Enrique Del Rey Castillo

Dr. Enrique Del Rey Castillo

Department of Civil and Environmental Engineering, University of Auckland, Building Room 414, 262-390 Khyber Pass Rd., Newmarket, Auckland 1023, New Zealand
orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2018 in Composite Structures
Verified
Journal Article
Closed access
Enrique Del Rey CastilloEnrique Del Rey Castillo
Enrique Del Rey Castillo
MGMichael Griffith
Michael Griffith
JIJason Ingham
Jason Ingham


1 April 2019 in Composite Structures
Verified
Journal Article
Closed access
Enrique Del Rey CastilloEnrique Del Rey Castillo
Enrique Del Rey Castillo
RKRavi Kanitkar
Ravi Kanitkar
SSScott T. Smith
Scott T. Smith
MGMichael C. Griffith
Michael C. Griffith
JIJason M. Ingham
Jason M. Ingham

20 December 2022 in Structure and Infrastructure Engineering
Verified
Journal Article
Closed access
FWFeng Wang
Feng Wang
Yang ZouYang Zou
Yang Zou
Enrique Del Rey CastilloEnrique Del Rey Castillo
Enrique Del Rey Castillo
YDYouliang Ding
Youliang Ding
ZXZhao Xu
Zhao Xu
James B.P. LimJames B.P. Lim
James B.P. Lim
The bridge models reconstructed from unmanned aerial vehicle (UAV) images via photogrammetry are often reported to have quality issues (e.g., high noise, insufficient resolution and precision loss) and thus restrict their application in bridge inspection. To address this problem, this paper proposes a novel Building Information Model (BIM)-based 3D path planning method for improving the quality of photogrammetric bridge models by optimising the UAV flight plan. This method firstly uses a simple BIM model as input and considers inspection and photogrammetry requirements to generate effective UAV viewpoints. Then it adjusts inaccessible UAV viewpoints that are in occupied space or cannot meet the flight safety rules. Finally, a feasible flight trajectory is generated through all valid viewpoints. To evaluate the performance of the proposed method, two prototypes were developed to automate the path planning and on-site image acquisition, respectively, and were tested on a real girder bridge. The results showed that, compared with the common UAV flight plan used in current practice, the proposed method could: (1) generate a more precise bridge model with fewer noise points and higher visual quality to support damage detection; and (2) significantly improve the efficiency of photogrammetric 3D bridge reconstruction with reduced human interventions in image collection and processing.

1 February 2019 in Composite Structures
Verified
Journal Article
Closed access
Enrique Del Rey CastilloEnrique Del Rey Castillo
Enrique Del Rey Castillo
DDDmytro Dizhur
Dmytro Dizhur
MGMichael Griffith
Michael Griffith
JIJason Ingham
Jason Ingham

19 July 2022 in Buildings
Verified
Journal Article
Open access
PDF file
SMSergio Lautaro Castro Miranda
Sergio Lautaro Castro Miranda
Enrique Del Rey CastilloEnrique Del Rey Castillo
Enrique Del Rey Castillo
Vicente A. GonzálezVicente A. González
Vicente A. González
JAJohnson Adafin
Johnson Adafin
Low accuracy in the estimation of construction costs at early stages of projects has driven the research on alternative costing methods that take advantage of computing advances, however, direct implications in their use for practice is not clear. The purpose of this study was to investigate how predictive analytics could enhance cost estimation of buildings at early stages by performing a systematic literature review on predictive analytics implementations for the early-stage cost estimation of building projects. The outputs of the study are: (1) an extensive database; (2) a list of cost drivers; and (3) a comparison between the various techniques. The findings suggest that predictive analytic techniques are appropriate for practice due to their higher level of accuracy. The discussion has three main implications: (a) predictive analytics for cost estimation have not followed the best practices and standard methodologies; (b) predictive analytics techniques are ready for industry adoption; and (c) the study can be a reference for high-level decision-makers to implement predictive analytics in cost estimation. Knowledge of predictive analytics could assist stakeholders in playing a key role in improving the accuracy of cost forecast in the construction market, thus, enabling pro-active management of the project owner’s budget.