Modular construction, which involves unit production in factories and on-site work, has benefits such as low cost, high quality, and short duration, resulting from the controlled factory environment utilized. An efficient tower crane lifting plan ensures successful high-rise modular project completion. For improved efficiency, the lifting plan should minimize the reaching distance of the tower crane, because this distance directly affects the tower crane capacity, which is directly related to crane operation cost. In situations where units are lifted from trailers, the trailer-to-tower crane distance can have a significant impact on the tower crane operation efficiency. However, optimization of this distance to improve efficiency has not been sufficiently considered. This research proposes a genetic algorithm optimization model that suggests optimized tower crane and trailer locations. The case study results show that through the proposed model, the project manager can reflect the optimal location selection and optimal tower crane selection options with minimal cost.
In modular construction projects, unit production and onsite work are conducted concurrently, enabling shorter duration, lower cost, and improved quality. Because of the nature of the work, building design details should be determined early in the design phase, which requires information from participants. However, the design process for stick-built construction does not include such information, which leads to errors in design, such as omissions and conflicts of information from participants, causing reworking in the design phase. To reduce errors, an information flow should be identified representing when/what/how the information should be shared, and with whom. This paper proposes an integrated design process based on the information flow. To identify the flow, a precedence relationship between activities is represented using a dependency structure matrix (DSM). Then, the order of activities is rearranged using a partitioning algorithm. In this manner, unnecessary feedback and reverse information flow, which are related to errors, are reduced. Finally, the rearranged activities are proposed as an integrated design process. To validate the impact of the proposed process and methodology, interviews with experts were conducted. The validation results suggest that the project delivery method should also be considered in the early project phase in practical application.
Off-site construction (OSC) offers a promising means to improve the efficiency of construction projects. However, the lack of experience and knowledge regarding its use results in errors in design owing to conflicts and omissions of considerations for OSC projects. To mitigate these problems, the design for manufacturing and assembly (DfMA) is widely used to include the considerations in the OSC design process. Several studies concerning the DfMA application in OSC have been performed, but the comprehensive design process is not suggested for mitigating the aforementioned problems. This study proposes an OSC design process by integrating the fragmented DfMA considerations reported in previous studies. The considerations are identified through a systematic literature review and classified into structural and architectural types. To validate the proposed process, an OSC project design has been undertaken as a case study, wherein a significant portion of the building structure has been modified to comprise precast concrete (PC), instead of its reinforced counterpart, with a demonstrated reduction in the PC element design duration. The proposed process would guide and support the design process for reduction in the duration and errors incurred in the process. Moreover, the process can be considered a design guideline for the execution of future projects.
The public housing demand in Seoul has been continuously increasing, but the available land for housing is insufficient. To meet the demand, the Seoul government is planning to develop small-scale housing in urban areas through various methods. Construction activities for increasing housing capacity cause negative environmental impacts, and this inevitably leads to an increase in the number of civil complaints. The complaints can be mitigated by using offsite construction (OSC) for fabricating components. However, OSC remains underdeveloped in Korea owing to concerns over high project costs. To promote OSC, the government must develop a long-term plan to secure demand for OSC. For such a plan, the number and feasibility of applicable sites in Seoul must be estimated. This study suggests a two-stage research framework: (1) estimate the number of applicable sites in Seoul using GIS and (2) conduct feasibility analyses of these sites through architectural planning. The estimated number of sites was equal to the expected supply of small-scale housing units in Seoul for 8 years, and the selected case sites were identified to be feasible. Therefore, the use of OSC for developing small-scale housing units in Seoul is reasonable. This research differs from previous studies in that the previous use of qualitative studies to promote modular construction was replaced with a quantitative analysis that included the entire Seoul area. Using the research framework, the Seoul government can develop a specific long-term plan based on the quantitative research analysis. Furthermore, manufacturers can develop plans based on the government plan and deliver returns on the higher initial costs. The contractors can reduce the higher project cost and doing so is expected to mitigate the negative perception and to promote modular construction in Korea.