Amir Faraji

Dr. Amir Faraji

Western Sydney University

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 February 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
Amir FarajiAmir Faraji
Amir Faraji
Maria RashidiMaria Rashidi
Maria Rashidi
Fatemeh RezaeiFatemeh Rezaei
Fatemeh Rezaei
Payam RahnamayiezekavatPayam Rahnamayiezekavat
Payam Rahnamayiezekavat
Occupant comfort in buildings is one of the most crucial considerations in designing a building. Accordingly, there is a growing interest in this area. Aspects of comfort include thermal comfort, visual comfort, acoustic comfort, and indoor air quality (IAQ) satisfaction. The objective of this state-of-the-art review was to provide a comprehensive, explicit, and up-to-date literature review on occupant comfort in buildings, since this issue has a great impact on the lifestyle, health, and productivity of occupants. A meta-synthesis method was also used for an analytical-interpretive review of previous studies. In this research, scientific research studies related to the subject of indoor occupant comfort in the period 2002–2022 were reviewed. Previous reviews have often covered the fundamental concepts and principles related to indoor occupant comfort. Although innumerable studies have focused on thermal comfort, other aspects of occupant comfort have not been considered. The review is analyzed and discussed in reference to type of study, case study geographical locations and climate zones, case study building types, decision-making models, assessment criteria, data-collection tools, and data analysis strategies. Finally, future research recommendations are presented. Through the review, we find that the comfort models used in research are mostly based on comfort perception votes collected from experimental studies, which may not reflect the preferences of users well. In addition, only the influence of environmental factors on the models has been investigated, and other personal factors have been ignored. This study presents a useful guide for researchers to determine their outlines for future research in this field.

13 February 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Amir FarajiAmir Faraji
Amir Faraji
Maria RashidiMaria Rashidi
Maria Rashidi
Srinath PereraSrinath Perera
Srinath Perera
Bijan SamaliBijan Samali
Bijan Samali
Project management standards, like PMBOK, have had a considerable role in developing this field of knowledge and promoting it as a professional expertise in project-oriented industries, such as the construction industry. The latest version of PMBOK, seventh edition—2021, has been released with substantial changes, and the conventional process-based system has been converted to a performance-based approach. This study aimed to investigate the recent edition of PMBOK, to explore its application and adaptation regarding the specific characteristics of the construction industry. For this purpose, utilizing a hybrid methodology of text mining and survey method, at first, the content of the text was analyzed by software in combination with experts’ opinions. In a parallel survey, the distinctive attributes of the construction industry were investigated, and in the next step, the way that this sector can benefit from the emerging framework was examined. The results show the construction industry has special peculiarities in the form of four different project types with specific phases in typical lifecycle and reveal the potential applicability of performance domains in the construction projects and the compatibility of project management principles. This study is one of the first attempts to review the novel presented standard of PMBOK seventh edition and contributes to the present knowledge by analyzing the construction industry in relation to this issue.

26 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Amir FarajiAmir Faraji
Amir Faraji
Maria RashidiMaria Rashidi
Maria Rashidi
TATahereh Meydani Haji Agha
Tahereh Meydani Haji Agha
Payam RahnamayiezekavatPayam Rahnamayiezekavat
Payam Rahnamayiezekavat
Bijan SamaliBijan Samali
Bijan Samali
Quality management in project administration can affect the costs and schedule of a project considerably. The immediate notable result of unacceptable quality in a construction project is the “dissatisfied client.” which can be interpreted as “customer loss”. Additionally, defective work is a synonym for problems such as dispute, because items of non-compliance with early agreements can be considered the main factor in triggering claims by the client. The integrated use of two modern technologies, namely Building Information Modeling (BIM) and Unmanned Aerial Vehicles (UAV) is proposed in this study to support project quality management (PQM). This study aims to develop the theoretical underpinnings to provide a quality management framework, formed by BIM-UAV, for housing projects in design-build (D&B) contracts. For this purpose, in the first step the causes of client dissatisfaction rooted in quality concerns were identified in two phases of design and construction. The next step was dedicated to the mapping of BIM-UAV capacities to address the identified causes of dissatisfaction of the client. In the final step, expert opinion was obtained to integrate the BIM-UAV capacities to the quality management framework. The findings and main contribution of this study to the body of knowledge is a guide for design-builders to implement BIM-UAV as an innovative quality management solution to improve their services and to gain the maximum level of client satisfaction, focusing on house building.

