on the 2383‐bus power system. The obtained results are compared with other reported PMU placement methods. The simulation results show that the proposed RTS method finds the minimum number of PMUs, unlike earlier methods which may find either the same or even higher number of PMUs.

1 July 2011 in Electric Power Systems Research
Verified
Journal Article
Closed access
GKGeorge N. Korres
George N. Korres
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis

7 March 2013 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis
KOKorres
Korres
GKGeorge N. Korres
George N. Korres
This letter presents a new method for optimal placement of phasor measurement units (PMU) for complete power system observability. The optimal PMU placement (OPP) problem is formulated as a quadratic minimization problem with continuous decision variables subject to nonlinear observability constraints. The optimal solution is obtained by an unconstrained nonlinear weighted least squares (WLS) approach. Simulations are conducted on different IEEE systems (14-bus, 30-bus, 57-bus, and 118-bus) to prove the validity of the proposed algorithm.

1 November 2015 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
GKGeorge Korres
George Korres
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis
TXThemistoklis C. Xygkis
Themistoklis C. Xygkis
JLJohan Löfberg
Johan Löfberg
This study presents a new approach for optimal placement of synchronised phasor measurement units (PMUs) to ensure complete power system observability in the presence of non‐synchronous conventional measurements and zero injections. Currently, financial or technical restrictions prohibit the deployment of PMUs on every bus, which in turn motivates their strategic placement across the power system. PMU allocation is optimised here based on measurement observability criteria for achieving solvability of the power system state estimation. Most of the previous work has proposed topological observability based methods for optimal PMU placement (OPP), which may not always ensure numerical observability required for successful execution of state estimation. The proposed OPP method finds out the minimum number and the optimal locations of PMUs required to make the power system numerically observable. The problem is formulated as a binary semi‐definite programming (BSDP) model, with binary decision variables, minimising a linear objective function subject to linear matrix inequality observability constraints. The BSDP problem is solved using an outer approximation scheme based on binary integer linear programming. The developed method is conducted on IEEE standard test systems. A large‐scale system with 3120 buses is also analysed to exhibit the applicability of proposed model to practical power system cases.

31 July 2019 in IEEE Transactions on Instrumentation and Measurement
Verified
Journal Article
Closed access
Nikolaos ManousakisNikolaos Manousakis
Nikolaos Manousakis
GKGeorge Korres
George Korres
This paper presents an efficient and comprehensive method to find out the minimum number and corresponding locations of phasor measurement units (PMUs) guaranteeing full numerical observability of a power system as well as maximizing the measurement redundancy in conjunction with pre-existing conventional measurements. Furthermore, the effect of the number of available channels of PMUs on their optimal placement can be taken into account. The proposed optimal PMU placement (OPP) formulation is extended to consider the case of two types of contingencies, single PMU loss and single branch outage. The objective in the OPP method is the numerical observability, unlike the majority of earlier works which are based on topological observability and do not always ensure numerical observability required for successful execution of state estimation. The problem is formulated as a binary semidefinite programming model with binary decision variables, minimizing a linear objective function subject to linear matrix inequality observability constraints. The binary semidefinite programming problem is solved using an outer approximation scheme based on binary integer linear programming. The effectiveness of the proposed method is verified on different IEEE test systems.