Iman Saeedi

Iman Saeedi


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 July 2020 in Environment, Development and Sustainability
Verified
Journal Article
Closed access
PDF file
ISIman Saeedi
Iman Saeedi
EDElham Dabbagh
Elham Dabbagh



14 January 2022 in Natural Resource Modeling
Verified
Journal Article
Open access
PDF file
ISIman Saeedi
Iman Saeedi
ATAli Reza Mikaeili Tabrizi
Ali Reza Mikaeili Tabrizi
ABAbdolreza Bahremand
Abdolreza Bahremand
ASAbdolrassoul Salmanmahiny
Abdolrassoul Salmanmahiny
Green Infrastructure Development (GID) is a well‐known method for dealing with runoff control and mitigating the urbanization effects on hydrological cycles. Other than hydrological factors, GID is obviously intertwined with many socioeconomic, environmental, and aesthetic considerations, constraints, and drivers. Human perceptions are valuable resources to distinguish these considerations and can be derived from unstructured information using a systematic method. The purpose of this article is to exhibit how the perceptions of stakeholders were derived in Tehran for a conceptual model of green infrastructure development. For this, we applied a combination of Soft Systems Methodology (SSM) and Interpretive Structural Modeling (ISM). The results revealed the main stakeholders, their relationships and responsibility, main obstacles for GID, and the conceptual system of activities for GIs development in Tehran. Based on the results, actions for improving the current situation were proposed and categorized in 10 main components including: further research, regulation, financial support, negotiation with stakeholders, evaluation and monitoring, enhancing stakeholders' interactions, providing comprehensive database, acculturalization, managerial reform, and training of stakeholders. ISM was performed to obtain a visible, ordered, and well‐defined model of the relationships among the main components. The results revealed that the item “further research” plays the main role in actualizing three components “regulation,” “financial support,” and “negotiation with stakeholders” in the process of GID in Tehran while the realization of the rest of the components depends on the former three components.

22 May 2023 in Natural Resource Modeling
Verified
Journal Article
Open access
ISIman Saeedi
Iman Saeedi
ATAli Reza Mikaeili Tabrizi
Ali Reza Mikaeili Tabrizi
ABAbdolreza Bahremand
Abdolreza Bahremand
ASAbdolrassoul Salmanmahiny
Abdolrassoul Salmanmahiny
Green Infrastructures as Best Management Practice (GI‐BMP) play important role in preserving cities from urban flood and excessive runoff. In the process of using GI‐BMP in cities for stormwater management, a number of steps are taken that normally include selection of suitable sites, formulating proper combination of infrastructures, and optimization of the place and design of GI‐BMPs to maximize their cost‐effectiveness. This paper presents a site‐scale GI‐BMP implementation in Tehran West Bus Terminal (TWBT), Iran. To achieve this goal, this study applies a three steps framework namely GI‐BMP suitability analysis, GI‐BMP combination planning, and GI‐BMP optimization. In the first step, using the BMP Siting Tool, the suitable places for allocating GI practices were identified. In the next step, suitable GI‐BMP practices, including permeable pavements, bioretention basin, infiltration trench, and rain barrel were planned and arranged for each subwatersheds of the study area. In the third step, with the use of System for Urban Stormwater Treatment and Analysis Integration (SUSTAIN) model and NSGA‐II algorithm, the sizes of the planned GI‐BMP types were optimized for each subwatershed. The results indicate that runoff problem caused by surface runoff in the study area was serious and needed to be controlled. The results also revealed that there were 104 near‐optimal solutions that help reduce runoff volume by up to 70%. According to the results, applying GI‐BMPs in TWBT will reduce 60% of flow volume in the site with the price of 353,568$. This research is of practical importance for stormwater management using nature‐based solutions in bus terminals.

8 September 2026 in Security Journal
Verified
Journal Article
Closed access
PDF file
ISIman Saeedi
Iman Saeedi
NHNazanin Habibi
Nazanin Habibi