A suitable indoor climate positively affects the lifespan of historical building structures. The path to an agreeable climate begins with monitoring current conditions. Considerable attention is given to monitoring the indoor climate of historical buildings. The motivation for monitoring air temperature and surface temperatures, relative air humidity or airflow can be, for example, the installation of heating, the occurrence of biotic damage, and others. Through the analysis of the most frequently used keywords, a strong connection was found, for example, between thermal comfort and the church. This review also summarises the various reasons for conducting microclimate monitoring studies in historical religious buildings on the European continent. It is supplemented with an evaluation of the monitoring methodology from the chosen period of the year point of view, the measured parameters, and the length of the interval between the recordings of quantities. It was found that in more than one-third of the cases, the recording time was less than or equal to 15 min, but mostly less than or equal to 1 h. Quite often, monitoring results are used to calibrate a simulation model describing the hydrothermal behaviour of a historical object under various operation alternatives (e.g., influence of ventilation, climate change, occupancy, etc.). This way, it is possible to test various intelligent systems in the virtual world without much risk before they are used in an actual building application.
The subject of the following analysis is the Research Centre building of the University of Zilina (RC UNIZA), which was purposely designed as a low-carbon project. The measurements of selected offices were carried out to verify how the building envelope and infill cooling system influences the indoor environment during the summer season. These measurements, along with the parameters of outdoor climate and its influence on the indoor thermal-humidity microclimate were monitored. Most of the data was then used in subsequent transient-state thermal simulation in an ESP-r program. The evaluation took two days to complete wherein an air-cooling system and ceiling radiant cooling were presented. The office during the test was not occupied and was therefore slightly cooler. Under these conditions (measured and simulated), PPD and PMV indexes were calculated during a 10 h time period with varying input parameters (metabolic heat and thermal resistance of clothing). According to the measurement and simulation, these indexes were compared. The comparison shows that the agreement depends on the chosen personal factors such as the thermal resistance of the clothing and metabolic heat. If these are chosen appropriately, then the differences between the results according to the measurement and the simulation were limited.
The paper considers the issue of the thermal refurbishment of residential buildings built between 10 and 40 years ago in some European countries. It suggests that, while facade retrofitting is the most effective solution for older dwellings, all actions are equally less effective for newer dwellings built in this millennium. According to the current situation, as society shifts away from the use of fossil fuels, this paper presents the expected energy and financial savings that were calculated using one of four different heating sources. The study shows that the efficiency of the additional thermal retrofitting of the structures is low when the building is heated with a heat pump. The addition of thermal insulation to already well-insulated roofs or floors results in minimal savings of approximately 0.15 kWh per square meter of heated floor area per year. The potential advantage of replacing existing windows with new windows in a top thermal quality was shown. After window replacement, the financial benefits could be twice as high in houses heated by district heating compared to houses heated by gas or a heat pump, including an alternative heat pump with photovoltaics.
For a deep understanding of the airflow in an environment of historic wooden trusses, it is necessary to analyze the object using simulation methods. To calculate the amount of air passing through the structural openings (components) using dynamic simulation, multi-zone network models based on the simplicity of modeling the individual zones are suitable. For a more detailed analysis of airflow and temperature distribution within one space, a computational fluid dynamics (CFD) simulation model was performed. The air volume through openings and surface temperatures was adopted from the multi-zone airflow network model. By using this simulation technique during a sunny summer day four characteristic states of air movement were simulated in the attic: more intense flow at noon and at midnight caused by a large temperature difference between air and surrounding surfaces and, subsequently, less intense flow when the air was mixed up effectively. The temperature distribution in the cross-sections did not only indicate an increase in temperature with increasing height (up to 50 °C at noon) but also a temperature increase near the southern roof. The surface temperature of the masonry walls was stable (19–33 °C), while the air temperature fluctuated. The image of the flow was completed by ventilation through the tower, which acted as a solar chimney. The airflow through the door to the tower was almost 0.5 m3 s−1 at summer midnight.
In the case of existing prestressed concrete structures, information about the actual state of prestressing is an important basis for determining their load-carrying capacity, as well as remaining service lifetime. This is even more important in the case of existing prestressed concrete bridges, which are exposed to a more aggressive environment than the other prestressed concrete structures. The level of prestressing is affected and reduced by prestress losses at a given time. In calculating the internal forces and stresses, required for the assessment of the Ultimate Limit State and the Serviceability Limit State, it is necessary to know not only the prestressing level but also the cross-sectional area of the prestressing steel (wire, strand or cable), which can change in time due to corrosion. In practice, in the case of the pre-tensioned concrete members, it has often happened in the past that cable ducts have been grouted only partially, or not at all, due to poor grouting technology. Experts did not realize what this could cause in the future—the penetration of water with aggressive agents directly into the cable duct and consequently corrosion of the prestressing steel, which means not increased protection of the steel, but rather acceleration of degradation. On the other hand, in many cases, corrosion also occurs in ducts that are not grouted and no water has entered them. This paper deals with this phenomenon—the formation of corrosion of prestressing steel in cable ducts in ungrouted ducts due to moisture. This problem was investigated experimentally and numerically in the simulation program ESP-r. Experimental measurements and numerical simulations have shown that the water vapor condenses in the cable ducts, which can subsequently cause corrosion of the prestressing steel.
The airtightness of buildings is an essential topic regarding energy preservation. The development of new and more sophisticated materials and technology approaches is inevitable. Uncontrolled infiltration is undesirable in buildings with lower energy demands with regulated ventilation. Envelope structure, building method, quality, and others are the main factors influencing the airtightness of the building. However, the correlation between airtightness and climatic factors is less known and researched. This paper comprises measurements of a critical timber-house corner in climatic chambers. It captures the correlation between airtightness and gradual temperature and relative humidity adjustments, simulated from the exterior side. The initial timber moisture content was 12%, and during the experiment it increased with the exterior conditions to 18%. Afterward, we simulated conditions causing a humidity decrease while measuring airtightness. The drying process caused a decrement in airtightness by 18%. In addition to this experiment, this paper also analyses two methods of an airtight membrane connection—constricting or taping the contact. The discrepancy between those two methods was more than 21% in favor of tape.