Dita Hořínková

Mrs. Dita Hořínková


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
VMVít Motyčka
Vít Motyčka
JOZEF GAŠPARÍKJOZEF GAŠPARÍK
JOZEF GAŠPARÍK
OPOto Přibyl
Oto Přibyl
MŠMartin Štěrba
Martin Štěrba
DHDita Hořínková
Dita Hořínková
RKRadka Kantová
Radka Kantová
The quality of preparations carried out before building work commences has a significant impact on the smooth running and overall financial costs of a construction project. The use of construction machinery, which is crucial with regard to the efficiency of the construction process, plays an important role. In building construction, the machines in question are mainly tower cranes. The paper presents a new method for assessing the utilisation of tower cranes over time during the construction of reinforced concrete monolithic structures. The method, which contributes to the efficient utilisation of such cranes, is based on a mathematical simulation model that predicts the work cycles of a tower crane during a work shift when work is being performed on individual construction sub-processes. Construction sub-processes are analysed in detail with regard to the service provided to them by a tower crane. Data can also be obtained from binding construction schedules and boundary conditions, which in every case are for a specific executed construction project. The simulation model of the work of tower cranes has been developed for use in software applications. The created application expands the possibilities of smart construction site design in a digital environment and can also be used directly from an internet browser.