Rapid development, urbanization, and population growth have contributed to water stress in many parts of the world. As freshwater sources are finite, it is essential to source for alternatives to ensure water security. Reclamation of non‐conventional water sources (i.e., rainwater and greywater) can be a viable alternative to alleviate water stress. In this work, various laboratory, pre‐commercialization scale, and commercialized products for rainwater harvesting and greywater treatment and reuse were reviewed. As a result, a conceptual framework is proposed to provide an overview on the applicability of technologies under various settings, which were mapped against the intended use of treated water and the potential for water supply expansion. This conceptual framework could aid decision makers in deciding on a suitable decentralized solution for water reclamation depending on limiting criteria. Decentralized systems of rainwater harvesting and greywater treatment for reuse are going to be crucial in reducing the dependence on the centralized water supply.This article is categorized under: Engineering Water > Planning Water Water and Life > Conservation, Management, and Awareness Science of Water > Water Quality
Many of the obstacles to effective delivery of rail projects (in terms of cost, time and quality) can be traced back to poor collaboration across complex design teams and supply chains. As in any infrastructure delivery process, it is important to make decisions collaboratively at an early design stage. Advanced systems such as Building Information Modelling (BIM) and Geographic Information Systems (GIS) can facilitate collaboration during the decision-making process and boost work efficiencies. Such potential benefits are not realised because the roles of BIM and GIS in facilitating collaboration are not clearly understood or articulated. This paper aims to identify and articulate collaboration requirements during the design stage of rail projects. To achieve this, a mixed-method approach was employed to examine the issues that hinder collaboration in rail projects. An online questionnaire was designed to assess the state-of-art in BIM and GIS, followed by fifteen follow-up face to face interviews with experts to identify collaboration issues and suggestions to overcome them. The research identified the main challenges to effective collaboration and provided suggestions to overcome them. The main challenges were managing information and a reluctance to use new collaboration technologies. The main solution which emerged from the data was to develop an original Collaborative Plan of Work (CPW). The developed CPW is tailored to rail projects and has been formulated by combining the RIBA (Royal Institute of British Architects) Plan of Work and the GRIP Stages (Governance for Railway Investment Projects). This comprehensive plan of work, which is uniquely collaboration-focused, is significant because it can be further developed to formulate a precise process model for collaboration during the design process of rail projects. Such a process can (for example) be configured into the workflow prescribed by a Common Data Environment.
1 September 2021 in Journal of Environmental Management
In UAV (unmanned aerial vehicle) oblique photogrammetry, the occlusion of ground objects, particularly at their base, often results in low-quality real-scene 3D models. To address this issue, we propose a method to enhance model quality by integrating ground-based camera images. This innovative image acquisition method allows the rephotographing of areas in the 3D model that exhibit poor quality. Three critical parameters for reshooting are the reshooting distance and the front- and side-overlap ratios of reshooting images. The proposed method for improving 3D model quality focuses on point accuracy, dimensional accuracy, texture details, and the triangular mesh structure. Validated by a case study involving a complex building, this method demonstrates that integrating ground camera photos significantly improves the overall quality of the 3D model. The findings show that optimal settings for reshooting include a distance (in meter units) of 1.5–1.6 times the camera’s focal length (in millimeter units), a front overlap ratio of 30%, and a side overlap ratio of 20%. Furthermore, we conclude that an overlap rate of 20–30% in reshooting is a usable value.
1 September 2025 in Journal of Computing in Civil Engineering
Countless efforts were conducted worldwide to obtain the BIM position of markets. Yet, a gap in the contemporary literature to comprehensively assess construction markets’ BIM adoption status (CMBAS) exists. A comprehensive assessment will assist decisionmakers in making insightful decisions regarding the wide adoption of BIM in order to make appropriate strategic decisions. The authors designed a tool to detect the BIM adoption status of construction markets comprehensively to ensure a complete understanding of CMBAS when designing BIM initiatives. The tool was applied to Egypt as an example of a developing market and verified and validated through experts’ reviews. A comparative analysis was performed to benchmark the BIM status of this market throughout the years. Appropriate research methods, sampling techniques, and descriptive and inferential analyses were deployed. It was concluded that BIM professionals in Egypt can play an essential role in spreading BIM to the construction market. The market is changing from the use of AutoCAD 2D to other BIM tools; however, more than half the market reached high BIM levels mostly through self-training, particularly with the deficiency of relevant university courses. A CMBAS tool will facilitate benchmarking BIM status among countries to assist in closing technological gaps with the evolving digital transformation.