Being a small country with a huge population Bangladesh is commonly known as an agriculture based nation. Per capita land in comparison to the number of people is very insignificant and hence the management of land system holds a vital role in the economic and social aspects of this country. Eventually the land management system of this country urges to grow into a very efficient system. Unfortunately the reality is lagging behind too far and the land management system of this country has gradually become a burdensome matter which is now entirely impotent to encounter the newly evolving land issues and problems. Majority of the conflicts and quarrels in rural as well as urban areas arise as a result of the inefficient and corrupted land systems which in turns often create a long term problem. Nevertheless, some researchers have tried to come up with a solution but none could make it work. The implement level tasks have remained unexplored in some way or other and consequently the land management system have failed to realize its goals. In a nutshell, the land management system is concerned with two major issue-land surveying and land management. Only eyeing to one issue neglecting to face the other one will not come up with a fruitful upshot. Out of this fact identified, the paper proposes a model land management system which offers both the solutions-GPS based land surveying and online land management encompassing an assortment of web based participatory services. We have also implemented our solution using some real life scenario and data and tried to face the real life complications and hitches.
This paper presents the design and prototype implementation of USenSewer, an automated sewerage management system that uses Arduino microcontroller coupled with an ultrasonic sensor, a NRF module and a GSM module to automate the routine checkup and removal of drain blockage vital for the continuous waste water flow in the big cities. The proposed system consists of three main components; the blockage detection system which is placed inside the drain, the blockage removal system which is placed above the ground level and a control center which controls and coordinates the collection of waste materials placed by the first two components. Several pilot installations of the system in the city of Dhaka have shown that the proposed system significantly outperforms the state-of-the-art manual systems prevailing in the city from the scalability, flexibility and economic point of view.