chunde Ma

Prof. chunde Ma


Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 April 2024 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
GTGuanshuang Tan
Guanshuang Tan
CMchunde Ma
chunde Ma
JZJunjie Zhang
Junjie Zhang
WYWenyuan Yang
Wenyuan Yang
GZGuiyin Zhang
Guiyin Zhang
ZKZihao Kang
Zihao Kang

4 May 2022 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
ZLZelin Liu
Zelin Liu
CMchunde Ma
chunde Ma
XWXin’aO Wei
Xin’aO Wei
WXWeibin Xie
Weibin Xie

31 March 2022 in Geomechanics and Geophysics for Geo-Energy and Geo-Resources
Verified
Journal Article
Closed access
PDF file
ZLZelin Liu
Zelin Liu
CMchunde Ma
chunde Ma
XWXin-Ao Wei
Xin-Ao Wei

16 October 2021 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
ZLZelin Liu
Zelin Liu
CMchunde Ma
chunde Ma
XWXin’ao Wei
Xin’ao Wei
WXWeibin Xie
Weibin Xie

7 February 2023 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
CMchunde Ma
chunde Ma
GTGuanshuang Tan
Guanshuang Tan
ZLZhihai Lv
Zhihai Lv
WYWenyuan Yang
Wenyuan Yang
JZJunjie Zhang
Junjie Zhang

27 September 2020 in Applied Sciences
Verified
Journal Article
Open access
PDF file
CMchunde Ma
chunde Ma
WXWeibin Xie
Weibin Xie
ZLZelin Liu
Zelin Liu
QLQiyue Li
Qiyue Li
JXJiaqing Xu
Jiaqing Xu
GTGuanshuang Tan
Guanshuang Tan
In this paper, the aim is to achieve safe, rapid excavation of an extra-long, large-cross-section highway tunnel in Eastern Tianshan, as well as to reduce production costs, simplify production processes, reduce cycle time, and improve production efficiency. In this study, we explored a new technology for smooth blasting without a detonating cord. A series of sympathetic detonation experiments were conducted in the tunnel face to determine critical distances. The critical distance for No. 2 rock emulsion explosive under blasthole constraints was successfully measured to be approximately 1.0–1.1 m. Based on the critical distance, a new charging structure was designed for tunnel excavation. To assess the influence of the new charging structure on blasting performance, its economic benefits, and its feasibility, full-section tests were performed in the East Tianshan Tunnel. The application of the new charging structure produced good smooth blasting results. It not only simplified the charging process and produced smooth blasting without detonating cord in peripheral holes, but also guaranteed normal excavation, an appropriate tunnel profile, and reasonable overbreak and underbreak volumes. This had remarkable economic benefits and possesses better promotional value.