27 March 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Amir FarajiAmir Faraji
Amir Faraji
SAShima Homayoon Arya
Shima Homayoon Arya
EGElnaz Ghasemi
Elnaz Ghasemi
Payam RahnamayiezekavatPayam Rahnamayiezekavat
Payam Rahnamayiezekavat
Srinath PereraSrinath Perera
Srinath Perera
Investigating Industry 4.0 technologies and studying their impacts on various aspects of the construction industry, including stakeholders and the lifecycle, is vital to enhance novel applications of such technologies in an industry that is known as Construction 4.0. The main objective of the current state-of-the-art review is to provide a comprehensive literature review on three widely used Industry 4.0 technologies, Building Information Modeling (BIM), Blockchain, and LiDAR, which have strong potential to promote and optimize different activities of the project, and also, the integration of them can greatly impact the construction industry in the whole project lifecycle. A bibliometric analysis of keyword co-occurrence and citations revealed a significant number of publications from 2014 to 2023 investigating the selected technologies. Recent trends indicate that the majority of papers have considered the selected technologies in the integration with each other. However, a specific gap exists in the literature regarding the interactions and potential synergies among these technologies. This gap limits the understanding of how these integrations can address challenges unique to the construction industry and hinders the development of comprehensive solutions. The review has been analyzed and discussed in reference to the type of article, single or multi technologies, the lifecycle, and their applications. The study showed that the integration of BIM, Blockchain, and LiDAR, as a recent trend and as a beneficial solution to automate the whole construction process, has considerable capacities to improve the productivity of the construction industry. Finally, some application areas for the integration of these three technologies are concluded and are suggested, and therefore, an advantageous reference has been provided for scholars to plan their future research in this sector.

30 September 2022 in Buildings
Verified
Journal Article
Open access
PDF file
Payam RahnamayiezekavatPayam Rahnamayiezekavat
Payam Rahnamayiezekavat
ESEhsan Sorooshnia
Ehsan Sorooshnia
Maria RashidiMaria Rashidi
Maria Rashidi
Amir FarajiAmir Faraji
Amir Faraji
Sherif MostafaSherif Mostafa
Sherif Mostafa
SMSungkon Moon
Sungkon Moon
Project claim management is the central pillar of the overlapping areas of contract administration, contract law and building regulations. Delays caused by inefficiency of the procedures designed to avoid disputes emerge at the pre-project phase and continue during construction. The quantum of research addressing this issue is not immediately transferrable between jurisdictions, mainly due to local specificity of construction practices, contract and construction laws, as well as clients’ preferences. The primary aim of this study is to identify the underlying causes of disputes that have arisen in the NSW construction industry in the past two decades and to analyze the inter-relationships between the causes. To achieve this purpose, PLS-SEM quantitative models were utilized to study different factors influencing disputes. Through a detailed quantitative analysis of 230 cases, based on dispute frequencies, causes and effect analysis and the resultant loop cause diagrams, the dispute triggers, types, and root causes have been analyzed as the basis for developing a model to predict the future likelihood of disputes. Finally, 13 causes of disputes have been recognized as the main causal factors in the construction projects in NSW. This study also has shown that payment and reimbursement-related disputes are the most frequent in NSW construction, except for the last two years.

2 August 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
Amir FarajiAmir Faraji
Amir Faraji
Fatemeh RezaeiFatemeh Rezaei
Fatemeh Rezaei
Payam RahnamayiezekavatPayam Rahnamayiezekavat
Payam Rahnamayiezekavat
Maria RashidiMaria Rashidi
Maria Rashidi
HSHossein Soleimani
Hossein Soleimani
Glare is a kind of physiological phenomenon that influences occupants’ visual comfort. Discomfort glare scenes in comparison to other levels of glare have been difficult to estimate and need accurate and reliable metrics. In contemporary architecture, the glass façade is so popular since it can remarkably minimize energy consumption in buildings and maximize daylight utilization as a natural energy. However, it is necessary to consider occupants’ visual discomfort due to the daylighting glare risks during the initial stage of design. Since the measured glare metrics should have an acceptable correlation with the human subject data study, the agreement on the glare indices is complicated. This paper presents a comparison between subjective and simulation-based analysis of discomfort glare metrics in offices with a light shelf system. The discomfort glare metrics considered in this study include Daylight Glare Index (DGI), CIE Glare Index (CGI), Visual Comfort Probability (VCP), Unified Glare Rating (UGR), and Daylight Glare Probability (DGP). The parallel comparison was conducted by using simulation and questionnaire surveys to determine which criteria are more useful under different conditions. According to the findings, DGP yields the most reliable results in different levels of glare based on the subjective analysis and VCP has the lowest accuracy in each stage. UGR also has the highest accuracy rate for evaluating perceptible glare, DGI is applicable for assessing imperceptible glare, and CGI can be an acceptable index for approximating intolerable glare. The study results significantly reduce the complexity of the problem and can provide useful guidance for designers to select the most reliable glare metric based on climatic conditions.