Vartenie Aramali

Dr. Vartenie Aramali

California State University, Northridge, Northridge, Ohio, USA
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 October 2022 in Materials
Verified
Journal Article
Open access
PDF file
MOHAMMAD MOHTASHAM MOEINMOHAMMAD MOHTASHAM MOEIN
MOHAMMAD MOHTASHAM MOEIN
Ashkan SaradarAshkan Saradar
Ashkan Saradar
Komeil RahmatiKomeil Rahmati
Komeil Rahmati
ASArman Hatami Shirkouh
Arman Hatami Shirkouh
ISIman Sadrinejad
Iman Sadrinejad
Moses KarakouzianMoses Karakouzian
Moses Karakouzian
Impact resistance of Portland cement concrete (PCC) is an essential property in various applications of PCC, such as industrial floors, hydraulic structures, and explosion-proof structures. Steel-fiber-fortified high-strength concrete testing was completed using a drop-weight impact assessment for impact strength. One mix was used to manufacture 320 concrete disc specimens cured in both humid and dry conditions. In addition, 30 cubic and 30 cylindrical specimens were used to evaluate the compressive and indirect tensile strengths. Steel fibers with hooked ends of lengths of 20, 30, and 50 mm were used in the concrete mixtures. Data on material strength were collected from impact testing, including the number of post-first-crack blows (INPBs), first-crack strength, and failure strength. Findings from the results concluded that all the steel fibers improved the mechanical properties of concrete. However, hooked steel fibers were more effective than crimped steel fibers in increasing impact strength, even with a smaller length-to-diameter ratio. Concrete samples containing hybrid fibers (hooked + crimped) also had lower compressive strength than the other fibers. Comparisons and analogies drawn between the test results and the static analyses (Kolmogorov–Smirnov and Kruskal–Wallis) show that the p-value of the analyses indicates a more normal distribution for curing in a humid environment. A significant difference was also observed between the energy absorptions of the reinforced mixtures into steel fibers.

1 May 2022 in Journal of Management in Engineering
Verified
Journal Article
Open access
PDF file
Vartenie AramaliVartenie Aramali
Vartenie Aramali
Hala SanboskaniHala Sanboskani
Hala Sanboskani
GGG. Edward Gibson
G. Edward Gibson
Mounir El AsmarMounir El Asmar
Mounir El Asmar
NCNamho Cho
Namho Cho
Earned value management (EVM) is a project management approach that can enhance the probability of project success. It is applied widely across different industry sectors (e.g., energy, aerospace, construction, defense, and manufacturing), generally through the use of an earned value management system (EVMS). A holistic and up-to-date literature review on EVM and EVMS does not exist. A literature review can provide a comprehensive perspective on the topic, identifying and summarizing the existing body of knowledge, as a foundation to advance the state of practice of EVM/EVMS. Therefore, the objective of this paper is to investigate the EVM/EVMS state of the art by critically reviewing academic and industry publications, with a specific focus on the maturity of EVMS and the environment surrounding its implementation. By performing a systematic literature review, the authors identified 600 publications since the inception of the EVM concept in 1962, and then narrowed down this list to 160 relevant publications from the last decade for closer review. The findings include the discovery of eight emergent themes. Of these themes, “forecasting/prediction” constitutes the largest portion of the recent literature, followed by “application of EVMS.” One interesting finding is that EVMS maturity, although being a critical topic, is only discussed in one publication. Publications focused on EVM/EVMS have increased in the last decade and significant differences were found between academia and industry literature in terms of the limitations and extensions of EVM/EVMS, EVMS environment, and compliance. A key finding is that designing a reliable EVMS should combine both technical and social aspects of implementation. This forward-looking paper provides a state-of-the-art review while highlighting gaps in the existing EVM/EVMS body of knowledge and introducing new perspectives to support EVMS research and application.

