Guihe Wang

Prof. Dr. Guihe Wang

School of Engineering and Technology, China University of Geosciences (Beijing)

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 October 2023 in International Journal of Civil Engineering
Verified
Journal Article
Closed access
PDF file
YLYanchao Liu
Yanchao Liu
FHfeng huang
feng huang
GWGuihe Wang
Guihe Wang
YCYanhui Cao
Yanhui Cao
GWGuihe Wang
Guihe Wang

29 October 2023 in Deep Underground Science and Engineering
Verified
Journal Article
Open access
JZJinxun Zhang
Jinxun Zhang
GWGuihe Wang
Guihe Wang
GWGuihe Wang
Guihe Wang
YJYusheng Jiang
Yusheng Jiang
HJHua Jiang
Hua Jiang
ZSZhengyang Sun
Zhengyang Sun
During shield tunneling in highly abrasive formations such as sand–pebble strata, nonuniform wear of shield cutters is inevitable due to the different cutting distances. Frequent downtimes and cutter replacements have become major obstacles to long‐distance shield driving in sand–pebble strata. Based on the cutter wear characteristics in sand–pebble strata in Beijing, a design methodology for the cutterhead and cutters was established in this study to achieve uniform wear of all cutters by the principle of frictional wear. The applicability of the design method was verified through three‐dimensional simulations using the engineering discrete element method. The results show that uniform wear of all cutters on the cutterhead could be achieved by installing different numbers of cutters on each trajectory radius and designing a curved spoke with a certain arch height according to the shield diameter. Under the uniform wear scheme, the cutter wear coefficient is greatly reduced, and the largest shield driving distance is increased by approximately 47% over the engineering scheme. The research results indicate that the problem of nonuniform cutter wear in shield excavation could be overcome, thereby providing guiding significance for theoretical innovation and construction of long‐distance shield excavation in highly abrasive strata.

1 January 2020 in Advances in Civil Engineering
Verified
Journal Article
Open access
GWGuihe Wang
Guihe Wang
CJCangqin Jia
Cangqin Jia
GWGuihe Wang
Guihe Wang
JRJun Ren
Jun Ren
GLGaofeng Lu
Gaofeng Lu
NLNannan Liu
Nannan Liu
Based on the Yongdingmen Station of Beijing Metro, the underwater excavation method for deep foundation pit was introduced. This study constructed a numerical analysis model to analyze the performance of surface settlement and lateral wall deflection in the process of underwater excavation. Results showed that this method was better to control the surface settlement and lateral wall deflection compared with other dewatering excavations. In detail, most of the surface settlement was caused during the dry excavation stage and dewatering excavation stage while the deflection caused by underwater excavation only accounted for about 10% of the total settlement. Besides, the maximum settlement occurred 0.25∼0.5 He behind the retaining wall and the value was 0.04% He. Similar to the result of the surface settlement, most of the lateral wall deflection had been completed before the underwater excavation, which only caused about 7% of the total deflection. The maximum wall deflection and its location were approximately 0.06% He and 0.5 He, respectively. Moreover, a series of 3D numerical analyses were studied on the design parameters of the underwater excavation method. This study can be used as a reference for general performance and structural design of foundation pits with underwater excavation.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
GWGuihe Wang
Guihe Wang
GWGuihe Wang
Guihe Wang
CJCangqin Jia
Cangqin Jia
JRJun Ren
Jun Ren
GLGaofeng Lu
Gaofeng Lu
NLNannan Liu
Nannan Liu
Cross walls have been used as alternative auxiliary measures to protect buildings in some areas of Asia. Realizing the inadequacy of the classical Winkler foundation to predict the deflection of the diaphragm wall with cross wall, a modified Winkler foundation of the finite element method (MEFB) was formulated in this paper. Then, the MEFB method was verified through two excavation cases and applied in a new well‐documented excavation history. Results showed that the wall deflection by the proposed method was line with the 3D numerical analysis and field observations but smaller than that of classical Winkler’s elastic foundation (EFB) method. The maximum deformation calculated by the MEFB method was predicted to have a reduction of 40∼60% compared to those of the EFB method. Meanwhile, the wall deformation was minimum at the location of cross walls and reaches the maximum value at the midline between two cross walls. Besides, the plane strain ratio (PSRd) based on the MEFB method was defined to study the interval (L), the embedded depth, and arrangement of cross walls. The results indicated the MEFB method was used successfully as a more accurate method than Winkler foundation and is simpler than 3D numerical analysis method for the engineering design of the diaphragm‐cross wall system during excavation.