Isabel Martins

Dr. Isabel Martins


Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 June 2008 in Operations Research
Verified
Journal Article
Closed access
MCMiguel Constantino
Miguel Constantino
IMIsabel Martins
Isabel Martins
José G. BorgesJosé G. Borges
José G. Borges
Forest ecosystem management often requires spatially explicit planning because the spatial arrangement of harvests has become a critical economic and environmental concern. Recent research on exact methods has addressed both the design and the solution of forest management problems with constraints on the clearcut size, but where simultaneously harvesting two adjacent stands in the same period does not necessarily exceed the maximum opening size. Two main integer programming approaches have been proposed for this area restriction model. However, both encompass an exponential number of variables or constraints. In this work, we present a new integer programming model with a polynomial number of variables and constraints. Branch and bound is used to solve it. The model was tested with both real and hypothetical forests ranging from 45 to 1,363 polygons. Results show that the proposed model's solutions were within or slightly above 1% of the optimal solution and were obtained in a short computation time.

1 March 2005 in European Journal of Operational Research
Verified
Journal Article
Closed access
IMIsabel Martins
Isabel Martins
MCMiguel Constantino
Miguel Constantino
José G. BorgesJosé G. Borges
José G. Borges

1 May 2020 in European Journal of Operational Research
Verified
Journal Article
Closed access
TNTeresa Neto
Teresa Neto
MCMiguel Constantino
Miguel Constantino
IMIsabel Martins
Isabel Martins
JPJoão Pedro Pedroso
João Pedro Pedroso

20 July 2012 in TOP
Verified
Journal Article
Closed access
PDF file
IMIsabel Martins
Isabel Martins
MYMujing Ye
Mujing Ye
MCMiguel Constantino
Miguel Constantino
MFMaria da Conceição Fonseca
Maria da Conceição Fonseca
JCJorge Cadima
Jorge Cadima

22 January 2013 in International Transactions in Operational Research
Verified
Journal Article
Closed access
PDF file
TNTeresa Neto
Teresa Neto
MCMiguel Constantino
Miguel Constantino
IMIsabel Martins
Isabel Martins
JPJoão Pedro Pedroso
João Pedro Pedroso

13 October 2015 in Scandinavian Journal of Forest Research
Verified
Journal Article
Closed access
PBPaulo Borges
Paulo Borges
IMIsabel Martins
Isabel Martins
EBEven Bergseng
Even Bergseng
TETron Eid
Tron Eid
TGTerje Gobakken
Terje Gobakken
Green-up requirements are of great interest for forests near cities since these forests are commonly used for recreational activities by the local population as well as for commercial forestry activities. We present three formulations to establish green-up requirements, based on a dynamic green-up approach and constructed by means of: (i) a predefined fixed length for the green-up time, (ii) a predefined variable length for the green-up time and (iii) height information produced by the growth simulator. Additionally, restrictions on harvested volume and maximum open areas were applied. All the green-up formulations were applied to five datasets comprising different initial forest conditions regarding age and site index distribution. Results show that higher net present values are obtained by the formulation that allow a predefined variable length for the green-up time and by using the height information from the growth simulator compared to the formulations using a predefined fixed length for the green-up time. The increase in NPV was most pronounced for the old forest datasets and varied between 4.23% and 8.15%. The optimal solution was always found when modeling the green-up requirement using the height information. This formulation also tended to find optimal solutions faster than other formulations.