Vít Motyčka

Mr. Vít Motyčka

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 April 2022 in Buildings
Verified
Journal Article
Open access
PDF file
VMVít Motyčka
Vít Motyčka
JOZEF GAŠPARÍKJOZEF GAŠPARÍK
JOZEF GAŠPARÍK
OPOto Přibyl
Oto Přibyl
MŠMartin Štěrba
Martin Štěrba
DHDita Hořínková
Dita Hořínková
RKRadka Kantová
Radka Kantová
The quality of preparations carried out before building work commences has a significant impact on the smooth running and overall financial costs of a construction project. The use of construction machinery, which is crucial with regard to the efficiency of the construction process, plays an important role. In building construction, the machines in question are mainly tower cranes. The paper presents a new method for assessing the utilisation of tower cranes over time during the construction of reinforced concrete monolithic structures. The method, which contributes to the efficient utilisation of such cranes, is based on a mathematical simulation model that predicts the work cycles of a tower crane during a work shift when work is being performed on individual construction sub-processes. Construction sub-processes are analysed in detail with regard to the service provided to them by a tower crane. Data can also be obtained from binding construction schedules and boundary conditions, which in every case are for a specific executed construction project. The simulation model of the work of tower cranes has been developed for use in software applications. The created application expands the possibilities of smart construction site design in a digital environment and can also be used directly from an internet browser.

22 December 2021 in Sustainability
Verified
Journal Article
Open access
PDF file
JOZEF GAŠPARÍKJOZEF GAŠPARÍK
JOZEF GAŠPARÍK
VMVít Motyčka
Vít Motyčka
PŠPatrik Šťastný
Patrik Šťastný
SSSylvia Szalayová
Sylvia Szalayová
The optimization of mechanized construction processes has a very important impact on economic and environmental sustainability. Our analyses evaluate key factors that affect the quality, environment, and economics of mechanized earth processes. This paper also presents approaches in this area in Slovakia and abroad, and existing mathematical models for the optimal design of earthmoving machinery. The main goals of our paper are the proposal of a method of machine selection for excavation including a multi-criteria optimization method with software support and application and verification of this method in a model example. A total of nine scientific methods applied in our paper are analyzed. The key results of the research work in terms of the set goals are given in the Conclusion, where the key research results are summarized. The results of the research work presented in the paper have a direct impact on economic and environmental sustainability, which can be achieved already in the phase of construction preparation. Applications of information technologies in multi-criteria optimization of the selection of construction machines for earth processes enables their use in the BIM (building information modeling) model.

9 October 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
RKRadka Kantová
Radka Kantová
VMVít Motyčka
Vít Motyčka
Current requirements of employers in the construction industry are aimed at strengthening the link between schools and the manufacturing sector. It is desirable that the students are during their studies already involved in the investment construction process, at least as part-time workers. At the Faculty of Civil Engineering in Brno, Czech Republic, this is being ensured by the accredited course Professional Practical Training. The aim of this contribution is to evaluate and analyze the inclusion of this student internship as a mandatory part of the study to present how many students worked for which construction companies during a period of 10 years, indicating the number of successfully completed internships for individual academic years. At the same time, the boundary conditions for this practice are described. The hypothesis to be confirmed is that the conditions are set in such a way as to be a prerequisite for successful fulfillment. Descriptive statistics are based on a sample of 92 employers involved in the system of securing professional practices for the period 2010 to 2020. The analysis showed that each year about 70–75% of students stay with the same company for their further part-time work during the remainder of their studies, and they may also stay for subsequent graduate employment. A total of 507 students started and finished their internship. Moreover, in the following years of practice, some of the graduates of the field became responsible for the tutoring of other student’s work experience on the construction site. Having previously gone through the same educational scheme, it allows them to lead and evaluate students with an optimal degree of constructive criticism.

27 October 2014 in Advanced Materials Research
Verified
Journal Article
Closed access
PDF file
RKRadka Kantová
Radka Kantová
VMVít Motyčka
Vít Motyčka
The article addresses the problem of noise from the perspective of protected building space near the construction. If they are near a building already populated, the residents should not be exposed to elevated noise burden, and according to Government Regulation No. 272/2011 of 24 August 2011 on health protection before adverse effects of noise and vibrations, which are set noise limits. In the process optimization production planning is therefore necessary to address the areas of in-situ noise, its creation, modeling, design methodologies to assess the overall noise at the site. The Article analyzed the issue introduction of new approaches when optimizing for the site and the necessity aspects of noise pollution site in construction technological preparations for the construction. The article defines in detail the sources of noise during construction, dealing with modeling of site noise sources and the value of the protected space structures. It presents examples of noise studies, where captured effect of noise on the nearest places protected sites and residential areas. Presents the methodology of work with the values of the inputs and outputs when working with software support.

2 December 2016
Verified
Conference Paper
Closed access
VMVít Motyčka
Vít Motyčka
LKL Klempa
L Klempa