The Korean government is fostering a renewable energy industry as a means of handling the energy crisis. Among the renewable energy systems available, geothermal energy has been highlighted as highly efficient, safely operable and relatively unaffected by outdoors air conditions. Despite the increasing use of renewable energy, the devices using renewables may not be operating appropriately. This study examined current problems in the operation of a geothermal heat pump (GHP) system. The efficiency of a geothermal heat pump system to studied to maximize the operation plan. Our study modelled the target building and analyzed the energy using TRNSYS, which is a dynamic energy simulation tool, to apply the coefficient of performance (COP) and evaluate the operation method. As a result, the GHP total energy consumption from the COP control method was reduced by 46% compared to the current operation. The proposed control method was evaluated after applying the system to a building. The results showed that efficient operation of a geothermal heat pump system is possible.
Considerable efforts have been made to reduce the energy consumption of buildings due to the energy crisis, and, the Korean government has supported the use of renewable energy through various grants. Among the possible renewable energy sources, geothermal energy can be used regardless of the outside weather. Therefore, energy consumption can be reduced considerably in summer and winter. Despite the increasing use of renewable energy, the use of renewables has not been operating appropriately. Therefore, this study examined some of the problems of the operation of renewable energy and some possible improvements. The aim of the study is to evaluate a building containing an actual installed multi-geothermal heat pump (Multi-GHP) system, in terms of the energy efficiency. In addition, this study evaluated the present control system and the method of complex operation regarding existing heat sources systems and GHP systems through a simulation. The results can be regarded as the result of a hybrid operation method for the improvement of an existing operation. Therefore, the Multi-GHP system energy use of a hybrid operation condition of the Multi-GHP systems and the absorption (ABS) chiller-heater system was reduced compared to the operation condition of the Multi-GHP system, and the total energy consumption of the heat source equipment was reduced. The proposed operation plan was evaluated after applying the system to a building. These results showed that the efficient operation of a Multi-GHP hybrid operation method is possible. As a result, the GHP energy use of Multi-GHP systems and the ABS chiller-heater system was reduced by 30% compared to existing operation and the total energy consumption of heat source equipment was reduced by 78%.