The objective of this study was to propose a control method with a ventilation requirement of variable air volume (VAV) system in multi-zone. In order to control the VAV system inmulti-zone, it is essential to control the terminal unit installed in each zone. A VAV terminal unit with conventional control method using a fixed minimum air flow can cause indoor air quality (IAQ) issues depending on the variation in the number of occupants. This research proposes a control method with a ventilation requirement of the VAV terminal unit and AHU inmulti-zone. The integrated control method with an air flow increase model in the VAV terminal unit, AHU, and outdoor air intake rate increase model in the AHU was based on the indoor CO2 concentration. The conventional and proposed control algorithms were compared through a TRNSYS simulation program. The proposed VAV terminal unit control method satisfies all the conditions of indoor temperature, IAQ, and stratification. An energy comparison with the conventional control method showed that the method satisfies not only the indoor thermal comfort, IAQ, and stratification issue, but also reduces the energy consumption.
The Korean government is fostering a renewable energy industry as a means of handling the energy crisis. Among the renewable energy systems available, geothermal energy has been highlighted as highly efficient, safely operable and relatively unaffected by outdoors air conditions. Despite the increasing use of renewable energy, the devices using renewables may not be operating appropriately. This study examined current problems in the operation of a geothermal heat pump (GHP) system. The efficiency of a geothermal heat pump system to studied to maximize the operation plan. Our study modelled the target building and analyzed the energy using TRNSYS, which is a dynamic energy simulation tool, to apply the coefficient of performance (COP) and evaluate the operation method. As a result, the GHP total energy consumption from the COP control method was reduced by 46% compared to the current operation. The proposed control method was evaluated after applying the system to a building. The results showed that efficient operation of a geothermal heat pump system is possible.
In this study, we developed a virtual air flow sensor using an in-situ damper performance curve to secure the stability of control of the variable air volume (VAV) terminal unit, and also established the in-situ measurement procedure. The minimum air flow rate of the VAV terminal unit was related to the energy consumption, it was important to determine the minimum air flow rate suitable for the situation of each room in terms of energy saving. However, it was difficult to set the minimum air flow rate low setpoint due to the low accuracy of the air flow sensor of the VAV terminal unit. This paper suggested a virtual air flow sensing method using an in-situ damper performance curve in the VAV terminal unit. The input factors of the virtual sensor were developed on the basis of the supply fan speed and damper opening ratio, which could be easily obtained from the existing control system. In addition, the in-situ measurement procedure of the virtual air flow sensor was developed by dividing the procedure into five steps. Finally, reliability of the virtual air flow sensor was evaluated through uncertainty analysis of input variables and relative error analysis, in comparison with the conventional air flow rate measurement method. The developed virtual air flow sensor was found to have an uncertainty of up to 8.8%, and it was also found that the closer to the maximum the values of the input variables, the lower the uncertainty. In addition, verification of relative error with respect to the measured values by the hot-wire anemometer was conducted by varying operation conditions to a total of 12 cases, and as a result, relative error was found to be up to 5.6%. In addition, the results of long-term experiment showed that relative error was within about 9.5%, and thus, the feasibility for field application and control was confirmed.
This study reviewed the existing studies on the types of variable air volume (VAV) terminal units, control and operation methods, prediction models, and sensor calibration methods. As a result of analyzing the existing research trends on the system type, characteristics, and control method of VAV terminal units studies such as theoretical verification and energy simulation were conducted to improve the existing control methods, reset the set value using a mathematical model, and add a monitoring sensor for the application of control methods. The mathematical model used in the study of VAV terminal unit control methods was used to derive set values for minimum air volume, supply temperature, ventilation requirements, and indoor comfort. The mathematical model has a limitation in collecting input information for professional knowledge and model development, and development of a building environment prediction model using a black box model is being studied. The VAV terminal unit system uses a sensor to control the device, and when an error occurs in the sensor, indoor comfort problems and energy waste occur. To solve this problem, sensor calibration techniques have been developed using statistical models, mathematical models, and Bayesian statistical models. The possibility of developing a method for calibrating the variable air volume terminal unit sensor using the prediction model was confirmed. In conclusion, the VAV terminal unit system is one of the most energy efficient systems. The energy saving potential of current VAV systems can still be improved through control methods, the use of predictive models, and sensor calibration methods.
Considerable efforts have been made to reduce the energy consumption of buildings due to the energy crisis, and, the Korean government has supported the use of renewable energy through various grants. Among the possible renewable energy sources, geothermal energy can be used regardless of the outside weather. Therefore, energy consumption can be reduced considerably in summer and winter. Despite the increasing use of renewable energy, the use of renewables has not been operating appropriately. Therefore, this study examined some of the problems of the operation of renewable energy and some possible improvements. The aim of the study is to evaluate a building containing an actual installed multi-geothermal heat pump (Multi-GHP) system, in terms of the energy efficiency. In addition, this study evaluated the present control system and the method of complex operation regarding existing heat sources systems and GHP systems through a simulation. The results can be regarded as the result of a hybrid operation method for the improvement of an existing operation. Therefore, the Multi-GHP system energy use of a hybrid operation condition of the Multi-GHP systems and the absorption (ABS) chiller-heater system was reduced compared to the operation condition of the Multi-GHP system, and the total energy consumption of the heat source equipment was reduced. The proposed operation plan was evaluated after applying the system to a building. These results showed that the efficient operation of a Multi-GHP hybrid operation method is possible. As a result, the GHP energy use of Multi-GHP systems and the ABS chiller-heater system was reduced by 30% compared to existing operation and the total energy consumption of heat source equipment was reduced by 78%.
Accurate measurement of air flow rate is essential in automatic building control using the variable air volume (VAV) system. In order to solve the problems of the existing air flow measurement method and improve the accuracy of air flow control, this study developed a data-based multiple regression air flow prediction model. The independent variables used in the development of the predictive model were selected as the factors used for control and monitoring when operating with variable air flow rate in the existing air conditioning system. Data collection and correlation between independent variables and air flow rate of the terminal unit were analyzed. Using the IBM SPSS statistics version 25, an air flow rate prediction model was developed using multiple regression analysis. Reliability of model was evaluated by comparing the measured airflow. The relative error of −9.3% to 10.4% is shown when comparing the estimated air flow rate by the developed model with the measured air flow rate.