Mounir El Asmar

Dr. Mounir El Asmar

School of Sustainable Engineering and the Built Environment, Arizona State University, Tempe, AZ 85287, USA
orcid

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2013 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
Mounir El AsmarMounir El Asmar
Mounir El Asmar
AHAwad S. Hanna
Awad S. Hanna
WLWei-Yin Loh
Wei-Yin Loh
Integrated project delivery (IPD) is an emerging construction project delivery system that collaboratively involves key participants very early in the project timeline, often before the design is started. It is distinguished by a multiparty contractual agreement that typically allows risks and rewards to be shared among project stakeholders. Because IPD is becoming increasingly popular, various organizations are expressing interest in its benefits to the architecture/engineering/construction (AEC) industry. However, no research studies have shown statistically significant performance differences between IPD and more established delivery systems. This study fills that missing gap by evaluating the performance of IPD projects compared to projects delivered using the more traditional design-bid-build, design-build, and construction management at-risk systems, and showing statistically significant improvements for IPD. Relevant literature was analyzed, and a data collection instrument was developed an...

1 June 2017 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
JSJera Sullivan
Jera Sullivan
Mounir El AsmarMounir El Asmar
Mounir El Asmar
JCJad Chalhoub
Jad Chalhoub
HOHassan Obeid
Hassan Obeid
Measuring the performance of design build (DB), construction manager at risk (CMR), and design-bid-build (DBB) delivery methods has been the subject of many construction research studies. The collective results of these studies are difficult to interpret because the studies extend over decades and some show mixed results as to which delivery method offers superior performance. This paper analyzes the current literature on the three most widely used project delivery methods, and combines the quantitative findings for five performance metrics: cost growth, unit cost, schedule growth, delivery speed, and quality. By combining these results, this paper considers a much larger data set of projects, which leads to more representative results and further confidence in the conclusions. The quantitative results from 30 existing studies representing 4,623 projects are combined, their methodologies are compared and contrasted, and are ordered chronologically to highlight temporal trends. Combining the results from current literature and weighting the findings using each study’s sample size shows that DB is the most effective in controlling cost growth (+2.8% ) as compared with CMR (+5.8% ) or DBB (+5.1% ). No single delivery method consistently performs better on unit cost. CMR and DB were found to be the most accurate in controlling the schedule variation of a project, with an average schedule growth of +10.2 and +10.7% , respectively, as compared with a much higher +18.4% for DBB. Moreover, DB was found to be superior in delivery speed in all explored studies and continues to increase its advantage over time. The study also highlights methodological inconsistencies in the construction literature, which could be standardized to provide more comparable results among future studies. This paper contributes to the body of knowledge by analyzing two decades of project delivery systems literature to compare the cost, schedule, and quality performance of DB, CMR, and DBB delivery systems.

20 March 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
MCMikhail Chester
Mikhail Chester
Mounir El AsmarMounir El Asmar
Mounir El Asmar
SHSamantha Hayes
Samantha Hayes
Cheryl DeshaCheryl Desha
Cheryl Desha
As climate change increases the frequency and intensity of disasters and associated infrastructure damage, Alternative Project Delivery Methods are well positioned to enable innovative contracting and partnering methods for designing and delivering adaptation solutions that are more time- and cost-effective. However, where conventional “build-back-as-before” post-disaster reconstruction occurs, communities remain vulnerable to future disasters of similar or greater magnitude. In this conceptual paper, we draw on a variety of literature and emergent practices to present how such alternative delivery methods of reconstruction projects can systematically integrate “build-back-better” and introduce more resilient infrastructure outcomes. Considering existing knowledge regarding infrastructure resilience, post-disaster reconstruction and project delivery methods, we consider the resilience regimes of rebound, robustness, graceful extensibility, and sustained adaptability to present the potential for alternative project delivery methods to improve the agility and flexibility of infrastructure against future climate-related and other hazards. We discuss the criticality of continued pursuit of stakeholder engagement to support further improvements to project delivery methods, enabling new opportunities for engaging with a broader set of stakeholders, and for stakeholders to contribute new knowledge and insights to the design process. We conclude the significant potential for such methods to enable resilient infrastructure outcomes, through prioritizing resilience alongside time and cost. We also present a visual schematic in the form of a framework for enabling post-disaster infrastructure delivery for resilience outcomes, across different scales and timeframes of reconstruction. The findings have immediate implications for agencies managing disaster recovery efforts, offering decision-support for improving the adaptive capacity of infrastructure, the services they deliver, and capacities of the communities that rely on them.

13 August 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
NCNamho Cho
Namho Cho
Mounir El AsmarMounir El Asmar
Mounir El Asmar
MAMohammad Aldaaja
Mohammad Aldaaja
The built environment is accountable for a substantial share of global waste production. Construction and demolition (C&D) debris requires significant landfill areas and costs billions of USD. A circular economy (CE) is a business model that promotes the efficient use of materials to minimize waste generation and raw material consumption. The success of a CE model can be directly linked to the economic impact for each of the business participants. This study applies the concept of CE to estimate the macro-scale financial impact of key entities that contribute to the unclaimed C&D debris stream in the United States of America (U.S.). This study identifies three recycling steam entities: waste generators, recyclers, and end-users. The result shows that waste generators can save USD 6.5 billion by recycling in comparison to sending the current waste materials to landfills. This study could not find the estimated economic benefit for recyclers, but reasonable profit should be generated for them to sustain the C&D recycling industry. Lastly, end-users benefit by an estimated USD 34 billion, which can be achieved based on the condition of high-value recycling materials. The contribution of this paper is analyzing the macro-scale impact of CE on both business owners and consumers and showing how the impact on consumers cannot be neglected.

1 November 2016 in Journal of Management in Engineering
Verified
Journal Article
Closed access
TFTober Francom
Tober Francom
Mounir El AsmarMounir El Asmar
Mounir El Asmar
SAMUEL ARIARATNAMSAMUEL ARIARATNAM
SAMUEL ARIARATNAM
Much of the water and wastewater pipelines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater pipeline infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as construction manager at risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied. This paper fills this knowledge gap by a...

1 May 2022 in Journal of Management in Engineering
Verified
Journal Article
Open access
PDF file
Vartenie AramaliVartenie Aramali
Vartenie Aramali
Hala SanboskaniHala Sanboskani
Hala Sanboskani
GGG. Edward Gibson
G. Edward Gibson
Mounir El AsmarMounir El Asmar
Mounir El Asmar
NCNamho Cho
Namho Cho
Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.