1 July 2021 in Journal of Management in Engineering
Verified
Journal Article
Closed access
PDF file
Vartenie AramaliVartenie Aramali
Vartenie Aramali
GGG. Edward Gibson
G. Edward Gibson
MAMounir El Asmar
Mounir El Asmar
NCNamho Cho
Namho Cho
For more than five decades, Earned Value Management Systems (EVMS) have been applied by organizations to manage their projects in different industries. However, many organizations still struggle to apply Earned Value Management (EVM) techniques to assess and reliably control their project outcomes. This work investigated the state of practice of EVMS. This paper identifies challenges facing practitioners, critical EVMS subprocesses, and key EVMS environment factors, based on a large survey of 294 expert respondents. Sample respondents had project management experience of greater than 20 years on average, and represented a diverse set of projects and industries (e.g., capital projects, aerospace, defense, energy, and others). The responses from this survey helped craft an agreed-upon set of definitions for EVM, EVMS, EVMS maturity, and EVMS environment that are all provided in this paper. Moreover, out of 10 total EVMS subprocesses, planning and scheduling was ranked as the subprocess with the greatest impact on EVMS, by far. When ranking the top factors that impact the EVMS environment, the following factors rose to the top: organizational culture; efficient EVMS development process; leadership’s past EVMS experience; effective and accountable leadership; and quality and level of data available. Moreover, leadership attitude toward EVMS was found to be the most critical EVMS challenge, by a wide margin. Comparing different perspectives, the data showed that project/program owners consider EVM implementation costs to be a major challenge, while contractors and consultants consider adequate calendar time needed for preparing EVMS to be a critical EVMS environment factor. Overall, this paper contributes to the engineering management body of knowledge by identifying the most important subprocesses and factors of a high-performing EVMS applied to a diverse array of complex projects and programs (e.g., aerospace, defense, construction, software, etc.) and uncovering corresponding key challenges.

1 September 2025 in Project Leadership and Society
Verified
Journal Article
Open access
Vartenie AramaliVartenie Aramali
Vartenie Aramali
NCNamho Cho
Namho Cho
FPFalguni Pande
Falguni Pande
M.K.S. Al-MhdawiM.K.S. Al-Mhdawi
M.K.S. Al-Mhdawi
UOUdechukwu Ojiako
Udechukwu Ojiako
AQAbroon Qazi
Abroon Qazi

9 November 2020
Verified
Conference Paper
Closed access
PDF file
NCNamho Cho
Namho Cho
MAMounir El Asmar
Mounir El Asmar
GGG. Edward Gibson
G. Edward Gibson
Vartenie AramaliVartenie Aramali
Vartenie Aramali
Supporting project management decisions using an earned value management system (EVMS) brought significant benefits to control schedule and cost for government owners and contractors. However, the lack of a holistic approach in developing and applying an EVMS that is strongly tied to established guidelines tends to cause confusion. This study analyzes existing EVMS studies and suggests management considerations for successful EVMS implementation. Based on a review of literature, this paper identifies a need for improving the reliability of EVMS. Technical guidelines assist in the application of EVM good practices, which can lead to a reliable EVMS. Moreover, the literature review emphasizes that a parallel assessment considering non-technical elements such as the organizations’ management culture, is essential to improve reliability.

1 November 2022 in Journal of Construction Engineering and Management
Verified
Journal Article
Open access
PDF file
GGG. Edward Gibson
G. Edward Gibson
Hala SanboskaniHala Sanboskani
Hala Sanboskani
Mounir El AsmarMounir El Asmar
Mounir El Asmar
Vartenie AramaliVartenie Aramali
Vartenie Aramali
Methods to collect data in construction engineering and management (CEM) research are evolving, informed by recent technological advancements. One such method is research charrettes that allow effective interactions and knowledge sharing between expert industry practitioners and academic researchers, all colocated in a single venue, enabling rich data collection and live communication. A pivot point in technological evolution occurred with the COVID-19 pandemic, forcing a global shift to remote work. Hence, planned in-person research charrettes had to shift to remote sessions, relying on virtual conferencing platforms and online data collection mechanisms. Technology-enabled charrettes have allowed the authors to collect significantly richer data sets and ensure a more diverse representation of participants, while saving tremendous amounts of time. With the continuing emergence of technological applications, the world might not go back to functioning fully in person. The authors believe remote research charrettes (RRCs) will still be used in a post-COVID-19 world because of their superior performance. This paper builds on a previous publication that described traditional research charrettes as a method to enhance CEM research a decade ago; it offers a significantly updated and improved RRC method based on the knowledge gained from transitioning a dozen in-person charrettes into RRCs. It also presents performance comparisons between RRCs and traditional charrettes by quantifying metrics indicating how RRCs are more time-efficient and cost-saving, harness more participants from more diverse locations, and enable the collection of richer data sets and four times more industry comments and expert feedback. This paper also provides guidance on the integration of technology with traditional research charrettes, hence contributing to the CEM body of knowledge.