The power‐to‐gas (PtG) process, enabling the long‐term indirect storage of electrical energy, includes the water electrolysis for hydrogen production and the subsequent hydrogenation of carbon dioxide in a methanation reactor. The dynamic operation of methanation reactors is favored to limit upstream storage capacities, but not fully understood thus far. Therefore, this contribution investigates the dynamic operation of a fixed‐bed recycle reactor during flow rate ramps with a variation of the ramp time. Load ramps of the volumetric flow rate lead to global maxima during the transition; for the methane content if the flow rate is decreased, and for the gas temperature if the flow rate is increased. Furthermore, the adaptation of the product recirculation during flow rate ramps is discussed at the end. The recycle ratio turns out to provide an additional degree of freedom for stabilizing the reactor behavior under fluctuating feed conditions.
In this study, a low-temperature drying plant based on renewable energies to dry food processing wastes is investigated. The demand-oriented heat supply is realized by a solar wall in combination with a biomass boiler. Due to the operational complexity of such a system with different sub-units and process parameters, steady-state simulations were performed in Aspen Plus to provide an insight into the process. Moreover, a time-resolved energetic evaluation was conducted to analyze the influence of varying capacity of the heat sources and operational strategy in addition to economic calculations. The simulations showed that an overall control strategy needs to consider the air properties as well as the flow rate of wet input material. In the reference case, the boiler must be operated at full load through the year to supply as much heat as possible. The revenue from the dried material was the most crucial parameter on the drying economics. Although the current plant configuration operating at 12 h per day and five days per week enable feasible results, the drying process can be more profitable by doubling the boiler capacity and increasing operational hours to 24 h per day and five days per week. The proposed plant can provide an environmentally friendly and cost-effective solution for the re-valorization of food-processing wastes into added-value compounds.