Kaifeng Wang

Kaifeng Wang


Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 January 2021 in Materials
Verified
Journal Article
Open access
PDF file
Yanfei RenYanfei Ren
Yanfei Ren
MCMeizhu Chen
Meizhu Chen
TYTianyuan Yang
Tianyuan Yang
Shaopeng WuShaopeng Wu
Shaopeng Wu
KWKaifeng Wang
Kaifeng Wang
With the rapid development of tunnel construction, tunnel safety and the shortage of high-quality aggregates have concerned researchers so that this issue has become a research hot spot in the past few years. In the present study, we intended to prepare warm-mixed flame-retardant asphalt concrete using steel slag aggregate and evaluate its pavement and flame retardant performance. In this regard, the chemical composition and microstructure of the steel slag were studied using X-ray fluorescence analysis (XRF) and scanning electron microscopy (SEM). Then diverse pavement performances, including the dynamic stability, immersion Marshall, freeze–thaw splitting strength and low-temperature bending, were investigated for the warm-mixed flame-retardant asphalt concrete with steel slag aggregate. Moreover, a creative method of the flame spray gun combustion test was proposed to characterize the combustion degree and evaluate the flame-retardant performance of the asphalt concrete with steel slag. The experimental results show that the high-temperature and moisture stability performance are improved due to the addition of steel slag, however, the low-temperature performance is reduced for the warm-mixed flame-retardant asphalt concrete while it is still higher than the requirement value of the Chinese specification (GB/T 30596-2014). Meanwhile, the ignition temperature is increased and the ignition time is delayed for warm-mixed flame-retardant asphalt concrete because of the addition of steel slag. It is concluded that asphalt concrete with steel slag has excellent flame-retardant performance so that it is an appropriate choice for tunnel pavement.

23 July 2012
Verified
Conference Paper
Closed access
KWKaifeng Wang
Kaifeng Wang
YZYunsheng Zhu
Yunsheng Zhu
XZXiedong Zhang
Xiedong Zhang
With the rapid development of the national economy, frequent construction safety accidents on mountainous freeways have become the focus of social attention. It is a priority to establish a construction safety early-warning system of freeways in the mountainous region in order to change the passive situation of safety management. From the viewpoint of system engineering, the model of a construction enterprise safety capability was established with the basic principle of analytic hierarchy process. Taking characteristic vectors of paired comparison matrices as weights of every factor, the influence sequence of the assessment factors was determined. Results reveal that production safety liability systems and hazard installation control are key factors that influence construction enterprise safety capability. In order to improve the safety status in construction enterprise, following measures are important in establishing healthy production safety liability systems and reinforce hazard installation control. Analysis shows that the assessment index system of enterprise safety construction based on analytic hierarchy process reflects the key factors that influence construction enterprise safety capability and provides corresponding improvement measures.

26 July 2011
Verified
Conference Paper
Closed access
KWKaifeng Wang
Kaifeng Wang
XZXiedong Zhang
Xiedong Zhang
YZYunsheng Zhu
Yunsheng Zhu
XLXuejun Li
Xuejun Li
In recent years, frequent safety accidents have resulted in great loss to the national property. It is important to carry out risk assessment of construction safety on mountainous freeways. A fussy synthetic assessment model of construction safety on mountainous freeways, as well as a relevant safety assessment factor system, was established. The weights of factors were calculated by analytic hierarchy process. Using Cauchy distribution, subjection function of factor sets and judging matrix were gained. Result vector was calculated and safety status grade on freeways was estimated through fussy assessment. The construction safety status of five work sites on Hubei Hurongxi Freeway was evaluated using fussy evaluation model. Construction safety evaluation ranks and degrees of all work sites were calculated. Results show the situations of safety control management and the securities of the second and third work site should be strengthened. Analysis reveals the whole safety on site can be achieved by effectively adopting fussy assessment.

18 September 2009 in Wuhan University Journal of Natural Sciences
Verified
Journal Article
Closed access
PDF file
KWKaifeng Wang
Kaifeng Wang
XZXiedong Zhang
Xiedong Zhang
XWXiaohuang Wang
Xiaohuang Wang
JYJianyi Yu
Jianyi Yu
SYSheng Yi
Sheng Yi

23 July 2009
Verified
Conference Paper
Closed access
KWKaifeng Wang
Kaifeng Wang
XZXiedong Zhang
Xiedong Zhang
XWXiaohuang Wang
Xiaohuang Wang
JYJianyi Yu
Jianyi Yu
SYSheng Yi
Sheng Yi
In recent years, with the rapid development of the national economy, frequent construction accidents on mountainous freeways result in a great loss of national property and become the focus of the nation's attention. It is urgent that we establish a construction safety early-warning system for freeways in mountainous regions in order to radically improve the situation of safety management. Major hazard identification and risk assessment is still lacking in the field. In order to solve this problem, a construction safety early-warning system for mountainous freeways was established. The targets, function, input and output of system were analyzed. The safety early-warning indicator system was made up of people, materials, environment, and management factors. The weights of factors were calculated by an analytic hierarchy process. The safety status grade was determined by a safety early-warning model. Results revealed that the safety early-warning system can reflect the safety status in freeway construction of mountainous regions objectively.